Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC L1 Party | |
| 2 | L2₹8.4 L+₹37,205.68 (4.63%)Rejected-Finance | L2 | Rejected-Finance L2 Party | |
| 3 | L3₹11.0 L+₹2.9 L (36.7%)Rejected-AOC | L3 | Rejected-AOC L2 Party |
| Sl No | Description | Qty | Unit | U. AZEEZKUNJU L2 | P V CONSTRUCTIONS L3 | PRASAD PILLAI L1 |
|---|---|---|---|---|---|---|
| 1.00RCC demolition | ||||||
| 1.01 | Demolishing R.C.C. work manually / by mechanical means including stacking of
steel bars and disposal of unserviceable material with in 50 metres lead as per
direction of Engineer -in-Charge. | 1 | cum | 3,000 ₹3,000 Lowest | 4,600 ₹4,600 | 3,500 ₹3,500 |
| 2.00Brick demolition | ||||||
| 2.01 | Demolishing brick work manually / by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead as
per direction of Engineer-in-Charge.In cement mortar | 1 | cum | 2,500 ₹2,500 | 2,900 ₹2,900 | 2,000 ₹2,000 Lowest |
| 3.00PCC work | ||||||
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4
coarse sand : 8 graded stone aggregate 40 nominal size) | 1.17 | cum | 9,000 ₹10,494 | 9,590 ₹11,181.94 | 8,000 ₹9,328 Lowest |
| 4.00RCC WORK | ||||||
| 4.01 | Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size | 3 | cum | 13,000 ₹39,000 | 12,400 ₹37,200 | 12,000 ₹36,000 Lowest |
| 5.00Centering and Shuttering | ||||||
| 5.01 | Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | 29.53 | sqm | 450 ₹13,288.5 | 650 ₹19,194.5 | 350 ₹10,335.5 Lowest |
Tender Value
₹8.9 L
EMD Value
₹22,150
Closing Date
7 Jul 2025, 3:00 pmClosed
HOU(TP)
KMML, Chavara
RCC and brick demolishion, PCC and RCC work, GI steel structural work, Cememt board partition, Aluminium fabrication works-doors, Interlock laying, Painting.
2025_KMML_768774_1
EAF/CIV/0133/25-26,Dtd31/05/25
Open Tender
Civil Works - Others
Item Rate
90 days
KMML, Chavara
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,100
₹22,150
30 Oct 2025
18 Jun 2025
8 Jul 2025
18 Jun 2025
7 Jul 2025
18 Jun 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .