| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAccepted-AOC H NO 368 ZUAREM TUEM PERNEM GOA | ₹21.9 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Being highest bidder |
| Sl No | Description | Qty | Unit | SAIBINI CONSTRUCTION L1 | CBK Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001). | 7,200 | Sq.m. | 4.5 ₹32,400 Lowest | 10 ₹72,000 |
| 2.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. b) All types of Ordinary rock including all types of laterite rock, blasting prohibited. | 77 | Cu.m. | 280 ₹21,560 Lowest | 600 ₹46,200 |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of form work for: a) Foundations, footings, bases for columns and mass concrete. | 308 | Sq.m. | 400 ₹1,23,200 Lowest | 400 ₹1,23,200 Lowest |
| 4.00 | Providing and laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level. | 108 | Cu.m. | 6,750 ₹7,29,000 Lowest | 7,000 ₹7,56,000 |
| 5.00 | Supplying at site 2.00 m long RCC standard struts. | 962 | Each | 540 ₹5,19,480 | 350 ₹3,36,700 Lowest |
| 6.00 | 1.5 mtr. Height fencing with 2.00 mtr. R.C.C. Posts of standard 30 design placed at 3 mtr. Apart embedded in cement concrete blocks, corner, end with 7 horizontal lines & every bay to be strutted with two diogonal of G.I. Barbed wire / plain wire having weight of 9.33 kg/100 mtr. minimum between two post, fitted and fixed with G.I. stapples on wooden plug tied to 6mm bar nib with binding wire (cost of posts, struts, earthwork and concrete to be paid separately). | 2,400 | Metre | 180 ₹4,32,000 Lowest | 255 ₹6,12,000 |
Tender Value
₹23.0 L
EMD Value
₹46,040
Closing Date
9 Sept 2025, 10:00 amClosed
Executive Engineer, W.D.VII, W.R.D.
Dhargal, Pernem, Goa.
Fifth Revised Estimate of the Interstate Tillari Irrigation Project - Canal network in Goa. Reg. Providing fencing along the acquired boundary of B-8 Distributory of RBMC of TIP from Ch.1.790 Kms. to Ch.2.990 Kms. in Virnoda village in Pernem Taluka.
2025_WRD_24264_1
WRD/WDVII/PB/F3/25-26/TN-12/2
Open Tender
Civil Works
Item Rate
60 days
Virnoda Village in Pernem Taluka
As per Tender Notice, Form etc.
3 documents required · 3 mandatory
₹3,000
₹46,040
16 Oct 2025
19 Aug 2025
11 Sept 2025
19 Aug 2025
9 Sept 2025
19 Aug 2025
Amount
Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001).
Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. b) All types of Ordinary rock including all types of laterite rock, blasting prohibited.
Centering and shuttering including struttings, propping etc. and removal of form work for: a) Foundations, footings, bases for columns and mass concrete.
Providing and laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level.
Supplying at site 2.00 m long RCC standard struts.
1.5 mtr. Height fencing with 2.00 mtr. R.C.C. Posts of standard 30 design placed at 3 mtr. Apart embedded in cement concrete blocks, corner, end with 7 horizontal lines & every bay to be strutted with two diogonal of G.I. Barbed wire / plain wire having weight of 9.33 kg/100 mtr. minimum between two post, fitted and fixed with G.I. stapples on wooden plug tied to 6mm bar nib with binding wire (cost of posts, struts, earthwork and concrete to be paid separately).
CBK Constructions (BID ID -52293)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_24688.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .