| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance 34 40 41 EALISAHAR SHIB TALA LANE P O P S HALISAHAR NORTH 24 PARGANAS PIN 743134 | HALISAHAR | NORTH 24 PARGANAS | WEST BENGAL | 743134 | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹10.6 L+₹20,967.88 (2.01%)Rejected-Finance | L2 | Rejected-Finance Higher rate than L1 Bidder | |
| 3 | L3₹10.7 L+₹26,183.77 (2.51%)Rejected-Finance | L3 | Rejected-Finance Higher rate than L1 Bidder |
Tender Value
₹10.4 L
EMD Value
₹20,864
Closing Date
5 Mar 2026, 6:00 pmClosed
Executive Officer, Gayeshpur Municipality
Kataganj, Nadia
Repairing and renovation of ICDS center with electrification and plumbing works including nearby C C road at Ward no 18 within Gayeshpur Municipality Booth No 228 Scheme Id- APAS/01/092/228/0013
2026_MAD_1014753_54
WBMAD/GM/PW/NIT-27/2025-26 Dated 24/02/2026
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
30 days
Gayeshpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹20,864
14 Mar 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement
concrete plain or reinforced, stacking serviceable
materials at site and removing rubbish as directed
within a lead of 75 m.
a) In ground floor including roof. | 4.09 | Cu. M | 447 | ₹1,827.11 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sortsof soil (including mixed soil but excluding laterite or sandstone)including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item ncludes necessary trimming the sides oftrenches, levelling, dressing and ramming the bottom, bailing out wateras required complete. (a) Depth of excavation not exceeding 1,500 mm. | 9.84 | Cu. M | 119.3 | ₹1,174.15 |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of inished quantity of work) (a) With earth obtained from excavation of foundation. | 8.37 | Cu. M | 77.5 | ₹648.44 |
| 4 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 25.53 | Cu. M | 936.2 | ₹23,898.38 |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 24.79 | Sq. M. | 24 | ₹594.96 |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 350.68 | Sq. M. | 361 | ₹1,26,593.68 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. | 42.09 | Cu. M | 5,250.3 | ₹2,20,995.63 |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.( I ) Pakur Variety.
Foundation & Plinth , Ground Floor | 8.56 | Cu. M | 5,746.8 | ₹49,169.62 |
| 9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initialstraightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild SteelI. (ii) JSW/JSPI........ /SSL. Foundation & Plinth , Ground Floor . | 0.91 | M. T. | 54,865 | ₹49,747.3 |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor.
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 82.78 | Sq. M. | 335 | ₹27,730.46 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_2494154.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .