Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC GOA GOA | SOUTH GOA | GOA | 403103 | L1 | Accepted-AOC LOWEST L1 BIDDER | |
| 2 | L2₹17.7 LSame as L1Rejected-Finance H NO ERH1 SAI VIBHA VILLA NOVA ESTATE OPPT QUBA MASJID KHARABAND MARGAO GOA | NORTH GOA | GOA | 403001 | L2 | Rejected-Finance SECOND LOWEST BIDDER | |
| 3 | L3₹17.7 LSame as L1Rejected-Finance | L3 | Rejected-Finance THIRD LOWEST BIDDER | |
| 4 | L4₹17.7 L+₹0.17 (<0.01%)Rejected-Finance H NO 298 F COMBA SAO JOSE DE AREAL SALCETE GOA | SAO JOSE DE AREAL | SALCETE | GOA | L4 | Rejected-Finance FOURTH LOWEST BIDDER | |
| 5 | Rejected-Technical | - | Rejected-Technical Documents does not match with bidder name |
Tender Value
₹22.2 L
EMD Value
₹44,300
Closing Date
21 Oct 2023, 4:00 pmClosed
EE II, WRD
Aquem Baixo Rawanfond
Improvement to the nallah and construction of protection wall from the nallah in Sy. No. 104-2A and Sy. No. 129-1 at Ambulor in Village Verna in Nuvem Constituency of Salcete Taluka
2023_WRD_11758_1
WDII/TECH/F17/23e/2023-24/SN1
Open Tender
Miscellaneous Works
Item Rate
60 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹44,300
8 Dec 2023
9 Oct 2023
23 Oct 2023
9 Oct 2023
21 Oct 2023
9 Oct 2023
Amount
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel, moorum of all varieties,shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary or disintergrated rock, weathered,fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any appr. method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including setting out construction of shoring and bracing, removal of stump and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock as directed by the Engineer in charge etc. for all lead and lifts etc. as specified and directed etc. all complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete.
Laterite boulder masonry in cement concrete 1:3:6 (1 cement, 3 coarse sand : 6 graded granitic stone aggrt. 40mm nominal size) in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge B. 75mm Dia
Prashant P. G. Amonkar
Ummukulsu MA
minguel gomes
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .