Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹20.5 Laccepted-aoc | ₹20.5 L | accepted-aoc |
Tender Value
₹20.6 L
EMD Value
₹20,560
Closing Date
24 Mar 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, RWS DIVISION, NELLORE
NELLORE
Operation and Maintenance of CPWS Scheme to Uchapalli and 6 Other habitations in Podalakur mandal of SPSR Nellore District for the year of 2026-27, Est Cost Rs. 24.60 lakhs
916599
279/2025-26, Dated: 12.03.2026 of the Executive Engineer, RWS&S Division, Nellore
OPEN - NCB
Water Supply
SRI POTTI SRI RAMULU NELLORE
8 documents required · 8 mandatory
₹728
₹20,560
8 Apr 2026
18 Mar 2026
18 Mar 2026
Operation and Maintenance of CPWS Scheme to Uchapalli and 6 Other habitations in Podalakur mandal of SPSR Nellore District for the year of 2026-27 for Supply of potable (chlorinated) drinking water at the specified quantity as per drinking water quality standards to all the habitations mentioned in the schedule through the existing network system comprising of infrastructure viz. RSF, OHBR, Service Reservoirs i.e. OHSRs, GLSRs etc., including all operating expenses like wages to the system staff and other amenities applicable as per the labour act, Mobility/transportation facilities etc., for the designated qualified Pump operators, Electricians, Fitters, Helpers, Watchmen etc. for carrying out of all operations involved in drawing of raw water from source, treatment and supply of drinking water as per the guidelines of CPHEEO manual/Department at the rate of 40LPCD with relevant IS specifications wherever applicable and with highest quality standards. The scope of work also includes routine, periodic, breakdown and preventive maintenance, staffing and engaging manpower under Operation & Maintenance. The turbidity of supplied water shall be maintained below 1 NTU and should not exceed 5NTU by mixing alum in raw water duly arriving the Alum dosage by jar test. Disinfection with Bleaching Powder/Liquid Chlorine/Gas Chlorination shall be taken up to maintain Residual Chlorine not less than 0.2ppm in pipe lines at last FHTC in the tail end habitations. The scope of work includes taking up of all other incidental activities pertaining to the Operation and Maintenance of CPWS Scheme and to follow all standard procedures by the agency as directed by the Employer/Engineer of the department. The Rate per KL is applicable to supply potable (chlorinated) drinking water by engaging system staff for Operation & Maintenance of said CPWS Scheme (The rate is excluding cost of consumables, power consumption charges, Repairs and Renewals and GST) for the Period from 01.04.2026 to 31.03.2027 (365Days). (Annexure is enclosed for the System staff & Habitations list)
Supply, delivery and staking of Chlorine Gas as per I.S 646-1986 in cylinders including cost of material, conveyance of material, stacking at the location specified by the Department and all taxes, duties and levies etc.complete.
Repairs and Renewals :
Manufacture, Supply, & Delivery of 90mm dia HDPE Pipes 6Kg/cm2 conforming to IS 4984 - 2016 including transportation to anywhere in A.P, excluding all taxes (Supply up to 90 mm dia. in coil & above 90mm dia. straight length
Manufacture, Supply, & Delivery of 140mm dia HDPE Pipes 6Kg/cm2 conforming to IS 4984 - 2016 including transportation to anywhere in A.P, excluding all taxes (Supply up to 90 mm dia. in coil & above 90mm dia. straight length
Manufacture, Supply and Delivery of 5star rated 3phase 15HP Submersible motor pumpset, confirming to IS 8034 and motor confirming to IS 9283 with water proof winding with suitable for various delivary head of 16-24 stages of approved make inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes.of Texmo/CRI Company
Labour Charges for leakage in HDPE Pipe line of 90mm dia 6Kg/cm2 diameter of different places including necessary excavation manually or by machinery, dewatering removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&l
Labour Charges for leakage in HDPE Pipe line of 140mm dia 6Kg/cm2 diameter of different places including necessary excavation manually or by machinery, dewatering removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&l
Removal of 15HP - 3Phase Submersible Motor Pumpset with all accessories from source
Conveyance chrages for 15HP - 3Phase Submersible Motor Pumpset with all accessories from workspot to Workshop and Workshop to WorkSpot
Rewinding charges of 15HP - 3Phase Submersible Motor Pumpset with all accessories
Pump service Charges of 15HP - 3Phase Submersible Motor Pumpset with all accessories
Cost and supply of 50mm dia GI B-Class Pipe
Cost and supply of PVC insulated and PVC sheathed, flexible 3 core flat type cable 4.00 Sqmm for submersible pumpsets,conductors composed of annealed high conductivity copper wire, confirming to IS 694 & its revisions and amendments from time to time delivery at site of installation of pumpset
Fabrication ,transportationand and supply of wall mounted Single phase Control panel board of size 600x600x250mm made of 18 SWG CRCA sheet steel enclosure, 14 SWG mounting plate for cable entry fabricated , painted with two coats of Red oxide primer and two coats of Grey paint, lock and key arrangements two side lovures with weld mesh inside etc., complete consisting of the following equipment with all internal wiring using L&T / Finolex copper FRLS cables of suitable size and capacity and cable clamp etc complete for 3 phase motor pump sets - .ELEC-5.4.17 (b) Voltmeter ; 0-500 V 96x96mm size. Makes: L&T / C&S /SALZAR / HPL/ AEI / Meco / Rishab - 1No 0 to 20 Amps / 0 50 Amps Ammeter (96x96mm size). Makes: L&T / C&S / SALZAR / HPL/ AEI / Meco / Rishab- 1 No Single phase preventor of suitable range Makes: L&T / Minilec / Powertec. - 1No. 32 A TP, 10KA MCB. Makes: Legrand / Schneider / - 1No Indication lamps (R-Y-B) with switch control - 1set Voltmeter & Ammeter selector switch - 2 Nos Supply and fixing of ISI Mark suitable capacitor Makes:L&T / Siemens / Schneider / Epcos/Havells
Erection charges of 15HP - 3Phase Submersible Motor Pumpset with all accessories
Removal of 5HP - 3Phase Mono Block Pumpset with all accessories at Head Work Pumphouse
Conveyance chrages for 5HP - 3Phase Mono Block Pumpset with all accessories from workspot to Workshop and Workshop to WorkSpot
Rewinding charges of 5HP - 3Phase Mono Block Pumpset with Cu Wire of suitable guage etc.,
Erection charges of 5HP - 3Phase Mono Block Pumpset with all accessories
Labour charges for cleaning of Sumps/OHBR including cleaning and removal of algae, calcinations, sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) Shall not exceed 4 times for Every 15Days
Providing 90 mm dia, 6Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation of 0.70 x 1.00 mts . Earth work exvacation in all soils upto SDR using 2/3rd machinery and 1/3rd manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B-Volume-I) and as per drawing (Part C-Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work
(21 - Twenty One Items) -------- Total : Rs.
Operation and Maintenance of CPWS Scheme to Uchapalli and 6 Other habitations in Podalakur mandal of SPSR Nellore District for the year of 2026-27 for Supply of potable (chlorinated) drinking water at the specified quantity as per drinking water quality standards to all the habitations mentioned in the schedule through the existing network system comprising of infrastructure viz. RSF, OHBR, Service Reservoirs i.e. OHSRs, GLSRs etc., including all operating expenses like wages to the system staff and other amenities applicable as per the labour act, Mobility/transportation facilities etc., for the designated qualified Pump operators, Electricians, Fitters, Helpers, Watchmen etc. for carrying out of all operations involved in drawing of raw water from source, treatment and supply of drinking water as per the guidelines of CPHEEO manual/Department at the rate of 40LPCD with relevant IS specifications wherever applicable and with highest quality standards. The scope of work also includes routine, periodic, breakdown and preventive maintenance, staffing and engaging manpower under Operation & Maintenance. The turbidity of supplied water shall be maintained below 1 NTU and should not exceed 5NTU by mixing alum in raw water duly arriving the Alum dosage by jar test. Disinfection with Bleaching Powder/Liquid Chlorine/Gas Chlorination shall be taken up to maintain Residual Chlorine not less than 0.2ppm in pipe lines at last FHTC in the tail end habitations. The scope of work includes taking up of all other incidental activities pertaining to the Operation and Maintenance of CPWS Scheme and to follow all standard procedures by the agency as directed by the Employer/Engineer of the department. The Rate per KL is applicable to supply potable (chlorinated) drinking water by engaging system staff for Operation & Maintenance of said CPWS Scheme (The rate is excluding cost of consumables, power consumption charges, Repairs and Renewals and GST) for the Period from 01.04.2026 to 31.03.2027 (365Days). (Annexure is enclosed for the System staff & Habitations list)
Supply, delivery and staking of Chlorine Gas as per I.S 646-1986 in cylinders including cost of material, conveyance of material, stacking at the location specified by the Department and all taxes, duties and levies etc.complete.
Manufacture, Supply, & Delivery of 90mm dia HDPE Pipes 6Kg/cm2 conforming to IS 4984 - 2016 including transportation to anywhere in A.P, excluding all taxes (Supply up to 90 mm dia. in coil & above 90mm dia. straight length
Manufacture, Supply, & Delivery of 140mm dia HDPE Pipes 6Kg/cm2 conforming to IS 4984 - 2016 including transportation to anywhere in A.P, excluding all taxes (Supply up to 90 mm dia. in coil & above 90mm dia. straight length
Manufacture, Supply and Delivery of 5star rated 3phase 15HP Submersible motor pumpset, confirming to IS 8034 and motor confirming to IS 9283 with water proof winding with suitable for various delivary head of 16-24 stages of approved make inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes.of Texmo/CRI Company
Labour Charges for leakage in HDPE Pipe line of 90mm dia 6Kg/cm2 diameter of different places including necessary excavation manually or by machinery, dewatering removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&l
Labour Charges for leakage in HDPE Pipe line of 140mm dia 6Kg/cm2 diameter of different places including necessary excavation manually or by machinery, dewatering removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&l
Removal of 15HP - 3Phase Submersible Motor Pumpset with all accessories from source
Conveyance chrages for 15HP - 3Phase Submersible Motor Pumpset with all accessories from workspot to Workshop and Workshop to WorkSpot
Rewinding charges of 15HP - 3Phase Submersible Motor Pumpset with all accessories
Pump service Charges of 15HP - 3Phase Submersible Motor Pumpset with all accessories
Cost and supply of 50mm dia GI B-Class Pipe
Cost and supply of PVC insulated and PVC sheathed, flexible 3 core flat type cable 4.00 Sqmm for submersible pumpsets,conductors composed of annealed high conductivity copper wire, confirming to IS 694 & its revisions and amendments from time to time delivery at site of installation of pumpset
Fabrication ,transportationand and supply of wall mounted Single phase Control panel board of size 600x600x250mm made of 18 SWG CRCA sheet steel enclosure, 14 SWG mounting plate for cable entry fabricated , painted with two coats of Red oxide primer and two coats of Grey paint, lock and key arrangements two side lovures with weld mesh inside etc., complete consisting of the following equipment with all internal wiring using L&T / Finolex copper FRLS cables of suitable size and capacity and cable clamp etc complete for 3 phase motor pump sets - .ELEC-5.4.17 (b) Voltmeter ; 0-500 V 96x96mm size. Makes: L&T / C&S /SALZAR / HPL/ AEI / Meco / Rishab - 1No 0 to 20 Amps / 0 50 Amps Ammeter (96x96mm size). Makes: L&T / C&S / SALZAR / HPL/ AEI / Meco / Rishab- 1 No Single phase preventor of suitable range Makes: L&T / Minilec / Powertec. - 1No. 32 A TP, 10KA MCB. Makes: Legrand / Schneider / - 1No Indication lamps (R-Y-B) with switch control - 1set Voltmeter & Ammeter selector switch - 2 Nos Supply and fixing of ISI Mark suitable capacitor Makes:L&T / Siemens / Schneider / Epcos/Havells
Erection charges of 15HP - 3Phase Submersible Motor Pumpset with all accessories
Removal of 5HP - 3Phase Mono Block Pumpset with all accessories at Head Work Pumphouse
Conveyance chrages for 5HP - 3Phase Mono Block Pumpset with all accessories from workspot to Workshop and Workshop to WorkSpot
Rewinding charges of 5HP - 3Phase Mono Block Pumpset with Cu Wire of suitable guage etc.,
Erection charges of 5HP - 3Phase Mono Block Pumpset with all accessories
Labour charges for cleaning of Sumps/OHBR including cleaning and removal of algae, calcinations, sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) Shall not exceed 4 times for Every 15Days
Providing 90 mm dia, 6Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation of 0.70 x 1.00 mts . Earth work exvacation in all soils upto SDR using 2/3rd machinery and 1/3rd manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B-Volume-I) and as per drawing (Part C-Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender doc (less than 50) - 2026-27.doc
TENDER_DOCUMENT • 0.18 MB
Uchapalli 24.60.xls
TENDER_DOCUMENT • 0.07 MB
Uchapalli+BOQ.xls
TENDER_DOCUMENT • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .