| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC Lowest Offer | |
| 2 | L2₹4.7 L+₹92,350 (24.7%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹5.3 L+₹1.5 L (40.6%)Rejected-Finance | L3 | Rejected-Finance Not Lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Not Qualified |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
23 Jan 2025, 3:00 pmClosed
General Manager, Projects
PMD Office, TNPL Unit I, Kagithapuram.
Painting of quarters in Housing colony at TNPL Unit I - Phase II in FY 2024-2025
2025_TNPL_518559_1
TNPL/PMD/CIV/UNIT I/242513005498
Open Tender
Civil Works
Tender cum Auction
180 days
TNPL Housing colony, Kagithapuram, Karur district
As per Invitation for Bids of Bid Document
5 documents required · 5 mandatory
₹0
₹10,000
17 Feb 2025
13 Jan 2025
24 Jan 2025
13 Jan 2025
23 Jan 2025
13 Jan 2025
Amount
THROUGHLY CLEANING THE EXISTING PAINTED SURFACES OF WALLS USING BUFFERING MACHINE. SCRAP THE EXISTING PAINTED SURFACE AND DISPOSE THE SAME AS DIRECTED. RATE INCLUDES LABOUR CHARGES AND ALL OTHER INCIDENTIAL CHARGES ETC., COMPLETE AT ALL LEVELS.
ERECTION OF SCAFFOLDING WHEREVER REQUIRED AND CLEANING THE SURFACES AND APPLICATION OF ONE COAT OF WHITE WASH USING JANATHACEM OR EQUIVALENT QUALITY OVER THE NEW / EXISTING SURFACES INCLUDING COST OF ALL MATERIALS AND OTHER LABOUR, INCIDENTAL CHARGES ETC. COMPLETE AT ALL LEVELS.
THOROUGHLY PREPARE THE SURFACES AND APPLYING ONE COAT OF OIL BOUD DISTEMPER INCLUDING COST OF MATERIAL, LABOUR, CONSUMABLES LIKE BRUSH, ETC., COMPLETE AT ALL LEVELS.
PREPARE SURFACES AND ERECTION OF SCAFFOLDING WHEREVER REQUIRED AND CLEANING THE SURFACES AND APPLICATION OF ONE COAT OF ACRYLIC EMULSION PAINT OF APPROVED MAKE OVER THE EXISTING SURFACE INCLUDING COST OF ALL MATERIALS AND OTHER LABOUR, INCIDENTAL CHARGES ETC., COMPLETE AT ALL LEVELS.
PREPARING THE SURFACES AND APPLYING ONE COAT OF ENAMEL PAINT INCLUDING COST OF MATERIAL, LABOUR, CONSUMABLES LIKE BRUSH, ETC. COMPLETE
THOROUGHLY PREPARE THE SURFACES AND APPLYING TWO COATS OF OIL BOUND DISTEMPER (SHALIMAR OR EQUIVALENT) OVER ONE COAT OF PRIMER INCLUDING COST OF MATERIAL, LABOUR, CONSUMABLES LIKE BRUSH,ETC., COMPLETE
THROUGHLY PREPARE THE SURFACES AND APPLY ONE COAT OF WALL PRIMER OF APPROVED MAKE OVER WALL PUTTY SURFACES AND APPLY TWO COATS OF ACRYLIC EMULSION IST QUALITY OF APPROVED COLOUR AND MAKE INCLUDING MATERIAL COST AND ALL CONSUMABLES LABOUR CHARGES, SCAFFOLDING ETC. COMPLETE AT ALL LEVELS.
SUPPLY AND APPLICATION OF TWO COATS OF SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WALL (CEMENT) PRIMER INCLUDING SURFACE PREPERATION, NECESSARY SCAFFOLDING WHEREVER REQUIRED, ETC., AS DIRECTED. COMPLETE AT ALL LEVELS
Bidder Name
Amount in Words
YUGA & JANA CONSTRUCTIONS (BID ID -1236782)
N ASOKAN PAINTING CONTRACTOR (BID ID -1237019)
M.S.ENTERPRISES (BID ID -1237220)
M.S.ENTERPRISES (BID ID -1237220)
YUGA & JANA CONSTRUCTIONS (BID ID -1236782)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .