Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.6 LAccepted-AOC MISSION CHARIALI NH 37 A PO KETEKIBARI TEZPUR 784 154 ASSAM | SONITPUR | ASSAM | 784154 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹48.1 L+₹1.0 L (2.20%)Rejected-AOC | L2 | Rejected-AOC Being L2 | |
| 3 | L3₹48.4 L+₹1.4 L (2.94%)Rejected-AOC | L3 | Rejected-AOC Being L3 | |
| 4 | L4₹48.7 L+₹1.7 L (3.55%)Rejected-AOC TUPKHANA PART 1 PO ARUNACHAL PS SILCHAR DIST CACHAR ASSAM 788025 | CACHAR | ASSAM | 788025 | L4 | Rejected-AOC Being L4 | |
| 5 | L5₹49.5 L+₹2.4 L (5.15%)Rejected-AOC | L5 | Rejected-AOC Being L5 |
| Sl No | Description | Qty | Unit | Anup Kumar Paul Choudhury L7 | M/S TAPAN KUMAR RAY L3 | MS AFTAB LASKAR L6 | MS AFTAB LASKAR L6 | m/s builders and suppliers L2 | SHRI YOUNUS KHAN L5 | LUIT CONSTRUCTION L1 | M/S R A ENTERPRISE L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00E & M Division Items | |||||||||||
| 2.00 | M&L for cleaning of UG sump of 100000 Gln capacity at Srikona Pump House as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | 25,400 ₹25,400 Lowest | 25,400 ₹25,400 Lowest | 28,000 ₹28,000 | 28,000 ₹28,000 | 25,400 ₹25,400 Lowest | 27,200 ₹27,200 | 28,000 ₹28,000 | 27,100 ₹27,100 |
| 3.00 | M&L for cleaning of UG sump of 70000 Gln capacity at Main Pump House, Kalibari as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | 2,210 ₹2,210 Lowest | 2,230 ₹2,230 | 22,200 ₹22,200 | 22,200 ₹22,200 | 22,200 ₹22,200 | 22,000 ₹22,000 | 21,000 ₹21,000 | 22,200 ₹22,200 |
| 4.00 | M&L for cleaning of UG sump of 40000 Gln capacity at Main Pump House, Kalibari as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | 17,100 ₹17,100 | 17,100 ₹17,100 | 16,550 ₹16,550 | 16,550 ₹16,550 | 17,100 ₹17,100 | 16,520 ₹16,520 | 16,000 ₹16,000 Lowest | 17,100 ₹17,100 |
| 5.00 | M&L for cleaning of UG sump of 20000 Gln capacity at Srikona Pump House, Kalibari as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | 14,520 ₹14,520 | 14,520 ₹14,520 | 14,100 ₹14,100 | 14,100 ₹14,100 | 14,250 ₹14,250 | 14,200 ₹14,200 | 10,500 ₹10,500 Lowest | 14,100 ₹14,100 |
| 6.00 | M&L for cleaning of UG sump of 15000 Gln capacity at ARO, Silchar as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | 11,120 ₹11,120 | 11,200 ₹11,200 | 11,000 ₹11,000 | 11,000 ₹11,000 | 11,200 ₹11,200 | 11,000 ₹11,000 | 10,000 ₹10,000 Lowest | 11,200 ₹11,200 |
| 7.00 | M&L for cleaning of UG sump of 10000 Gln capacity at Srikona Pump House as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | 11,200 ₹11,200 | 11,200 ₹11,200 | 10,110 ₹10,110 | 10,110 ₹10,110 | 10,200 ₹10,200 | 10,200 ₹10,200 | 9,500 ₹9,500 Lowest | 10,200 ₹10,200 |
| 8.00 | M&L for cleaning of UG sump of 10000 Gln capacity at NCC Silchar as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | 11,200 ₹11,200 | 12,200 ₹12,200 | 11,150 ₹11,150 | 11,150 ₹11,150 | 12,200 ₹12,200 | 11,210 ₹11,210 | 9,200 ₹9,200 Lowest | 11,200 ₹11,200 |
| 9.00Notes : applicable for item No 01 to 07 mentioned above (a) Suitably blocking the incomimg and outgoing wash out pipes for avoiding mud and foreign materials deposited in the sump getting into pipes and chocking it prior to starting the cleaning. (b) Bail out complete water remaining in the UG sump before cleaning the mud and other deposits. (c) Filling up the UG sump full and feed the affected residential/OTM consumers enough water to sustain during the sump cleaning period. (d) Manually remove deposited mud sludge and other foreign particles and deposit the same separately away from tanks in low laying areas and levelling as directed by Engineer-in-Charge. (e) Clean the floor wall and dome of the UG sump by jetting water using rotary pressure jets, remove the sludge so deposited completely by rubbing the wall/floor with brushes and repeat removal and depositing (Approved detergent shall be used). (f) Disinfect the tank with FOA/WHO specified chemical and make the tank totally bacteria free. (g) Apply a coat of white cement paint outside surface area as per directed by Engr-in-Charge. (h) Writing of the date of cleaning of the water tank with white letters on black background. | |||||||||||
| 10.00 | M&L for cleaning of OH reservoirs of capacity 35000 Gln at Lorry Point, manually as described below and all as directed by Engr-in-Charge. | 3 | Each Job | 15,200 ₹45,600 Lowest | 15,200 ₹45,600 Lowest | 16,200 ₹48,600 | 16,200 ₹48,600 | 16,200 ₹48,600 | 16,200 ₹48,600 | 16,000 ₹48,000 | 16,200 ₹48,600 |
Tender Value
₹44.9 L
EMD Value
₹89,800
Closing Date
3 Jun 2026, 6:00 pmClosed
GE SILCHAR
Office of The GE Silchar Masimpur Cantt
MAINT OF FILTRATION BEDS, SEDIMENTATION BEDS, WATER STORAGE TANKS, FILTRATION PLANT, GRAVITY FILTERS, CLEANING OF JACK WELL, UG SUMPS, OH TANKS AND DOSING PUMPS INCL DOSING OF REAGENTS FOR WATER SUPPLY OF MASIMPUR MIL STN INCL ARMY EST AT KUMBHIGRAM
2026_MES_764781_1
8148A/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Masimpur
Class D Category a ii and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹89,800
Yes
4 Aug 2026
12 May 2026
6 Jun 2026
12 May 2026
3 Jun 2026
27 May 2026
12 May 2026 - 22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E & M Division Items | - | - | - | - |
| 2 | M&L for cleaning of UG sump of 100000 Gln capacity at Srikona Pump House as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | - | - |
| 3 | M&L for cleaning of UG sump of 70000 Gln capacity at Main Pump House, Kalibari as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | - | - |
| 4 | M&L for cleaning of UG sump of 40000 Gln capacity at Main Pump House, Kalibari as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | - | - |
| 5 | M&L for cleaning of UG sump of 20000 Gln capacity at Srikona Pump House, Kalibari as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | - | - |
| 6 | M&L for cleaning of UG sump of 15000 Gln capacity at ARO, Silchar as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | - | - |
| 7 | M&L for cleaning of UG sump of 10000 Gln capacity at Srikona Pump House as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | - | - |
| 8 | M&L for cleaning of UG sump of 10000 Gln capacity at NCC Silchar as per notes described below and all as directed by Engr-in-Charge | 1 | Each Job | - | - |
| 10 | M&L for cleaning of OH reservoirs of capacity 35000 Gln at Lorry Point, manually as described below and all as directed by Engr-in-Charge. | 3 | Each Job | - | - |
| 11 | M&L for cleaning of OH reservoirs of capacity 20000 Gln near Bde Cmdr mess manually as described below and all as directed by Engr-in-Charge. | 1 | Each Job | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_856585.xls
BOQ • 0.37 MB
8148A-TP.pdf
Tender Documents • 0.47 MB
8148A-SchOfCreditformat.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .