Loading…
Loading…
Tender Value
₹11.0 L
EMD Value
₹22,100
Closing Date
14 Jul 2026, 4:00 pm5d left
EE RED
2nd floor vkas bhawan spn
Construction of 240.00 m road/drain and culvert from Captais house to JA Gautam house and Naresh Saxena house to Satyam Coaching in Mohd. VB Haddaf.
2026_REDUP_1161059_11
322 Date 02.06.2026
Open Tender
Consultancy
120 days
shahjahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹22,100
17 Jun 2026
17 Jun 2026
14 Jul 2026
17 Jun 2026
14 Jul 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of old BOE Soling and Stacking of Dismantled Bricks at Site Required for Proper Completion of Work as per new item si No-1 | 621.68 | Sqm | 12 | ₹7,460.16 |
| 2 | E/W in excavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & inside the foundation trenches or into the plinth, removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (PWD SI No. 251) | 0.5 | Cum | 209 | ₹104.5 |
| 3 | Concrete with 4cm gauge brick ballast, fine sand of 1.25 FM and cement in proportion of 12:6:1 in foundation and under floor including supply of all material with mixer machine, labour, and T&P etc. required for proper completion of work. (PWD SI No. 273) | 62.17 | Cum | 3,705 | ₹2,30,339.85 |
| 4 | First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of work. (PWD SI No. 305) | 29.79 | Cum | 5,580 | ₹1,66,228.2 |
| 5 | Cement concrete with 20mm gauge approved stone grit, approved coarse sand and cement in proportion of 4:2:1 including supply of all material, labour, and T&P with mixure machine and vibrator etc. required for proper completion of work. (PWD SI No. 279 i) | 67.12 | Cum | 8,303 | ₹5,57,297.36 |
| 6 | Supply & laying of 125 micron thick polythene sheet as directed by engineer-in-charge including all labour & material for proper completion of work As per Letter No. 10860 Dt. 15.12.2017 | 621.68 | Sqm | 20 | ₹12,433.6 |
| 7 | Making contraction/construction joint in C.C. with cutter & filling joint with Bitumen mixed in 1/3 depth of cc slab & making 10mm wide joint will be 10-12mm depth including cost of all material, labour, T&P etc. required for proper completion of work. ( Rate sanctioned by SE RED Bly.) | 248.67 | RM | 38.5 | ₹9,573.8 |
| 8 | 12mm thick plaster with cement mortar consisting of one part of cement and 4 parts of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc. required for proper completion of work. (PWD SI No. 584 i ) | 69.35 | Sqm | 217 | ₹15,048.95 |
| 9 | M.S. Iron Work in plan work such as reinforced Concreate as P.W.D SI. No 504 | 0.6 | qtl | 8,754 | ₹5,252.4 |
| 10 | r.c.c work in 1:2:4 in cement c/s and s/g as per required all comletion of work as per s.i. no 283 | 0.75 | Cum | 8,900 | ₹6,675 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
322t1.pdf
Tender Documents • 1.33 MB
BOQ_2176335.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid