| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance 12 B NIKKA SINGH COLONY RAM TIRATH ROAD AMRITSAR PUNJAB | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Documents Short |
| Sl No | Description | Qty | Unit | M/S. GAANESHKARTIKEY CONSTRUCTION PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (MoRT&H no. 12.1 (B)) With Batching Plant, Transit Mixer and Concrete Pump | ||||
| 1.10 | Depth up to 3.00m | 3,151.62 | CUM (Cubic Metre) | 85 ₹2,67,888 Lowest |
| 1.20 | Depth 3.00 m to 6.00 m | 723.33 | CUM (Cubic Metre) | 130 ₹94,033 Lowest |
| 1.30 | Depth above 6.00 m | 392.06 | CUM (Cubic Metre) | 150 ₹58,808 Lowest |
| 2.00 | Running and maintenance of pumping set 8 H.P./ Generator set for dewatering arrangements complete in all respects dewatering for 60 daysX24 | 1,440 | Per Hour Per HP | 80 ₹1,15,200 Lowest |
| 3.00 | Making bore and installation of pumping set for dewatering arrangements complete in all respects. | 450 | RMT (Running Metre) | 600 ₹2,70,000 Lowest |
| 4.00 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) (MoRT&H 12.4) | 106.47 | CUM (Cubic Metre) | 4,000 ₹4,25,880 Lowest |
| 5.00 | Plain/Reinforced cement concrete M-15 in open foundation complete as per drawing and technical specifications/With Batching Plant, Transit Mixer and Concrete Pump (MoRT&H 12.8 A) | 290.81 | CUM (Cubic Metre) | 4,240 ₹12,33,034 Lowest |
| 6.00 | Plain/Reinforced cement concrete M-30 in open foundation complete as per drawing and technical specifications/With Batching Plant, Transit Mixer and Concrete Pump (MoRT&H 12.8 G) | 721.87 | CUM (Cubic Metre) | 5,300 ₹38,25,911 Lowest |
| 7.00 | Supplying, Fitting and Placing intigrated plant marked HYSD bar Fe500 Reinforcement in foundation including cutting,wastage & overlap complete as per Drawing and Technical Specifications clause 1600,1600 & 2200 and 1600 (Sr no 12.4 & 13.6, 14.2) (MoRT&H 12.40) | 60.92 | MT (Per Metric Tonne) | 76,000 ₹46,29,920 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.2 L
Closing Date
18 May 2026, 4:00 pmClosed
Executive Engineer Civil PMB
Amritsar
Reconstruction of RCC Bridge of 5 Span of 8 Mtr each on Ajnala Chogawan Road to Poonga Road at RD 6000 (Under PMGSY-III, Batch-I) Year 2024-25, Distt. Amritsar. Package No. PB01164A
2025_AGRI_141446_5
12 of 2025 (Bridge)
Open Tender
Civil Works - Roads
Item Rate
365 days
Amritsar
Please refer Tender documents.
10 documents required · 10 mandatory
₹20,000
Executive Engineer (C) Punjab Mandi Board
₹6.2 L
Yes
15 Jun 2026
17 Apr 2026
19 May 2026
17 Apr 2026
18 May 2026
17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (MoRT&H no. 12.1 (B)) With Batching Plant, Transit Mixer and Concrete Pump | |||||
| 1.1 | Depth up to 3.00m | - | CUM (Cubic Metre) | - | - |
| 1.2 | Depth 3.00 m to 6.00 m | - | CUM (Cubic Metre) | - | - |
| 1.3 | Depth above 6.00 m | - | CUM (Cubic Metre) | - | - |
| 2Running and maintenance of pumping set 8 H.P./ Generator set for dewatering arrangements complete in all respects dewatering for 60 daysX24 | |||||
| 3Making bore and installation of pumping set for dewatering arrangements complete in all respects. | |||||
| 4PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) (MoRT&H 12.4) | |||||
| 5Plain/Reinforced cement concrete M-15 in open foundation complete as per drawing and technical specifications/With Batching Plant, Transit Mixer and Concrete Pump (MoRT&H 12.8 A) | |||||
| 6Plain/Reinforced cement concrete M-30 in open foundation complete as per drawing and technical specifications/With Batching Plant, Transit Mixer and Concrete Pump (MoRT&H 12.8 G) | |||||
| 7Supplying, Fitting and Placing intigrated plant marked HYSD bar Fe500 Reinforcement in foundation including cutting,wastage & overlap complete as per Drawing and Technical Specifications clause 1600,1600 & 2200 and 1600 (Sr no 12.4 & 13.6, 14.2) (MoRT&H 12.40) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_229525.xls
BOQ • 0.30 MB
Drawings1164A.pdf
Tender Documents • 0.73 MB
SBDPB01164A.pdf
Tender Documents • 1.75 MB
Scan.pdf
PDF • 0.10 MB
Corripmgsy.pdf
PDF • 0.27 MB
corri5bridge.pdf
PDF • 0.28 MB
Blank.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .