Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹19.8 LAccepted-AOC TEHSIL SWAR DISTT RAMPUR U P | 1st | Accepted-AOC Lowest | |
| 2 | 2nd₹19.9 L+₹12,980 (0.66%)Rejected-Finance | 2nd | Rejected-Finance Not Qualify |
Tender Value
Refer Docs
EMD Value
₹39,800
Closing Date
17 Nov 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer, Mechanical Division. UPJN, Haldwani
Construction of 01No 125 mm dia 120 Mtr deep Tubewell and SITC of Solar Powered Submersible pumping plant for Patoti peyjal yojna in Vikas khand Bajpur of Distt Udham Singh Nagar under jal jeevan mission programme
2022_MDPEY_51171_1
4057/E-TENDER/262 Dated 02.11.2022
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
365 days
Haldwani
Please refer tender documents
3 documents required · 3 mandatory
₹1,770
Executive Engineer, Mechanical Division. UPJN, Hal
₹39,800
Haldwani
27 Sept 2023
5 Nov 2022
19 Nov 2022
7 Nov 2022
17 Nov 2022
12 Nov 2022
11 Nov 2022
Amount
Construction of 1No. 125mm dia, 120Mt. deep Tubewell.
Transportation of Rig machine, compressor O.P. unit, T & P and other equipments up to site & back transportation after completion of work
Installation of Rig machine, Camp equipage after site clearance.
Drilling 350mm dia size final bore from G.L. to 120.00 MBGL Including arrangemt of water, Geophysical logging of bore well, feeding of pea-gravel & collection of strata sample in box.
Preparing and Lowering of 125mm dia plain/slotted pipe tube well assembly from GL to 120MBGL
Dismantling of Rig machine after completion of work. Fitting of girder, clamp and well cap with site clearance
Supply of material for tubewell assembly
Supply of 125mm dia mini 5.4mm thick M.S.E.R.W. Plain pipe.
Supply of 125mm dia 5.4mm thick M.S.E.R.W. Slotted pipe.
Supply of 125x100mm dia size M.S Girder 4Mt. Long.
Supply of 125mm dia Bail plug with hook.
Supply of M.S. heavy duty D.E clamp suitable for 125mm dia.
Supply of 125mm dia well cap.
Supply of pea-Gravel 2.00 mm to 4.00mm.
Development of Tubewell by 350 PSI/1100CFM air comperssor.
Development by Air compressor including erection of Air compressor unit and dismantling after work as per specification.
Development of Tubewell by O.P. unit of suitable capacity.
Development by O.P unit to get sand free discharge of 125 LPM including erection of O.P. Unit and dismantling after work as per specification.
Geohydrologgical survey of site
Chemical & Bacteriological Test of water
S.I.T.C. of Solar Submersible Pumping Plant with Accessories for Tubewell
Supply of submerisble solar A.C/D.C pump with adequate capacitysuitable for 125mm dia Assembly , motor complete with 1.0 Meter cable complete in all respects for 36000LPD /100LPM at 60Mtr Head, 3 HP.
Supply of Spare pump of same duty cycle
Supply of solar hybrid pump controller (Control panel cum starter) suitable for above pump- motor set also suitable for on grid supply as per following parameters . (i)Inbuilt MPPT Tracking facility ensuring overload under over voltage protection force air time of lack of radiation (ii) Parameter display facilities (iii) Auto reset after every fault (iv) Dry running protection to avoid dry run of motor
Solar photo voltage poly crystalline solar module 2900wt. Minimum As per IEC standrard (for above pump) including Chain link/wire mesh fencing system of suitable size to protect solar PV module system From unathorized intrusion.
Supply of main piping & valves as per scope of work and technical specifications
Tools
Construction RCC Foundation with suitable foundation Nut, Bolts and Supply & fitting of G.I. Solar Panel mounting structure including panel mounting clamp, pole etc complete in all respect.
Installation, commissioning and setting to work and testing of entire equipment installed at site including supply of necessary fixing accessories like insulation, teflon tape etc.
2.5sq.mm x 3 core copper flexible cable
Supply and fixing of Electronic type dosing system complete with solenoid coil actuated pulsar circuit, diaphragm & electronically pulp capable of delivery max, 4LPH at 5.5kg./cm2 pressure operated 220Volt single phase A.C. Supply along with chemical injection device and 100Ltrs capacity of media tank complete with accessories.
Liquid Chlorine required for six month maintenance
S/o Chlorine Testing Kit
Chain Pulley block of 1.5 tonne capacity 4Mt. Lift.
Rubber insulation sheet 1 Mt. x 2Mt.x 0.025Mt
Lightening arrestor, Copper strip, Earth kit and Chemical earthing as per latest IE rules has to be provided for Cathodes and rest as per normal GI earth strips from cathode to different equipments
Internal & External Electrification of pump house for Proposed Tubewell
One month Trial Running & Five month operation, Maintenance including watch & ward.
M/S PARVATIYA ENGG. WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .