| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹16.3 Laccepted-aoc | ₹16.3 L | accepted-aoc |
Tender Value
₹16.9 L
EMD Value
₹17,000
Closing Date
25 May 2026, 3:00 pmClosed
Executive Engineer-XI,Tirupati
TIRUPATI
Erection and removal of pendals for all festivals in Tallapaka Temples and 108' Annamaiah statue and SV Temple, Kadapa District for the year 2026-27
935775
13/EE-XI/TTD/2026-27
OPEN - NCB
Annual maintenance works
ANNAMAYYA
8 documents required · 7 mandatory · 1 optional
₹598
₹17,000
9 Jun 2026
19 May 2026
19 May 2026
Hire charges for 3dayas erection and removal of flat/sloped roof M.S pipes pendals using 40mm MS pipes for verticals . horizontals and roof supports etc., fixing with, special type gripper MS clamps ( Nandu clamps) , extra horizontal bracings should be provided from at 2.40 m to roof level and jointing with special type gripper MS clamps ( Nandu clamps)for horizontal bracings and column roofing including earth work excavation in all soils (Except rock requiring blasting) to a depth of 0.40m to 0.60m. The vertical posts are to be fixed strongly with out any shaking. The roof shall be covered with G.I sheet/Aluminium sheet/Galvalume sheet and firmly fixed to the purlins etc., complete as directed during execution .The rate including conveyance and hire charges of all materials such as MS pips, Clamps, G.I sheet/Aluminium sheet/Galvalume sheet etc. and labour charges for fixing and removal etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
-do- for 10 days
-do- for 120 Days
Hire charges for providing white ceiling cloth for decorating the pendals and mandapams with necessarys frame work with decorative frrills [ jallars ] around and border decorative frills [ jallars ] at the centre of red or green colour or another attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and frefarably new or neatly washed and should be in good condition through out the festival or Ustavam period and should be removed after the same is over and should be repaired or replaced as and turnout by monkeys or by any other means and should be replaced without any extra rate if the cloth is spoiled due to rain. The contractor should allow the electric and flowers decoration over the cloth done departmentally without any claim.
-do-For 10 days
Hire charges for 3 days erection and removal of barricading with MS pipes at required places with MS pipes of 40mm diameter using 2.45 m long verticals and 3 to 6 metres horizontals.The barrication provided such that it shall be 2m above ground level and 0.45 m pipe embedded in the ground with necessary earth work excavation in all soils up to 0.45m to 0.60 m depth (except rock requiring chiselling). The Horizontals shall be in 3 rows one at 0.50 metres from bottom and balance two rows at 0.70 metres intervals leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals.The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading unloading erection, removal etc., including conveyance charges to site (both ways ) and removing the same after completion of the festival and taking away the material etc., duly refilling the pits and levelling the surface etc., complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to avoid exposure of sharp edges.The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days
Hire charges for 1 day of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., as directed during execution. The rate quoted is including conveyance of all materials. The rate quoted is including Transportation. The rate is for below mentioned calendar days.* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for supply, erection and removal of digital design flex boards with frame work made with 25mm x 25mm M.S. square pipe (light weight) with required back support to erect boards at specified places as directed by the department. The cost is inclusive of materials, labour for printing, erection and removal of square pipe (light weight) after completion of function.
Hire charges for esupply and erection of digital design design flex banners with required material like threads and sticks etc., to erect specified places as directed by the department. The cost is including materials labour for printing, erection and removal after completion of function complete as directed during execution.
Hire charges for 1 day of erection and removal of side curtains with white / colour design cloth and required frame work including using necessary bolts, nuts, etc., complete. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete .The rate is for below mentioned calendar days.* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing spreading and removing of PVC chairs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accedents,repairs and replacement etc., complete during the said period. Rate is including Transportation etc., complete.
Hire charges for 45 days of providing & fixing of good quality GI sheets ( 22 to 26 gauge) ( plain or corrugated ) sheets to the available frame work for roof or sides for function/festival pendals.The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing Rain proof shelters of different spans with clear height of 16' at the ends and suitable height at centre with central unsupported span of ranging 60' to 80'. The shelter shall be provided with adequate MS girders, MS trusses, MS purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc., The entire roof shall be covered suitably with GI sheet/Aluminium sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drained. (This rate is applicable when structure is provided using roof trusses.) Necessary rain water collection facility and drainage arrangement shall be made. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
-do- For 3 days
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc.,including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution.
Note : The following conditions are applicable for all the above sl.no.1 to 16 items. Erection should be completed before two days of Festival/ Utsavam as directed during execution for Pendals, Barrication and Dias.
Suitable tying arrangements shall be made such that the pendals/shelters laid shall withstand heavy wind & rain.
Proper slopes shall be maintained for smooth drainage of rain water.
The shelter provided shall be capable to support necessary illumination, PA system, decoration work, display TVs etc.,
The agency shall allow the electrical / flower decoration/ PA system etc., over the shelter/barrication/ ceiling cloth etc., without any extra cost.
Adequate watch and ward shall be provided by the agency at his cost and dept. will not be responsible for any loss due to thefts/accidents etc.,
The rain proof shelters provided shall be leak proof.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 13 26 27 CONDITIONS.doc
TENDER_DOCUMENT • 0.60 MB
NIT 13 26 27 SCHEDULE.xls
TENDER_DOCUMENT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].