Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.5 Cr+₹12.1 L (2.24%)Admitted-Finance PLOT NO 178 A MLA COLONY ROAD NO 12 BANJARA HILLS HYDERABAD 500 034 | HYDERABAD | TELANGANA | 500034 | ₹5.5 Cr+₹12.1 L (2.24%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 Cr+₹27.3 L (5.08%)Admitted-Finance | ₹5.7 Cr+₹27.3 L (5.08%) | L3 | Admitted-Finance |
| 4 | L4₹5.7 Cr+₹33.0 L (6.14%)Admitted-Finance | ₹5.7 Cr+₹33.0 L (6.14%) | L4 | Admitted-Finance |
| 5 | L5₹5.9 Cr+₹49.1 L (9.12%)Admitted-Finance | ₹5.9 Cr+₹49.1 L (9.12%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRICO PROJECTS PVT LTD L2 | SHIVA BUILDTECH PVT. LTD L4 | BCC DEVELOPERS AND PROMOTERS PVT LTD L9 | Shree Riddhi Siddhi Buildwell Limited L1 | KVR Construction Heights Pvt Ltd L7 | SRCR CONSTRUCTIONS L8 | SEKAR CONSTRUCTIONS L3 | SLR INFRASTRUCTURE PVT LTD L6 | SAKTHI ASSOCIATESS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00General note applicable to all sections : 1) Only sieved river sand/crushed stone sand confirming to Zone-II from Godavari river or Varaha river or Vamsadhara river or Sarada river or Nagavali river / Crushed stone sand shall be used as fine aggregate and Graded hard broken granite metal of 3 stage (VSI) material shall be used as coarse aggregate in relevant items. Specification for fine and coarse aggregate shall confirm to IS:383 (latest revision) 2) In view of limit on water-cement ratio for durability requirements in design mix concrete, concrete admixtures (Carboxylate based superplasticizers of approved quality) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for concrete items shall be inclusive of the cost of admixtures, Design mix, trial mixes, testing (at site & at approved labs), etc. complete. 3) The contractor shall set up sufficient number of self loading mobile concrete mixers inside the project area for the production of concrete. 4) Contractor may also be allowed to procure concrete from prior approved RMC plants on prior approval of the BARC subject to maintain required slump at site during pouring.To that extent suitable Mix Design should be carried out with required retention period. No extra payment will be made if concrete is brought from RMC plants outside the project area. | ||||||||||||
| 1.105) Manufacturer's Test certificate of cement which is procured from dealer/company is to be submitted for all cement related works by the contractor. 6) "Substrcture" referes to the part of structure upto top level of ground floor grade slab and "Superstructure"refers to the part of structure above the top of the ground floor grade slab. 7) The Scope of works which are not included in any specific items but indicated in the document "General Scope of all works" shall be within the scope of overall contract works. The cost of work/item/material indicated in this document shall be deemed to be included in the quoted rates of all individual items. | ||||||||||||
| 1.208) The quoted rates shall include necessary royalties, seigneiorage charges,etc. and all other charges to supply all the required construction materials. 9) For all standards and code of practices, specifications, like Indian Standard, MORT&H, ASTM, etc. refer only latest revisions including all applicable amendments, revisions and additional publications (during contract period) and these have to be followed. 10)Prior approval for source of all construction materials by submission of relavent test certificates, documents, invoices etc. have to be taken from BARC. 11) All the tests mentioned in Quality Assurance Plan(QAP) should be carried out without any extra cost. 12) The contractor has to submit all royalty /seigneiorage slips,etc for all the naturally available construction materials before submitting the RA bills. | ||||||||||||
| 2.00EARTH WORK EXCAVATION | ||||||||||||
| 2.10Notes: The rate quoted for earth work excavation by contractor is deemed to have included the following points (a) to (j) a) removal of all kinds of vegetation, small shrubs, light/heavy jungle, trees etc., alongwith roots, including disposal/stack in the identified location. b) shoring, strutting, stepping, dressing, grading required for keeping the earth in position on sides of trenches with approved timber/steel accessories wherever necessary to prevent sides from falling including bailing or pumping out of water if necessary including removal of debris/unserviceable materials and excavated excess soil, if any. c) dewatering of both ground and surface water, including removal of slurry generated while excavation and keeping the area free from water, to be let out of the building area through proper pipes & channels if required by suitable pumps, d) watering, ramming and thoroughly consolidate the bottom of all excavations & ground before the construction of foundation/footing/plinth beam, filling in basement or other work is commenced. | ||||||||||||
| 2.20e) the loose pockets shall be excavated and compacted after back filling as directed by Engineer-in-charge, as per detailed specification and conforming to safety rules during progress of the work. f) Contour levels to be taken jointly with the Engineer-in-charge and prior written approval be taken before starting any excavation/ filling at every 3 m grids for arriving at the actual quantity, g) Backfilling will be done in layers of thickness as specified below. h) Cost inclusive of necessary royalties, seigneiorage charges and other charges to supply all the required construction materials, i) cost of items shall include all labour charges, hire charges of machinery, lubricants, fuels and tests etc. | ||||||||||||
| 2.30Earth work excavation by mechanical means (Hydraulic excavator)/ manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including jungle Clearance, shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 500 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge | ||||||||||||
| 2.31 | i) From 0.00m to 1.50m below average GL with refilling of excavated earth in layers | 8,200 | Cum | 165 ₹13,53,000 | 145 ₹11,89,000 | 240 ₹19,68,000 | 125 ₹10,25,000 | 99 ₹8,11,800 Lowest | 200 ₹16,40,000 | 130 ₹10,66,000 | 250 ₹20,50,000 | 211 ₹17,30,200 |
| 2.32 | i) From1.5m to3.00m below average GL with refilling of excavated earth in layers | 2,876 | Cum | 210 ₹6,03,960 | 235 ₹6,75,860 | 299 ₹8,59,924 | 150 ₹4,31,400 | 100 ₹2,87,600 Lowest | 250 ₹7,19,000 | 160 ₹4,60,160 | 275 ₹7,90,900 | 222 ₹6,38,472 |
| 2.33 | i) From 3m to 4.50 m below average GL with refilling of excavated earth in layers | 800 | Cum | 320 ₹2,56,000 | 442 ₹3,53,600 | 335 ₹2,68,000 | 200 ₹1,60,000 | 117 ₹93,600 Lowest | 375 ₹3,00,000 | 200 ₹1,60,000 | 300 ₹2,40,000 | 244 ₹1,95,200 |
Tender Value
₹6.5 Cr
EMD Value
₹15.3 L
Closing Date
4 Jun 2026, 3:30 pmClosed
Chief Engineer, BARC, Visakhapatnam
BARC(V) main campus, Gajuwaka -Yellamanchili Road, Maduturu Sub Post Office, Visakhapatnam-531 011
Formation of Storm Water drains at Hillside and PEB office area in BARC main campus, Atchutapuram Near Visakhapatnam, A.P.
2026_BARC_906862_1
BARC(V)/CES/StormDrain/217
Open Tender
Civil Works - Others
Item Rate
Atchutapuram, Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹15.3 L
Meeting Room, UC-1 building, BARC(V)
14 Aug 2026
29 Apr 2026
16 Jun 2026
29 Apr 2026
4 Jun 2026
26 May 2026
29 Apr 2026 - 13 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1General note applicable to all sections : 1) Only sieved river sand/crushed stone sand confirming to Zone-II from Godavari river or Varaha river or Vamsadhara river or Sarada river or Nagavali river / Crushed stone sand shall be used as fine aggregate and Graded hard broken granite metal of 3 stage (VSI) material shall be used as coarse aggregate in relevant items. Specification for fine and coarse aggregate shall confirm to IS:383 (latest revision) 2) In view of limit on water-cement ratio for durability requirements in design mix concrete, concrete admixtures (Carboxylate based superplasticizers of approved quality) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for concrete items shall be inclusive of the cost of admixtures, Design mix, trial mixes, testing (at site & at approved labs), etc. complete. 3) The contractor shall set up sufficient number of self loading mobile concrete mixers inside the project area for the production of concrete. 4) Contractor may also be allowed to procure concrete from prior approved RMC plants on prior approval of the BARC subject to maintain required slump at site during pouring.To that extent suitable Mix Design should be carried out with required retention period. No extra payment will be made if concrete is brought from RMC plants outside the project area. | |||||
| 1.1 | 5) Manufacturer's Test certificate of cement which is procured from dealer/company is to be submitted for all cement related works by the contractor.
6) "Substrcture" referes to the part of structure upto top level of ground floor grade slab and "Superstructure"refers to the part of structure above the top of the ground floor grade slab.
7) The Scope of works which are not included in any specific items but indicated in the document "General Scope of all works" shall be within the scope of overall contract works. The cost of work/item/material indicated in this document shall be deemed to be included in the quoted rates of all individual items. | - | - | - | - |
| 1.2 | 8) The quoted rates shall include necessary royalties, seigneiorage charges,etc. and all other charges to supply all the required construction materials.
9) For all standards and code of practices, specifications, like Indian Standard, MORT&H, ASTM, etc. refer only latest revisions including all applicable amendments, revisions and additional publications (during contract period) and these have to be followed.
10)Prior approval for source of all construction materials by submission of relavent test certificates, documents, invoices etc. have to be taken from BARC.
11) All the tests mentioned in Quality Assurance Plan(QAP) should be carried out without any extra cost.
12) The contractor has to submit all royalty /seigneiorage slips,etc for all the naturally available construction materials before submitting the RA bills. | - | - | - | - |
| 2EARTH WORK EXCAVATION | |||||
| 2.2 | e) the loose pockets shall be excavated and compacted after back filling as directed by Engineer-in-charge, as per detailed specification and conforming to safety rules during progress of the work.
f) Contour levels to be taken jointly with the Engineer-in-charge and prior written approval be taken before starting any excavation/ filling at every 3 m grids for arriving at the actual quantity,
g) Backfilling will be done in layers of thickness as specified below.
h) Cost inclusive of necessary royalties, seigneiorage charges and other charges to supply all the required construction materials,
i) cost of items shall include all labour charges, hire charges of machinery, lubricants, fuels and tests etc. | - | - | - | - |
| 2.3 | Earth work excavation by mechanical means (Hydraulic excavator)/ manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including jungle Clearance, shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 500 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge | - | - | - | - |
| 2.31 | i) From 0.00m to 1.50m below average GL with refilling of excavated earth in layers | 8,200 | Cum | - | - |
| 2.32 | i) From1.5m to3.00m below average GL with refilling of excavated earth in layers | 2,876 | Cum | - | - |
| 2.33 | i) From 3m to 4.50 m below average GL with refilling of excavated earth in layers | 800 | Cum | - | - |
| 3 | Filling, spreading with available excavated murrum/gravel with a maximum lead of 1000m in the area wherever specified including breaking clods, storing, transportation, watering, with compacted thickness of each layer not exceeding 250mm with suitable vibratory roller to achieve 90% proctor density at optimum moisture content, all leads and lifts, bailing/ pumping out of water to keep site dry while backfilling. Cost shall include conveyance of all materials, labour, machinery, etc. complete. The rate quoted shall include testing as per QAP, loading, unloading, hire and fuel charges for tools and plants and other incidental charges etc. all as per drawings, specifications and as directed by the Engineer-In-charge. | 100 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
FORMSATOH.xls
Additional Documents • 0.10 MB
TenderDoc.pdf
Tender Documents • 7.30 MB
BOQ_953196.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .