Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹12.2 Cr
EMD Value
₹9.4 L
Closing Date
26 Dec 2019, 1:00 pmClosed
CHIEF ENGINEER PROJECT VARTAK
HQ CE PROJECT VARTAK C/O 99 APO PIN 931716
PROVIDING AND LAYING OF 150MM X 2 LAYERS OF CEMENTITIOUS BASE CTB INCLUDING PREPARATION OF SOIL BED FINISHED WITH 10MM THICK SAMI LAYER OVER MECHANICALLY CHISELLED MECHANICALLY CLEANED CTB SURFACE DULY PRIMED WITH PRIMER COAT FOR THE SURFACING WORK
2019_BRO_523084_1
CE(P)/VTK/24/2019-20
Open Tender
Civil Works - Roads
365 days
Km 0PT00 to Km 2PT800 and Km 8PT800 to Km 10PT980
15 documents required · 15 mandatory
₹0
₹9.4 L
Yes
HQ CE PROJECT VARTAK
7 Jan 2020
29 Nov 2019
27 Dec 2019
30 Nov 2019
26 Dec 2019
10 Dec 2019
1 Dec 2019 - 7 Dec 2019
9 Dec 2019
Part 'A' Work Between Alttitude below 2100 Mtr
Providing and Laying Base Coarse incorporating Chemical Admixture in combination with OPC Grd. 43 - “Providing and Laying of 150mm X 2 Layers of Cementitious Base (CTB) including Preparation of Soil Bed, for the Surfacing Works in Accordance With Relevant Clauses Of IRC37:2018 and IRC-SP-89:2018
Providing and Laying SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB Layer by means of Synchronous Chip Sealer Integrated Computer Controlled Machinery. SAMI Layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately Covered with Stone Chips as per relevant clauses of IRC37:2012, IRC-110:2005 & IRC-SP-34:1989 and as per tender specifications.
Providing and Laying Primer Coat over CTB Layer and prior to application of SAMI Layer. The Application of Primer Coat shall comprise of 1ST roughening the cured CTB top turf by means of mechanically chiseling and removing any undesirable dry skin followed by cleaning by mechanically brooming -off and/or removal of the muck using tractor driven pressure compressors. 2nd – application of the SS-1 Grade Bitumen Emulsion Primer Coat @ 0.75Kg/SqM.
Part 'B' Work Between Alttitude 2101 Mtr to 2400 Mtr
Providing and Laying Base Coarse incorporating Chemical Admixture in combination with OPC Grd. 43 - “Providing and Laying of 150mm X 2 Layers of Cementitious Base (CTB) including Preparation of Soil Bed, for the Surfacing Works in Accordance With Relevant Clauses Of IRC37:2018 and IRC-SP-89:2018
Providing and Laying SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB Layer by means of Synchronous Chip Sealer Integrated Computer Controlled Machinery. SAMI Layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately Covered with Stone Chips as per relevant clauses of IRC37:2012, IRC-110:2005 & IRC-SP-34:1989 and as per tender specifications.
Providing and Laying Primer Coat over CTB Layer and prior to application of SAMI Layer. The Application of Primer Coat shall comprise of 1ST roughening the cured CTB top turf by means of mechanically chiseling and removing any undesirable dry skin followed by cleaning by mechanically brooming -off and/or removal of the muck using tractor driven pressure compressors. 2nd – application of the SS-1 Grade Bitumen Emulsion Primer Coat @ 0.75Kg/SqM.
Part 'C' Work Between Alttitude 2401 Mtr to 2700 Mtr
Providing and Laying Base Coarse incorporating Chemical Admixture in combination with OPC Grd. 43 - “Providing and Laying of 150mm X 2 Layers of Cementitious Base (CTB) including Preparation of Soil Bed, for the Surfacing Works in Accordance With Relevant Clauses Of IRC37:2018 and IRC-SP-89:2018.
Providing and Laying SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB Layer by means of Synchronous Chip Sealer Integrated Computer Controlled Machinery. SAMI Layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately Covered with Stone Chips as per relevant clauses of IRC37:2012, IRC-110:2005 & IRC-SP-34:1989 and as per tender specifications.
Providing and Laying Primer Coat over CTB Layer and prior to application of SAMI Layer. The Application of Primer Coat shall comprise of 1ST roughening the cured CTB top turf by means of mechanically chiseling and removing any undesirable dry skin followed by cleaning by mechanically brooming -off and/or removal of the muck using tractor driven pressure compressors. 2nd – application of the SS-1 Grade Bitumen Emulsion Primer Coat @ 0.75Kg/SqM.
Integrated Pavement Solutions
LSR Logistics Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid