| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.0 L+₹4,683 (2.35%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | L2 | Rejected-Finance L2 | |
| 3 | L2₹2.0 L+₹4,683 (2.35%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 4 | L3₹2.1 L+₹15,219 (7.65%)Rejected-Finance VILL GALYAN PO GHUMARWIN TEHSIL GHUMARWIN DISTT BILASPUR HP 174021 | BILASPUR | HIMACHAL PRADESH | 174021 | L3 | Rejected-Finance L3 | |
| 5 | L4₹2.2 L+₹21,073 (10.6%)Rejected-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | L4 | Rejected-Finance L4 |
Tender Value
₹2.3 L
EMD Value
₹5,500
Closing Date
25 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Restoration of rain damages on link road from Hari Talyanger NH-103 to Harizan Basti Dangar via OBC Basti Meire km 0/00 to 1/500 SH Construction of 900 mm dia Hume pipe culvert at RD 0/790 Under NDRF
2026_PWD_143652_2
6450-56 dt. 16/9/2026
Open Tender
Civil Works
Percentage
30 days
GHUMARWIN
AS PER SBD
10 documents required · 10 mandatory
₹350
₹5,500
Yes
12 Oct 2026
18 Sept 2026
26 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
18 Sept 2026 - 25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and MORD technical specification 2014 clause 305 ( Three zero five ) and as per direction of the Engineer-in-Charge . The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 26.83 | Per Cubic metre | 211.86 | ₹5,684.2 |
| - | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:4:8 (One Cement is to four coarse sand is to eight crushed graded stone aggregate) 40 mm (forty millimetre) nominal size as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 2.18 | Per cubic metre | 4,237.29 | ₹9,237.29 |
| - | Providing and laying cement concrete 1:3:6 (one cement is to three sand is to six crushed graded stone aggregate 40mm (forty millimetre) nominal size including cost of centring and shuttering in Foundations and plinth as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 10.24 | Per cubic metre | 4,576.27 | ₹46,861 |
| - | Providing and laying reinforced cement concrete hume pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (One Cement is to two Sand) including cost of excavation, protection work, back filling,testing of joints ,concrete and masonary work in head walls and parapet as per MORD Technical Specification 2014 Clause 1108. 900mm dia ( Nine hundred millimetre) dia including entire carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-charge. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 7.5 | Per running metre | 3,305.08 | ₹24,788.1 |
| - | Providing and Laying cement concrete 1:5:10 nominal mix ( One Cement is to five Sand is to Ten graded crushed stone aggregrate.) 40mm ( forty milimetre) nominal size with minimum cement contents 130 kg (One hundred thirty kilogram) per cubic metre and curring complete . including cost of form work for plain /reinforce concrete in retaining walls, breast wall as per drawing and MORD tecnical specification 2014 Clause 800 and 1200 including carriage of material with in all leads and lifts ,shoring and shuttering and curring complete including pumping or bailing out water (surface and sub soil water) up to all depth and any quantum of water including cleaning of slush which may arise out during dewatering and carriage of machinery, material ,tools equipment safety measures and including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 34.02 | Per cubic metre | 3,813.56 | ₹1,29,737.31 |
| - | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm (one hundered milimeter ) dia PVC pipe of working pressure not less than 4kg/sqcm ( four kilogram per square centimeter) extending through the full width of the structures with slope of 1(V) (one vertical) :20(H) ( twenty horizontal) towards drawing face complete as per drawings and MORD technical specification 2014 Clauses 614, 709, 1204.3.7 . The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 20 | Each | 275.42 | ₹5,508.4 |
| - | Back filling with granular material behind retaining walls, abutment wing wall and return wall complete as per drawings and MORD technical specification 2014 Clause 1204.3.8 and as per direction of Engineer-in-Charge including carriage of materials with with in all leads and lifts and other incidental. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 8.82 | Per cubic metre | 1,398.31 | ₹12,333.09 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
sbd2.pdf
Tender Documents • 6.18 MB
BOQ_213478.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .