| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13 CrAccepted-AOC | ₹13 Cr | L1 | Accepted-AOC Lowest rate quoted |
| 2 | L2₹13.8 CrRejected-Finance | ₹13.8 Cr | L2 | Rejected-Finance High rate quoted |
| 3 | Rejected-Technical CHAMOGURI SATRA KAMALABARI CITY TOWN MAJULI P O KAMALABARI P S MAJULI DIST MAJULI PIN 785110 | MAJULI | MAJULI | ASSAM | 785110 | - | - | Rejected-Technical Technically not qualified |
| 4 | Rejected-Technical NIRAJ HOUSE SUNDER BAUG NEAR DEONAR BUS DEPOT CHEMBUR MUMBAI MAHARASHTRA 440 088 | - | - | Rejected-Technical Technically not qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
Tender Value
Refer Docs
Closing Date
6 Dec 2021, 10:00 amClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizoram
DESIGN AND CONSTN OF THREE NOS MAJOR PERMANENT BRIDGES OF SPAN 30 MTR AT KM 121 PT 730 COMMA 30 MTR AT KM 127 PT 270 AND 40 MTR AT KM 156 PT 120 ON ROAD SAIRANG TUIPUIBARI UNDER 74 RCC 24 BRTF UNDER PROJECT PUSHPAK IN MIZORAM STATE
2021_BRO_484628_1
CE (P) PSK-03 OF 2021-22
Open Tender
Civil Works
730 days
AT KM 121 PT 73 COMMA KM 127 PT 27 AND KM 153 PT12
As per Tender documents
8 documents required · 8 mandatory
₹0
Exempted
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizor
8 Mar 2022
28 Oct 2021
7 Dec 2021
28 Oct 2021
6 Dec 2021
2 Nov 2021
29 Oct 2021 - 1 Nov 2021
30 Oct 2021
Amount
FOR PART-I : 30 MTR SPAN AT KM 121.730 ON SAIRANG-TUIPUIBARI ROAD
Design including proof checking and construction of 30 mtr span Major Pmt bridge with PSC Box Girder Superstructure on open foundation including carrying out SSI over Dampalui river at Km 121.730 on Sairang-Tuipuibari road under 74 RCC /24 BRTF Project Pushpak in Mizoram State with span arrangement as per NIT Drg and based on hydraulic data, sub soil data, Special conditions, Particular specifications of the tender document. Construction works includes all preparatory work, Erection of staging/shuttering, abutments, piers, return wall, placing of POT & POT cum PTFE bearings, casting of PSC Box Girder superstructure, Prestressing, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, foot paths, kerbs, RCC hand rails, drainage spout, load testing of superstructure of bridge, protective works, temporary river training works and diversion and all other items of works required for the completion of the bridge including curing except work on Approaches
FOR PART-II : 30 MTR SPAN AT KM 127.270 ON SAIRANG-TUIPUIBARI ROAD
Design including proof checking and construction of 30 mtr span Major Pmt bridge with PSC Box Girder Superstructure on open foundation including carrying out SSI over Damparengpuilui at Km 127.270 on Sairang-Tuipuibari road under 74 RCC /24 BRTF Project Pushpak in Mizoram State with span arrangement as per NIT Drg and based on hydraulic data, sub soil data, Special conditions, Particular specifications of the tender document. Construction works includes all preparatory work, Erection of staging/shuttering, abutments, piers, return wall, placing of POT & POT cum PTFE bearings, casting of PSC Box Girder superstructure, Prestressing, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, foot paths, kerbs, RCC hand rails, drainage spout, load testing of superstructure of bridge, protective works, temporary river training works and diversion and all other items of works required for the completion of the bridge including curing except work on Approaches
FOR PART-III : 40 MTR SPAN AT KM 156.120 ON SAIRANG-TUIPUIBARI ROAD
Design including proof checking and construction of 40 mtr span Major Pmt bridge with PSC Box Girder Superstructure on open foundation including carrying out SSI over Ansurilui at Km 156.100 on Sairang-Tuipuibari road under 74 RCC /24 BRTF Project Pushpak in Mizoram State with span arrangement as per NIT Drg and based on hydraulic data, sub soil data, Special conditions, Particular specifications of the tender document. Construction works includes all preparatory work, Erection of staging/shuttering, abutments, piers, return wall, placing of POT & POT cum PTFE bearings, casting of PSC Box Girder superstructure, Prestressing, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, foot paths, kerbs, RCC hand rails, drainage spout, load testing of superstructure of bridge, protective works, temporary river training works and diversion and all other items of works required for the completion of the bridge including curing except work on Approaches
Urban Infraprojects Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf