Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹5.2 L+₹5,040 (0.98%)Admitted-Finance | ₹5.2 L+₹5,040 (0.98%) | L2 | Admitted-Finance |
| 3 | L3₹5.3 L+₹9,936 (1.93%)Admitted-Finance | ₹5.3 L+₹9,936 (1.93%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAKESH KUMAR PURI CONTRACTOR L2 | Kusum Gupta L1 | VIVEK SOOD L3 |
|---|---|---|---|---|---|---|
| 1.00 | Hiring of poclain excavator cum loader for improvement of natural drainage system, improvement of geometric description of river Beas and maintaining constant shape of cross section by creating smooth channel. The machine should work at least 8 hours per day. Any loss of public property or any accident etc. The contractor is fully responsible during the execution of work. The fuel/POL charges and operational staff for the machine will be provided by the contractor. The repair and other incidental charges of machinery during the execution of work will be borne by the contractor. The useful martial shall be stacked as per direction of Engineer in charge. | 144 | Hours | 3,612 ₹5,20,128 | 3,577 ₹5,15,088 Lowest | 3,646 ₹5,25,024 |
Tender Value
₹5.0 L
EMD Value
₹10,034
Closing Date
4 May 2026, 11:00 amClosed
EE Jal Shakti Division Katrain
EE Jal Shakti Division Katrain
(SH- Non-Structural measure for improvement of natural drainage at House of Dr. Usha to Panchayat Ghar in front of construction side along river Beas)
2026_HPIPH_135024_1
EE Katrain 1852-1902 dated 23/04/2026
Open Tender
Civil Works
Item Rate
60 days
Katrain
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
Yes
₹10,034
11 Jun 2026
24 Apr 2026
4 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Hiring of poclain excavator cum loader for improvement of natural drainage system, improvement of geometric description of river Beas and maintaining constant shape of cross section by creating smooth channel. The machine should work at least 8 hours per day. Any loss of public property or any accident etc. The contractor is fully responsible during the execution of work. The fuel/POL charges and operational staff for the machine will be provided by the contractor. The repair and other incidental charges of machinery during the execution of work will be borne by the contractor. The useful martial shall be stacked as per direction of Engineer in charge. | - | Hours | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Form8.pdf
Tender Documents • 1.19 MB
Terms.pdf
Tender Documents • 0.12 MB
BOQ_199858.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .