Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
22 Jul 2026, 4:00 pm
Executive Engineer Power House Division BHEP
Office of Executive Engineer Power House Division BHEP
Provision for Treatment of Detached Shotcrete in ADIT II to HRT II
2026_SPDC_314202_1
ENIT 01 of 2026-27
Open Tender
Civil Works
Power House BHEP Stage II
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
CPAO BHEP
₹29,000
Office of Executive Engineer PHD BHEP
1 Jul 2026
1 Jul 2026
23 Jul 2026
1 Jul 2026
22 Jul 2026
1 Jul 2026
1 Jul 2026 - 20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Chipping of unsound/weak concrete material from slabs, beams,columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge
50 mm average thickness | - | Sqm | 208.8 | - |
| 2 | Providing and applying 50 mm thick Steel Fibre Reinforced Shotcrete (SFRS) with steel fibre dosage @ 35–40 kg per cum in tunnel walls, crown, and inner surfaces, in layers, using approved design mix concrete having minimum characteristic compressive strength of M35, with Ordinary Portland Cement, coarse sand, and graded stone aggregates of 10 mm maximum size, conforming to relevant IS codes and specifications, including surface preparation, application by wet-mix process, finishing, curing, and protection, complete. | - | Sqm | 1,900 | - |
| 3 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | - | Sqm | 265.3 | - |
| 4 | Carriage of Sand by MT for 125 Kms | - | Cum | 1,569.14 | - |
| 5 | Carriage of Aggregate by MT for 14 Kms | 1 | Cum | 331.4 | ₹331.37 |
| 6 | Carriage of Cement by MT for 10 Kms | - | MT | 248.03 | - |
| 7 | Carriage of Steel Fibres by MT for 153 Kms | - | MT | 1,669.06 | - |
| 8 | Disposal of Excavated Rock out side project area 5 kms | - | Cum | 200.74 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
SBDShotcrete.pdf
Tender Documents • 0.43 MB
BOQ_1017311.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid