| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹80.6 L+₹9.1 L (12.7%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹86.9 L+₹15.4 L (21.5%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹92.5 L+₹21.0 L (29.3%)Admitted-Finance NALCO TOWNSHIP KULAD NALCONAGAR ANGUL KULAD IN FRONT OF SMELTER PLANT NALCONAGAR ANGUL ANGUL ODISHA 759145 | ANUGUL | ODISHA | 759145 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical NA ROHIT TYAGI BEGUM BRIDGE MEERUT BEGUM BRIDGE BEGUM BRIDGE MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | M/s. POWER ENTERPRISERS L2 | M/S NATIONAL BUILDERS L4 | M/s. BINAYAK CONSTRUCTION L3 | M/s Dinesh Enterprisers L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation: Earth work in excavation below ground level for all kinds of works in foundations including trenches, pavements, manholes, wall footings, pipe lines, cable trenches, pits etc. in all types of soil as classified in specification for a depth upto 1.5m including all labours, materials, dressing of sides, leveling, grading, and ramming of bottoms, pumping and bailing out of rain water, sub-soil water, disposal and stacking of surplus excavated materials within a lead of 1Km as directed by Manager-in-charge, providing temporary supports to existing service lines like water pipes, sewerage, electrical cables etc. including shoring and strutting as per direction of Manager-in-charge. | 5,046 | CUM | 142 ₹7,16,532 Lowest | 150 ₹7,56,900 | 155 ₹7,82,130 | 145 ₹7,31,670 |
| 2.00 | Filling with available excavated earth: Filling with available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 30 cm in deep consolidating earth deposited in layers by ramming and watering lead upto 100 mtrs. as per direction of Manager-in-charge | 3,532 | CUM | 89 ₹3,14,348 | 70 ₹2,47,240 Lowest | 120 ₹4,23,840 | 95 ₹3,35,540 |
| 3.00 | Supplying and filling the sand in plinth:Supplying and filling the sand in plinth under floors and over areas including watering, ramming, consolidating and dressing complete as per direction of
Manager-in-charge | 216 | CUM | 800 ₹1,72,800 | 950 ₹2,05,200 | 995 ₹2,14,920 | 630 ₹1,36,080 Lowest |
| 4.00 | P/L P.C.C. (1:4:8) Providing & laying of plain cement concrete 1:4:8 (1cement: 4 coarse sand: 8 graded stone aggregate 40mm & down grade)in foundation & plinth upto a depth of 5M from G.L. excluding the cost of cement & shuttering , as per the instruction of MIC | 163 | CUM | 2,997 ₹4,88,511 | 3,000 ₹4,89,000 | 2,700 ₹4,40,100 | 2,450 ₹3,99,350 Lowest |
| 5.00 | P/L R.C.C. (1:1.5:3) up to plinth level:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing andreinforcement - All work up to plinth level as per the direction of Manager-in-charge excluding cost of cement, centering & steel, CC 1:1.5:3 (1cement: 1.5 coarse sand:
3 graded stone aggregate 12mm nominal size/ 20mm & down grade). | 766 | CUM | 3,097 ₹23,72,302 | 3,500 ₹26,81,000 | 2,930 ₹22,44,380 | 2,580 ₹19,76,280 Lowest |
| 6.00 | P/L R.C.C. (1:1.5:3) above plinth level:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up tofloor five level as per the direction of Manager-in-charge excluding cost of centering, shuttering, finishing and reinforcement. CC 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate 12mm nominal size/ 20mm & down grade). | 422 | CUM | 3,400 ₹14,34,800 | 3,800 ₹16,03,600 | 3,050 ₹12,87,100 | 2,600 ₹10,97,200 Lowest |
| 7.00 | P/F Centering and shuttering-Foundations: Providing and fixing centering and shuttering with shuttering ply wood/steel plate including curved, hexagonal, octagonal and such other shaped shuttering for foundation, footing mass concrete, machine and equipment foundations columns, pillars, posts, struts and pedestals, lintels, beams,girders, cantilever and brackets, suspended floors, roofs staircase waists, landing steps, shelves and their supports, balances, chajjas, underground tunnels, ducts, trench foundations, etc, and any other similar items as directed including strutting, racking, propping etc. keeping the same after specified period etc. complete for all depth and heights as per direction of Manager-in-charge.
(a) Foundations, footings, bases of columns, etc. for mass concrete. | 882 | SQM | 190 ₹1,67,580 Lowest | 250 ₹2,20,500 | 250 ₹2,20,500 | 200 ₹1,76,400 |
| 8.00 | P/F Centering and shuttering-Lintels: Providing and fixing centering and shuttering with shuttering ply wood/steel plate including curved, hexagonal, octagonal and such other shaped shuttering for foundation, footing mass concrete, machine and equipment foundations columns, pillars, posts, struts and pedestals, lintels, beams, girders, cantilever and brackets, suspended floors, roofs staircase waists, landing steps, shelves and their supports, balances, chajjas, underground
tunnels, ducts, trench foundations, etc, and any other similar items as directed including strutting, racking, propping etc. keeping the same after specified period etc. complete for all depth and heights as per direction of Manager-in-charge.
(b) Lintels, beams, plinth beams, girders, bressumers and
cantilevers | 550 | SQM | 290 ₹1,59,500 | 300 ₹1,65,000 | 380 ₹2,09,000 | 220 ₹1,21,000 Lowest |
| 9.00 | P/F Centering and shuttering-Columns: Providing and fixing centering and shuttering with shuttering ply wood/steel plate including curved, hexagonal, octagonal and such other shaped shuttering for foundation, footing mass concrete, machine and equipment foundations columns, pillars, posts, struts and pedestals, lintels, beams, girders, cantilever and brackets, suspended floors, roofs staircase waists, landing steps, shelves and their supports, balances, chajjas, underground tunnels, ducts, trench foundations, etc, and any other similar items as directed including strutting, racking, propping etc. keeping the same after specified period etc. complete for all depth and heights as per direction of Manager-in-charge.
(c) Columns, Pillars, Piers, Abutments, Posts and Struts. | 2,475 | SQM | 290 ₹7,17,750 | 380 ₹9,40,500 | 390 ₹9,65,250 | 230 ₹5,69,250 Lowest |
| 10.00 | Tor steel/TMT bars reinforcements: Tor steel/TMT bars reinforcements for RCC work including transportation from store, cutting, bending, binding with wire, placing in position and providing cover blocks etc. complete as per instruction of MIC. | 119 | MT | 8,500 ₹10,11,500 Lowest | 10,000 ₹11,90,000 | 9,100 ₹10,82,900 | 8,500 ₹10,11,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
4 Jul 2022, 3:00 pmClosed
Ms Subhashree Swain
Dy. Manager (Elect.) T n C, CPP, NALCO, ANGUL
CONSTRUCTION OF R.C.C. PEDESTAL FOR ASH HEADER PIPE LINE FROM ASH SILO TO 90 DEGREE BEND INSIDE CPP
2022_NALCO_690633_1
MC-5139
Open Tender
Miscellaneous Services
Item Rate
450 days
CPP, NALCO, ANGUL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
NATIONAL ALUMINIUM COMPANY LIMITED
₹1.3 L
Yes
7 Nov 2022
24 May 2022
7 Jul 2022
25 May 2022
4 Jul 2022
25 May 2022
Amount
Earth work in excavation: Earth work in excavation below ground level for all kinds of works in foundations including trenches, pavements, manholes, wall footings, pipe lines, cable trenches, pits etc. in all types of soil as classified in specification for a depth upto 1.5m including all labours, materials, dressing of sides, leveling, grading, and ramming of bottoms, pumping and bailing out of rain water, sub-soil water, disposal and stacking of surplus excavated materials within a lead of 1Km as directed by Manager-in-charge, providing temporary supports to existing service lines like water pipes, sewerage, electrical cables etc. including shoring and strutting as per direction of Manager-in-charge.
Filling with available excavated earth: Filling with available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 30 cm in deep consolidating earth deposited in layers by ramming and watering lead upto 100 mtrs. as per direction of Manager-in-charge
Supplying and filling the sand in plinth:Supplying and filling the sand in plinth under floors and over areas including watering, ramming, consolidating and dressing complete as per direction of Manager-in-charge
P/L P.C.C. (1:4:8) Providing & laying of plain cement concrete 1:4:8 (1cement: 4 coarse sand: 8 graded stone aggregate 40mm & down grade)in foundation & plinth upto a depth of 5M from G.L. excluding the cost of cement & shuttering , as per the instruction of MIC
P/L R.C.C. (1:1.5:3) up to plinth level:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing andreinforcement - All work up to plinth level as per the direction of Manager-in-charge excluding cost of cement, centering & steel, CC 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate 12mm nominal size/ 20mm & down grade).
P/L R.C.C. (1:1.5:3) above plinth level:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up tofloor five level as per the direction of Manager-in-charge excluding cost of centering, shuttering, finishing and reinforcement. CC 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate 12mm nominal size/ 20mm & down grade).
P/F Centering and shuttering-Foundations: Providing and fixing centering and shuttering with shuttering ply wood/steel plate including curved, hexagonal, octagonal and such other shaped shuttering for foundation, footing mass concrete, machine and equipment foundations columns, pillars, posts, struts and pedestals, lintels, beams,girders, cantilever and brackets, suspended floors, roofs staircase waists, landing steps, shelves and their supports, balances, chajjas, underground tunnels, ducts, trench foundations, etc, and any other similar items as directed including strutting, racking, propping etc. keeping the same after specified period etc. complete for all depth and heights as per direction of Manager-in-charge. (a) Foundations, footings, bases of columns, etc. for mass concrete.
P/F Centering and shuttering-Lintels: Providing and fixing centering and shuttering with shuttering ply wood/steel plate including curved, hexagonal, octagonal and such other shaped shuttering for foundation, footing mass concrete, machine and equipment foundations columns, pillars, posts, struts and pedestals, lintels, beams, girders, cantilever and brackets, suspended floors, roofs staircase waists, landing steps, shelves and their supports, balances, chajjas, underground tunnels, ducts, trench foundations, etc, and any other similar items as directed including strutting, racking, propping etc. keeping the same after specified period etc. complete for all depth and heights as per direction of Manager-in-charge. (b) Lintels, beams, plinth beams, girders, bressumers and cantilevers
P/F Centering and shuttering-Columns: Providing and fixing centering and shuttering with shuttering ply wood/steel plate including curved, hexagonal, octagonal and such other shaped shuttering for foundation, footing mass concrete, machine and equipment foundations columns, pillars, posts, struts and pedestals, lintels, beams, girders, cantilever and brackets, suspended floors, roofs staircase waists, landing steps, shelves and their supports, balances, chajjas, underground tunnels, ducts, trench foundations, etc, and any other similar items as directed including strutting, racking, propping etc. keeping the same after specified period etc. complete for all depth and heights as per direction of Manager-in-charge. (c) Columns, Pillars, Piers, Abutments, Posts and Struts.
Tor steel/TMT bars reinforcements: Tor steel/TMT bars reinforcements for RCC work including transportation from store, cutting, bending, binding with wire, placing in position and providing cover blocks etc. complete as per instruction of MIC.
Dismantling and disposal of PCC:Dismantling and disposal of Plain cement concrete within 100M lead including stacking and cleaning the area all complete.
Dismantling and disposal of RCC: Dismantling and disposal of reinforced cement concrete within 100M lead including stacking and cleaning the area all complete as per direction of Manager-in-charge
S/A plastic emulsion paint APEX ULTIMA: Supplying and applying plastic emulsion paint APEX ULTIMA of Asian paint/weather coat all guard of berger/weather shieled max of ICI paints on RCC surface ( two or more coats on new work including priming coat of exterior wall primer of Asian paints or equivalent including washing, scraping, sand papering and smoothening of surface including repair to scratches, scaffolding etc complete for all height as per the specification and direction of MIC.
P/F of 20 mm dia. and 300 mm long bolts: Providing and fixing of 20 mm dia. and 300 mm long bolts including nuts and washers complete as per the specifications and direction of the Manager-in-charge.
M/s. POWER ENTERPRISERS
M/s. BINAYAK CONSTRUCTION
M/S NATIONAL BUILDERS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .