KEL MAMALA KOCHI
Budget 2023-24 TARUR LAC- Chakkumbaram Manimala Road Construction- Peringottukurissi Grama Panchayath, Palakkad
2025_KEL_748909_1
KRO/BDC/1881/2025
Open Tender
Civil Works - Roads
Item Rate
KEL MAMALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
20 Mar 2025
11 Mar 2025
19 Mar 2025
11 Mar 2025
18 Mar 2025
11 Mar 2025
11 Mar 2025 - 18 Mar 2025
Amount
APPENDIX-A-ROADWORK
2.2.1.B : Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(I) By Manual Means (B)In area of thorny jungle
3.4 : Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
3.15.2 : Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
3.8.1 : Excavation in ordinary Rock by manual means Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3.5.
4.1.A.3 : Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (iii) For Grading III Material
4.9 : Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
6.4 : Construction of un-reinforced dowel jointed at expansion and construction joint only,plain cement concrete pavement ,thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade),coarse and fine aggregates conforming to IS 383,maximum size of coarse aggregate not exceeding 25 mm,mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork(steel channel, laying and fixing of 125 micron thick polythene film, wedges,steel plates including levelling the formwork as per drawing),spreading the concrete with showels,rakes,compacted using needle,screed, and plate vibrators and finished in continuous operation including provision of contraction and expansion ,construction joints,applying debonding strips, primer, sealant, dowel bars, near approaches to bridge /culvert and construction joints, admixtures as approved,curing of concrete slabs for 14 days,using curing compound(where specified) and water finishing to lines and grade as per drawing and Technical Specifications clause 1501
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
APPENDIX-B-PROTECTION WORKS
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6
12.5.1.1 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I.P.C.C grade M 15 (i)Nominal mix (1:2.5:5)
12.8 : Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Granite Name Board
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
GRANULAR SUB BASE: Quantity by level calculation & reporting to CTE as per norms
T. MUHAMMED SADATHALI (BID ID -2160568)
Santhosh kumar KS (BID ID -2161056)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .