Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹66.0 L
EMD Value
₹1.3 L
Closing Date
15 Oct 2026, 4:30 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER,M.I.DIV. GUMLA.
EXECUTIVE ENGINEER, M.I.DIV. GUMLA.
Construction of RCC Drain with cover and PCC from Madhuwan Hotel to Palkot Road onside of DSP road under Nagar Parishad, Gumla._G_2
2026_WRD_119680_1
MID/GUMLA/F2-14/2026-27_G_2
Open Tender
Civil Works
Percentage
90 days
GUMLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.3 L
8 Oct 2026
8 Oct 2026
16 Oct 2026
8 Oct 2026
15 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for cleaning the worksite before and after work etc. (unskilled Labour) P-41 | 15 | Each | 326.85 | ₹4,902.75 |
| 2 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
(BCD-5.10.3). | 74.34 | Per M3 | 1,993.04 | ₹1,48,162.59 |
| 3 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
(BCD-5.10.1) | 205.68 | Per M3 | 541.67 | ₹1,11,409.6 |
| 4 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.
(BCD-5.1.1)
Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) (BCD-5.1.2) | 399.32 | Per M3 | 167.33 | ₹66,818.22 |
| 5 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume)
(BCD-5.1.10) | 66.65 | Per M3 | 589.51 | ₹39,293.2 |
| 6 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.
(BCD-5.6.3) | 658.42 | Per M2 | 330.34 | ₹2,17,502.46 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
(BCD-5.3.9.1) | - | Per M3 | 5,218 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
(BCD-5.3.17.1) | 1,635.73 | Per M2 | 194.5 | ₹3,18,149.49 |
| 9 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL)
(BCD-5.5.4) | 11.78 | MT | 83,314.02 | ₹9,81,147.56 |
| 10 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
(BCD-5.5.5) (a) 10mm dia. bar | 11.78 | MT | 82,096.54 | ₹9,66,809.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
DOC2.pdf
Tender Documents • 0.94 MB
BOQ_161940.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .