| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAccepted-AOC | ₹8.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹8.0 Cr+₹7.9 L (1.00%)Rejected-Finance | ₹8.0 Cr+₹7.9 L (1.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.0 Cr+₹8.7 L (1.09%)Rejected-Finance | ₹8.0 Cr+₹8.7 L (1.09%) | L3 | Rejected-Finance L3 |
| 4 | L4₹8.1 Cr+₹19.7 L (2.47%)Rejected-Finance | ₹8.1 Cr+₹19.7 L (2.47%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | Horizia Construction(india)pvt ltd L2 | M.K. Hansar L4 | PMR Construction Company L3 | M.hassan L1 |
|---|---|---|---|---|---|---|---|
| 1.00Replacing old AC pipes with DI/PVC pipes and laying new ditribution lines - Working Charges | |||||||
| 1.00 | OD220266/2024-2025:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge: Bituminous road | 3,700 | sqm | 98 ₹3,62,600 | 97 ₹3,58,900 | 94.69 ₹3,50,353 | 75 ₹2,77,500 Lowest |
| 1.00 | OD220265/2024-2025:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.
Concrete road | 723 | cum | 853 ₹6,16,719 | 818 ₹5,91,414 | 823.8 ₹5,95,607.4 | 800 ₹5,78,400 Lowest |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 9,804.09 | cum | 614 ₹60,19,714.33 | 576 ₹56,47,158.72 | 593.42 ₹58,17,946.05 | 510 ₹50,00,088.45 Lowest |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 4,524.4 | cum | 906 ₹40,99,110.93 | 850 ₹38,45,744.25 | 875.32 ₹39,60,302.18 | 800 ₹36,19,524 Lowest |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 9,500 | metre | 30 ₹2,85,000 | 25 ₹2,37,500 Lowest | 28.2 ₹2,67,900 | 25 ₹2,37,500 Lowest |
| 1.01 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. | 2,000 | metre | 95 ₹1,90,000 | 93 ₹1,86,000 | 91.27 ₹1,82,540 | 80 ₹1,60,000 Lowest |
| 1.01 | 100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes. | 3,000 | metre | 95 ₹2,85,000 | 93 ₹2,79,000 | 91.27 ₹2,73,810 | 90 ₹2,70,000 Lowest |
| 1.01 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 5,000 | metre | 95 ₹4,75,000 | 93 ₹4,65,000 | 91.27 ₹4,56,350 Lowest | 95 ₹4,75,000 |
| 1.01 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. | 3,000 | metre | 140 ₹4,20,000 | 136 ₹4,08,000 | 134.44 ₹4,03,320 | 120 ₹3,60,000 Lowest |
Tender Value
₹9.2 Cr
EMD Value
₹2 L
Closing Date
14 Jul 2025, 3:00 pmClosed
Superintending Engineer
Kerala Water Authority, PH Circle, Kalmandapam. Palakkad
Pipe Line Replacement Extension of various size pipes and providing 1500 FHTCs, Construction of 2LL OHSR and Sump at Kulappully, 1.50MLD Water Treatment System at Mundaya, Source improvement - PACKAGE III-General Civil Work
2025_KWA_774813_1
2/25-26/SE/PHC/PKD
Open Tender
Civil Works - Water Works
Item Rate
180 days
Shornur
Please refer Tender documents.
14 documents required · 14 mandatory
₹13,010
₹2 L
KWA, PHC, Palakkad
22 Oct 2025
5 Jul 2025
15 Jul 2025
5 Jul 2025
14 Jul 2025
5 Jul 2025
9 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
NIT.pdf
NIT • 15.96 MB
BOQ_1265805.xls
BOQ • 0.38 MB
174939427.pdf
Tender Documents • 0.30 MB
174939429.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .