Loading…
Loading…
Tender Value
₹82.2 L
EMD Value
₹1.0 L
Closing Date
14 Sept 2026, 5:00 pm2d left
GM (Oprn.)
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction for 1 Sealing T20 Sub Panel II 03 Nos permanent RCC Isolation stopping and T21A Panel 05 Nos Permanent RCC Isolation stoppings2 11 Nos of Permanent RCC Isolation Stoppings at Depillaring Panel T21 Sub Panel T21A3 and
2026_SECL_364317_1
SECL/BKP/GMO/2026-27/JML/eT/04 DT 26.08.2026
Open Tender
Civil Works - Others
Item Rate
120 days
Jhilimili SA, Baikunthpur Area, Dist. Koriya
Please refer Tender document
5 documents required · 5 mandatory
₹1.0 L
27 Aug 2026
27 Aug 2026
15 Sept 2026
28 Aug 2026
14 Sept 2026
28 Aug 2026
28 Aug 2026 - 7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of Work | |||||
| 1.01 | Mulma Cleaning / removal of debris from galleries & cleaning of belt roadway and stacking / loading with 50 m. ( Qty= 7.62+72.60+26.81=107.03Cum) | 107.03 | Cum | 775.18 | ₹82,967.52 |
| 2 | Groove Cutting/ Floor cutting for stopping / Manhole by chisel & hammer a) Hard stone
( Qty = 1.88+11.97+3.68= 17.53cum) | - | Cum | 6,875.48 | - |
| 3 | Groove Cutting/ Floor cutting for stopping / Manhole by chisel & hammer d) Coal
(Qty= 1.69+19.36+3.50=24.55cum) | - | Cum | 1,952.3 | - |
| 4 | Reinforcement for RCC work including strainthning, cutting, bending, placing in position and binding all complete
(Qty=826.77+3648.25+698.53= 5173.55 Kg) | - | Kg | 112.71 | - |
| 5 | Reinforcement for Cement Concrete work in wall (any thickness) including attached pilaster, buttesses plinth and string courses,fillets, column, pillars,piers, abutments, posts and structs etc, above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1:5:3
( Qty=28.85+176.53+61.94=267.32cum) | - | Cum | 11,922.67 | - |
| 6 | Centering & shutteringinc including strutting propping etc and removal of form of all heights: wall (any thickness)including attached pilasters, buteresses, plinth and string courses etc.
( Qty=168.03+726.00+525.28=1419.31sqm) | - | Sqm | 461.18 | - |
| 7 | 12 mm cement / lime plastering ratio of 1:6 up to 5 meter and above in UG.
(Qty= 260.83+979.00+414.88= 1654.71sqm) | - | Sqm | 436.27 | - |
| 8 | Loading of materials into tub-loading of materials into Tub.
(Qty=49.88+290.65+103.19=443.72 cum) | - | Cum | 298.77 | - |
| 9 | Un-loading of materials at destination point in UG.
(Qty=49.88+290.65+103.19=443.72 cum) | - | Cum | 216.92 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 1.62 MB
Tendernotice_3.pdf
PDF • 0.97 MB
BOQ_377238.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .