| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹42.67Accepted-Finance | H-1 | Accepted-Finance Responsive | |
| 2 | H-2₹47.84+₹5.17 (12.1%)Accepted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | H-2 | Accepted-Finance Responsive |
Tender Value
Refer Docs
Closing Date
18 Jun 2024, 5:00 pmClosed
RO,MoRTH,Raipur
RO,MoRTH,Raipur
Preparation of Detailed Project Report for up-gradation Two laning with Paved shoulder of Jashpurnagar to Dumari road NH-143B in the state of Chhattisgarh
2024_MoRTH_801131_1
NIT No. RO/2024/10
Open Tender
Consultancy
Item Rate
365 days
Raipur
As per RFP
9 documents required · 9 mandatory
₹5,590
GM MoRTH
Exempted
RO,MoRTH,Raipur
14 Aug 2024
16 Mar 2024
19 Jun 2024
16 Mar 2024
18 Jun 2024
16 Mar 2024
16 Mar 2024 - 25 Apr 2024
25 Apr 2024
Amount
Item Description
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Grand Total including goods and service tax (for all 3 phases)
** Total Cost Net of Goods & Service Tax shall be considered for financial evaluation Note: No escalation will be payable during the services Insurances shall not be allowed separately. These will be incidental to main items. Rates for all items shall be quoted in figures as well as in words.
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils,Qty. in mtr.
b)Boring in hard rock ,Qty. in mtr.
Sub Total
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and Fixing boundary pillars and its installation , complete in all respect as per IRC:25,1967:Whereve the proposed alignment follows the exissting alignment, the boundary pillars shall be fixed at an interaval of 200m on either side of proposed right of way. Wherever there is a proposal of realignment of the existing Highway and/or construction of new bypass, consutant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval (lumsum)
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Note: The Consultant shall provide one Land Acquisition Expert along with allied team and supporting logistic as envisaged in Clause 5.1.5.1 of TOR for each 100 km stretches proposed for DPR preparation or part thereof (For example total length of package is 343 km, there will be four team).
Description of Work / Item(s)
Amount
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Description of Work / Item(s)
Amount
International Airfares (Fixed costs)
Inland Travel in Home Country (Lump Sum)
Description Lump Sum RATE Name Amount
Airlines
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Name Amount
Miscellaneous expenses
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader Cum Highway Engineer
Bridge Engineer
Highway Engineer
Material-cum-Geo-technical Engineer – Geologist
Survey Engineer
Traffic and Safety expert
Environmental Specialist
Quantity Surveyor / Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Staff 1
Staff 2
Staff 3
Staff 4
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The office shall be located in Pauri Garhwal District and the office rent includes electricity and water charges, maintenance, cleaning, repairs, etc
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
Almondz Global Infra Consultant Limited
Almondz Global Infra Consultant Limited
Almondz Global Infra Consultant Limited
Almondz Global Infra Consultant Limited
PIONEER INRA CONSULTANTS PVT. LTD.
PIONEER INRA CONSULTANTS PVT. LTD.
PIONEER INRA CONSULTANTS PVT. LTD.
PIONEER INRA CONSULTANTS PVT. LTD.
Almondz Global Infra Consultant Limited
PIONEER INRA CONSULTANTS PVT. LTD.
PIONEER INRA CONSULTANTS PVT. LTD.
PIONEER INRA CONSULTANTS PVT. LTD.
Almondz Global Infra Consultant Limited
PIONEER INRA CONSULTANTS PVT. LTD.
PIONEER INRA CONSULTANTS PVT. LTD.
Almondz Global Infra Consultant Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .