Executive Engineer, Anand Irrigation Division Anand.
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300 Feet on Petlad Branch Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
331374
06 of 2026-2027
Open
Miscellaneous Works
Works
Anand
13 documents required · 12 mandatory · 1 optional
₹2,400
Executive Engineer Anand Irrigation Division Anand
₹89,000
6 Aug 2026
6 Aug 2026
6 Aug 2026
5 Sept 2026
6 Aug 2026
No. figures(Rs.)
Excavation for foundation in all sorts of soil including
yellow sandy gravelly soils ,soft & hard murrum etc.
in dry condition including depositing the excavated
stuff in uniform layers in banks or as and where
directed etc. complete for lead up to 500m and all lift.
(BY MACHINERY) Including dewatering.
Providing rubble and sand layer including supplying of
rubble & coarse clean sharp sand at site including
spreading rubble & coarse sand materials in 25 cm
2 layer including filling in the gaps in rubble, and 57.00 Cum 1155.90
levelling etc.complete as directed (80% rubble & 20%
coarse sand) including consolidation, watering etc.
Providing & Laying in position"NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by
mass and machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding,
3 compaction by vibrator, curing as directed with all lead 121.00 Cum 3346.00
& lift etc complete Without Dewatering and excluding
cost of steel reinforcement. For Foundation
concrete/General purpose. C. C.Nominal Mix, M-10
and MSA-40 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost
of steel reinforcement. For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc. Concrete
grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost
of steel reinforcement. For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.Concrete
grade M-25 and MSA-20 mm
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300 Feet on Petlad Branch
Work : Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost
of steel reinforcement. (B) For Pier and
Abutments / Wing wall / Head wall / Return wall /
Dowel Wall etc. Concrete grade M-15 and MSA-20
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
4(d) vibrator, curing as directed with all lead & lift etc 213.00 Cum 5642.00
complete without dewatering and excluding the cost
of steel reinforcement. (E) For Column / Beam /
Solid Slab of Road Bridge / Barrel / Cutoff wall
etc.Concrete grade M-25 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost
of steel reinforcement. For Kerb / Wearing
coat.Concrete grade M-25 and MSA -10 to 20mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
4(f) vibrator, curing as directed with all lead & lift etc 6.00 Cum 8023.00
complete without dewatering and excluding the cost
of steel reinforcement. For Parapet wall of Road
Bridge / Structure. Concrete grade M-25 and MSA
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where
necessary, hooking etc. complete as per drawing for all
lead and lifts.TMT
Providing and fixing in position pre-moulded asphalt
or bitumen cork board of approved quality and
specifications as per design and drawing.20 mm
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300 Feet on Petlad Branch
Work : Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing and fixing in position P.V.C. heavy duty
water stops in barrels, troughs and wing walls with
mm wide expansion joint as shown in drawing
7 including filling the joints with asphalt pad or 57.00 Meter 587.70
bitumen cork board of approved quality.
(Asphalt pad or bitumen cork board will be paid separ
ately) 225 mm WIDE P.V.C. WATER STOP
Providing and filling the polysulphide joint sealent of
the approved make in the expansion and contraction
8 57.00 Meter 181.20
joints in the c.c. lining including clearing the joints
with air water jet.
Providing and fixing 110 mm diameter P.V.C..Pipe (6
9 kgf / sqcm) Water spout with necessary iron gratting 11.00 Meter 369.20
as per design
Back filling the foundation trenches around the
watering, ramming, compacting etc. complete. (By
Machinery)
Providing and fixing in position 1.80 m high above
finished ground level canal data boards of standard
size 1.20m x 0.90m with M.S. angle 40mm x 40mm x
11 6mm with 3mm thick iron plate in 1:5:10 proportion 2.00 No 3103.00
concrete block size 40cm x 40cm x 75cm including
painting existing data on the board etc. complete as
Wall Painting (two Coats) with plastic emulsion paint
of approved brand & manufacture on undecorated wall
12 surface to give an even shade including throughly 121.00 Sqmt 82.85
brushing the surface free from mortar dropping &
other foreign matter & sand papered smooth .
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300 Feet on Petlad Branch
Work : Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Type-A,"W": Metal Beam Crash barrier (Providing &
erecting a "w" metal beam crash barrier comprising of
3 mm thick corrugated sheet metal beam rail,70 cm
above Road/ground level,fixed on ISMC series channel
vertical post, 150x75x5 mm spaced 2.0 mtr. Center to
13 center,1.80 mtr high,1.1 mtr below road/ground level, 20.00 Meter 3321.00
all steel parts and fitments to be galvanized by hot
deep process,all fittings will be confirm to IS:1367 &
IS:1364, metal beam rail to be fixed on the vertical
post with a spacer of channel section 150x75x5 mm,
330 mm long complete as per clause 811)
Carrying out "Structure Footing load Test" as per GERI
-Vadodara's SOR for the Year 2025-26
Dismantling the R.C.C. work and disposing off the
stuff including stacking of the useful materials etc.
complete as directed. Heavy Reinforcement (Main
bar above 16 mm. dia.)
Dismantling the R.C.C. work and disposing off the
stuff including stacking of the useful materials etc.
complete as directed. Light Reinforcement ( Main bar
upto 16 mm. dia.)
Dismantling the existing foundation concrete including
sorting out the dismantalled stuff and stacking the
16 useful material, removing the debries and making good 12.00 Cum 1155.20
the damages etc. complete as and where directed.
Cement Concrete
Dismantling the existing brick masonry including
sorting out and stacking the useful material and
removing the debries and making good the damages
etc. complete as directed. In Cement Mortar
Providing temporary all weather and fair weather
diversion suitable for traffic during the construction
18 period of the structure including providing necessary 1.00 387900.00
drain diversion and all safty measures including red
lamps/ signals at night for traffic etc. comp.
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300 Feet on Petlad Branch
Work : Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing dron videography on the ocassion of function
19 or for before/on going/ after completion of 1.00 4000.00
construction work as directed by Engineer in charge
Rs. Eighty Eight Lac Ten Thousand Seven Hundred Eighty Five & Thirty Five Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Put to tender Estimated amount Put to tender
Deduct …………………….% Below Add ……………. % above
In Words In Words
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC 10/2017 Cement Consumption /16/CDate:11/05/2017 as stated in S.O.R. therefore in R.C.C.
4 items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate i.e. 5483.37/MT of input rate mentioned in
all the tender.
A.E. Divisional Accountant
Anand Irrigation Division Anand Irrigation Division
Anand Anand
Deputy Executive Engineer
Ode Irrigation Sub Division Executive Engineer
Anand Irrigation Division
Cement Requirement Statement
Name of Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300 Feet on Petlad
Work :- Branch Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
consumpt Total cement
Description of Item Qty. Unit ion in requirement
bags per (in bags)
Providing & Laying in position"NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
1 3 scaffolding, compaction by vibrator, curing as 121.00 Cum 4.40
directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel
reinforcement. For Foundation concrete/General
purpose. C. C.Nominal Mix, M-10 and MSA-40 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
2 4(a) directed with all lead & lift etc complete without 232.00 Cum 6.00
dewatering and excluding the cost of steel
reinforcement. For Footing of column / Abutment /
Pier / Bottom slab of barrel / Plinth course /
Coping / Approach Slab etc. Concrete grade M-15
and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
3 4(b) directed with all lead & lift etc complete without 138.00 Cum 7.60
dewatering and excluding the cost of steel
reinforcement. For Footing of column / Abutment /
Pier / Bottom slab of barrel / Plinth course /
Coping / Approach Slab etc.Concrete grade M-25
and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. (B) For Pier and Abutments / Wing
wall / Head wall / Return wall / Dowel Wall etc.
Concrete grade M-15 and MSA-20 mm
Cement Requirement Statement
Name of Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300 Feet on Petlad
Work :- Branch Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
consumpt Total cement
Description of Item Qty. Unit ion in requirement
bags per (in bags)
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. (E) For Column / Beam / Solid
Slab of Road Bridge / Barrel / Cutoff wall
etc.Concrete grade M-25 and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
6 4(e) scaffolding, compaction by vibrator, curing as 26.00 Cum 7.60
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. For Kerb / Wearing coat.Concrete
grade M-25 and MSA -10 to 20mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. For Parapet wall of Road Bridge /
Structure. Concrete grade M-25 and MSA -10 to
Total (Bags)
Say (Bags)
Total (MT)
Deputy Exectutive Engineer Exectutive Engineer
Ode Irrigation Sub Division Anand Irrigation Division
Umreth Anand
Steel Requirement Statement
Name of Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.35300
Work :- Feet on Petlad Branch Canal x Main Canal ( MRBC ) (Chikodra to Devpura)
Description of Item Qty. Unit
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where
necessary, hooking etc. complete as per drawing for
all lead and lifts.TMT
Deputy Exectutive Engineer
Exectutive Engineer
Ode Irrigation Sub Division
Anand Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender notice 6 0f 2026 27.pdf
1 Front Page.35300ft.pdf
2.1 Certificate p1.pdf
2.2 Certificate p1.pdf
3 Notice Inviting online Tender 35300ft.pdf
4-SBD Book-35300.pdf
5 General and tem wise specification 35300ft.pdf
Drawing Ch.35300.pdf
Standard Techanical Specification of MIC 35300 ft.pdf
BOQ-35300 ft.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].