Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72,000Accepted-Finance 18C SADH NAGAR PALAM COLONY SOUTH WEST DELHI DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹72,875+₹875 (1.22%)Rejected-Finance | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹73,300+₹1,300 (1.81%)Rejected-Finance | L3 | Rejected-Finance Being other than L1 | |
| 4 | L4₹74,125+₹2,125 (2.95%)Rejected-Finance | L4 | Rejected-Finance Being other than L1 | |
| 5 | L5₹74,200+₹2,200 (3.06%)Rejected-Finance | L5 | Rejected-Finance Being other than L1 |
Tender Value
Refer Docs
Closing Date
10 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (West) Lucknow
GE (West) Lucknow
Job Work
2022_MES_511949_1
3020/W/JO/13/E3 of 2021-22
Limited
Miscellaneous Services
Works
90 days
GE (West) Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
24 Mar 2022
4 Mar 2022
11 Mar 2022
4 Mar 2022
10 Mar 2022
4 Mar 2022
60 days
JOB REQUIRED TO BE CARRIED OUT FOR REPAIR/REPLACEMENT U/S PARTS OF VEH BA NO 17C-105185P TATA NEXON OF GE (WEST) LUCKNOW (a) Taking down of suspension system, clutch system and differential system and reassemble after replacement of following items:- (i) Suspension bushing kit-1 set (ii) U J Cross-3 Nos (iii) greasing of all parts-1 job (iv) Clutch plate complete-1 No (v) Pressure plate complete-1 No (vi) Clutch cover assy-1 No (vii) Clutch Disc cover assy-1 No (viii) Arm clutch release-2 Nos (ix) Bearing clutch release-1 No (x) Clutch facing kit-1 No (xi) Fly wheel assy-1 No (xii) Differential star gear set-1 Nos (b)Repair to Self : Taking down clutch sys after oiling, greasing and replacing the fwg parts :-- (i) Self armature- 1 No (ii) Armature bush- 3 No (iii) Self carbon brush-1 No (iv) Solenoid switch - 01 No (v) Self bendex assy-1 Nos (c) M&L for replacement of following itesm:- (i) Back light complete with bulb - 2 Nos (ii) Indicator light with cover - 2 Nos (iii) Window glass 6mm (size 2’x2’)-2 No (iv) Window regulator handle -4 Nos (v) Fog light lamp assembly for Tata Xenon -2 Nos (d) Scrapping of old paint of left side door & front bonet side preparation of surface & one coat of bonet cover, front bumper with super metallic blue & black colour and existing the same and writing the BA No front & rear side complete.- 1 Job (e) Servicing and wheel alignment complete after repair of veh- 1 Job (f) Testing & commissioning after assembly of head, all repair work complete of all works- 01 Job
Annu Traders
M/s Blue Diamond Agencies
A R Enterprises
New ndia Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .