Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-Finance | L1 | Accepted-Finance Selected | |
| 2 | L2₹12.1 L+₹60,385.17 (5.27%)Accepted-Finance 0 DOGRA CHOWK JEWEL JAMMU JAMMU JAMMU KASHMIR 180011 | JAMMU | JAMMU AND KASHMIR | 180011 | L2 | Accepted-Finance Selected |
Tender Value
₹11.5 L
EMD Value
₹22,960
Closing Date
29 May 2026, 3:00 pmClosed
The Executive Engineer (E)
The Executive Engineer (E), EMD South East, PWD, Thyagraj Sports Complex, New Delhi-110003
(SH- Comprehensive Maintenance of Microprocessor Based Control Panel, Online Monitoring, Wireless Connectivity with SCADA LED Display installed at Badarpur and Sarai Kale Khan Pump House.)
2026_PWD_291803_1
31/EE(E)/EMD South East/PWD/2026-27
Open Tender
Miscellaneous Services
Works
730 days
At Site
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹22,960
30 May 2026
22 May 2026
29 May 2026
22 May 2026
29 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance & Operation of DG Sets, Storm Water Pumps, Substation & Electrical Installation, LT Panel Board at storm water pump houses under PWD, EMD South East and and Sub Division R-23,24&25 under South East Road-2, New Delhi. (SH:- Repairing / Comprehensive Maintenance of Microprocessor Based Control Panel, Online Monitoring , Wireless Connectivity with SCADA LED Display installed at Badarpur & Sarai Kale Khan Pump House). | |||||
| 1.01 | For Sarai Kale Khan | - | - | - | - |
| 1.02 | For 1st Year | 12 | Months | 5,645 | ₹67,740 |
| 1.03 | For 2nd Year | 12 | Months | 6,040 | ₹72,480 |
| 1.04 | For Old Badarpur Pump House | - | - | - | - |
| 1.05 | For 1st Year | 12 | Months | 5,645 | ₹67,740 |
| 1.06 | For 2nd Year | 12 | Months | 6,040 | ₹72,480 |
| 2 | Providing servicing for Visit the site once in a week of each pump house i/c checking the whole automation system (i.e. Server the system, control panel, sensors, desktop computer, microprocessor) and submit the detailed visit report of system in the office and as per direction Engineer-in- Charge. a) Sarai Kale Khan b) Badarpur Pump House | 24 | Months | 16,284 | ₹3,90,816 |
| 3 | Supplying installation testing & commissioning of Ultrasonic Sensor/Level Sensor status of water tank output analog approx. liquid Quantity in tank, made of ABS housing, detection range as per requirement at site, output analog approx, liquid quantity in Tank, etc. complete as required. | 8 | Nos. | 24,757 | ₹1,98,056 |
| 4 | Supplying,installation,testing & commissioning of microprocessor, suitable with control & wireless connectivity device transmitter and receiver (To be installed nearby sensor for wireless data Range upto 1000 meters i/c sending data from upward to downward) for sending status of water tank to Master Microprocessor unit of on real time basis for sending/receiving data. Made of ABS Housing. Control :- Relay Based output suitable control panel operated etc. complete as required. | 8 | Nos. | 27,843 | ₹2,22,744 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_387299.xls
BOQ • 0.30 MB
tender.pdf
Tender Documents • 2.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .