Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹3.9 LAccepted-Finance | 1st | Accepted-Finance accept | |
| 2 | 2nd₹4.1 L+₹25,895 (6.70%)Rejected-Finance | 2nd | Rejected-Finance refund |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
22 Sept 2026, 11:00 amClosed
EE Dharampur
HPPWD Dharampur
C/O B/Wall in Wire Crate at RD 3/700 to 3/718 and C/O R/Wall in wire crate at RD 3/700 to 3/710 ) PDNA 2025
2026_PWD_143440_5
PW-DPD-Tender-2026-27-12484-86 dt. 10/09/2026
Open Tender
Civil Works - Roads
Percentage
Dharampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹8,000
8 Oct 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area in all kinds and classification of soil including cutting and trimming of side slopes disposing of excavated earth with carriage of material in all leads and lifts as per Techanical Specification clause 1603.1 disposal of all surplus earth to dumping site as per direction of Engineer-in-charge and carriage of material within all leads and lifts and other incidentals The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 30.96 | Per cubic metre | 250 | ₹7,740 |
| 2 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and technical specification clause 305.1 and as per direction of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm (One hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in-Charge and carriage of material within all leads and lifts and other incidentals The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 29.7 | Per cubic metre | 350 | ₹10,395 |
| 3 | Providing and laying boulder apron laid in wire crate with 4 mm dia wire confirming to IS 280 and 4826 in 100x100 mm mesh (Woven diagonally) including 10% extra for laps and joints laid with stone boulder weighing not less than 25 Kg each as per drawing and technical specification including carriage of materials with in all leads and lifts and direction of Engineer in Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 117 | Per Cubic Metre | 3,250 | ₹3,80,250 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.34 MB
BOQ_213203.xls
BOQ • 0.24 MB
5.docx
Tender Documents • 15.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .