Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹4.8 LAccepted-AOC 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | LI | Accepted-AOC LOWEST | |
| 2 | L2₹4.8 LRejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L2 | Rejected-Finance GREATER THAN L1 | |
| 3 | L3₹4.8 LRejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance GREATER THAN L1 |
Tender Value
₹4.9 L
EMD Value
₹9,858
Closing Date
8 Jul 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE,SMSD,PHE DTE
OFFICE OF THE ASSISTANT ENGINEER ,SILIGURI MECHANICAL SUB DIVISION ,PHE Dte.SILIGURI
Withdrawing and repairing of VT Pump No 1,2 and 3 along with reinstallation of the same at Fulbari Intake Pumping Station under Siliguri Comprehensive Water Supply Scheme.
2024_PHED_698895_1
WBPHED/AE/SMSD/NIeT- 01 OF 2024-2025
Open Tender
MECHANICAL
Item Rate
20 days
Siliguri
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,858
Yes
21 Feb 2025
25 Jun 2024
10 Jul 2024
25 Jun 2024
8 Jul 2024
25 Jun 2024
Amount
Mobilization of expert manpower ,tools and tackles for fault finding of VT pumpf rom Kolkata.
Supply & delivery of following items:-
a) Basket Strainer. MOC GI
b) Gasket Champion universal high temperature/pressure sheet of 0.5mm size metallic type. ( 3 mtr. X 3 mtr.)
c) Pacseal Teflon type graphite Aramid Gland Packing 12 mm.
d) Servo Prime Mobile 20w 40.
Withdrawing of existing age old vertical turbine Pump of model no. E24TC of WPIL make from the sump well after dismantling from thrust bearing assembly and decoupling of 75KW vertically Mounted induction Motor with all allied power cables and complete column pipe and shaft assembly part by part as per direction of EIC.
Dismantling of Bowl assembly part by part for taking out the packed garbage with waste materials and reassembling of the same part by part as per instruction of EIC.
Installation of Vertical Turbine Pump with the existing column pipe and shaft assembly with necessary alignment with thrust bearing and existing electrically driven prime mover for achieving minimum eccentricity and subsequent list vibration for achieving highest level of performance of the entire assembly as per direction and entire satisfaction of EIC.
Make As per PHE approved vendor list.
Add GST @18%
WEST BENGAL ENGINEERING CO.
ORIENTAL ENGINEERING CO.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .