Loading…
Loading…
Tender Value
₹57.1 L
EMD Value
₹57,100
Closing Date
21 Sept 2026, 6:00 pmClosed
Additional City Engineer (I/C)
Comprehensive Operation & Maintenance work for 02 Year of Bajarangwadi Sewage Pumping Station.
340157
WMU/DRN-WZ/O&M/SPS/BAJARANGWADI/2026-27/01
Open
Repair and Maintenance
Works
Rajkot
17 documents required · 16 mandatory · 1 optional
₹3,000
Rajkot Municipal Corporation
₹57,100
1 Sept 2026
1 Sept 2026
1 Sept 2026
21 Sept 2026
1 Sept 2026
General conditions of contract & e-TENDER TECHNICAL BID
Name Of Work: Comprehensive Operation & Maintenance work for
Year of Bajarangwadi Sewage Pumping Station.
Milestone dates for e-tendering is as under
1. Downloading of e-Tender documents Dt. 01-09-2026 to Dt. 21-09-2026 up to
2. Online submission of e – Tender (tech. bid ) Dt. 21-09-2026 up to 18:00 hrs
3. Physical submission of EMD, e-Tender fee Dt. 30-09-2026 up to 18:00 hrs
and other documents.(Speed post Only)
4. Verification of submitted documents (EMD, Dt. 01-10-2026 (If possible)
e - Tender fee, etc.)
5. Opening of online tender (tech.bid) Dt. 01-10-2026 (If possible)
6. Opening of Price Bid (if possible) Dt. 05-10-2026 (If possible)
7. Bid Validity 120 days.
For further particulars, visit us on (1) https://rmctender.nprocure.com (2) www.rmc.gov.in
Add. City Engineer
Drainage–Project, Bedi Naka, Nr. Keshar E Hind
Bridge, Central Zone, Rajkot Municipal
TABLE OF CONTENTS:-
Sr.No. Section Title
1. - E-TENDER NOTICE
2. - TENDER DECLARATION FORM
3. Section A Introduction
4. Section B Important Provisions
5. Section C General instruction for the tenderers
6. Section D Special instruction to Tenderer
7. Section E Financial & Technical (Qualification) Criteria with
8. Section F Condition of Contract & Schedule of Guarantee
9. Section G Special Terms & Condition
10. Section H Technical Specification & Scope of Services
11. Section I Technical Details of Pumping Station
12. Section J Special Condition & Safety Instructions For Wet
Well De-Silting Work
13. Section K Penalty provisions, ADDITIONAL SCOPE OF
WORK, GENERAL ROUTINE MAINTENANCE,
PREVENTIVE MAINTENANCE CHECKS, MINOR
REPAIR GENERALLY ENCOUNTERED IN THE
Pumping Station
Rajkot Municipal Corporation
Water O&M Cell(Drainage)
e-Tender Notice
Rajkot Municipal Corporation Water O&M Cell(Drainage), Office of the Dy. Exe. Engineer,
Drainage-Project (Ele./Mech.) Branch Nr. Keshar E Hind Bridge, Nr. Bedinaka Tower,RAJKOT –
360001 invites E-Tender with two bid system (Technical & Price bid) by e-tendering from
the reputed and experienced contractors working with GWSSB/ State Government/ Central
Government/ULB..etc. in appropriate category Comprehensive Operation & Maintenance
of Water/Sewage pumping station for the the below mention work.
Estimated cost A) EMD as per
Sr Name of work (without GST) B) E-TENDER fee
No C) Tenure of work
Year In Rupees D) Tender Validity
1 “Comprehensive Operation & st
Maintenance work for 02 Year of B) Rs. 3000/-
Bajarangwadi Drainage Pumping
Total D) 120 Days
Station.” 57,09,299/-
Milestone dates for e-tendering is as under
1. Downloading of e-Tender documents Dt. 01-09-2026 to Dt. 21-09-2026 up to
2. Online submission of e – Tender (tech. bid ) Dt. 21-09-2026 up to 18:00 hrs
3. Physical submission of EMD, e-Tender fee Dt. 30-09-2026 up to 18:00 hrs
and other documents.(Speed post Only)
4. Verification of submitted documents (EMD, Dt. 01-10-2026 (If possible)
e - Tender fee, etc.)
5. Opening of online tender (tech.bid) Dt. 01-10-2026 (If possible)
6. Opening of Price Bid (if possible) Dt. 05-10-2026 (If possible)
7. Bid Validity 120 days.
For further particulars, visit us on (1) https://rmctender.nprocure.com (2) www.rmc.gov.in
Pre-Qualification Criteria:
A) Financial Criteria:
1. The bidder must have achieved a minimum annual turnover in any one year over
the last seven financial years (i.e. 2025-26 to 2019-20) of the annual value of
contract applied for. (i.e.,Rs.28,54,650/-) (Rajkot Municipal Corporation’s
Enhancement Factor can be applicable.
2. The bidder has liquid assets (aggregate of Working capital, cash in hand and
uncommitted bank guarantees) and/or credit facility equal to 25% of the contract
value. (i.e. Rs.14,27,325/-)
3. Available Bid Capacity-ABC must be more than the tender amount.
ABC is calculated as ABC=2*A*N-B
A = max. value of works executed in any one year during the last seven years (updated
to…….* price level) taking into account the completed as well as work in progress.
N=Number of years prescribed for completion of the works which tender are invited.
B = Value (*price level) of exiting commitments and on-going work to be completed
during that next N year (period of completion of the works for which the tenders are
Note on pre-qualification requirement:
4. Enhancement factor at 10% per year for last seven years will be applicable to
arrive at average annual turnover and experience to finalize the magnitude of
work done in last seven years.
Sr. Year Enhance
1 Year of inviting tender (2026-27)
For Financial and Experience criteria, the estimated cost of Rs. 28,54,650/- will be
5. Bidder has to quote their rates without GST and including other taxes. The invoice
should be submitted by contractor showing the breakup of GST in the bill. GST will be
paid extra at the prevailing rate at the time of execution.
B) Experience Criteria:
1. The bidder has successfully completing or substantially completing at least one
contract of similar nature of work at least 40% of the value of proposed contract
within the last seven years. (i.e. Rs. 11,41,860/-)
2. Substantially completed works means those works which are at least 90% completed
as on the date of submission (i.e. gross value of done up to the last date of
submission is 90% or more of the original contract price.) and continuing satisfactorily.
Experience certificate of competent authorities required to be submitted like 3(A)
CERTIFICATE will be considered as experience certificate.
Note:- Experience as a contractor of similar nature of work (similar nature means -
comprehensive operation and maintenance service like Water Pumping Station, STP,
Drainage Pumping Station, Water Treatment Plant in any State Government / Central
Government /ULB)
CHECKLIST FOR SUBMISSION OF DOCUMENTS (ONLINE AND OFFLINE)
The bidder must submit the relevant documents as per below:
Sr Document Name ONLINE OFFLINE
1 Tender Fee DD
3 Current Registration in “D” Class or Above (R & B) with of any State
Government / Central Government authority/ULB
4 Tender Documents (Technical bid, Price Bid and Corrigendum with
sign and stamp)
5 Valid Electrical Contractor License
6 GST Registration
8 PF Registration
9 ESIC Registration
10 Non-Blacklist Declaration on Rs.300 Stamp
11 Turnover Certificate from CA
12 Work Experience Certificates (3A only)
13 Professional Tax Details -Enrollment certificate (Firm) and
Registration certificate (Employee)
14 Working Capital Certificate From C.A.
15 Available Bid Capacity Certificate From C.A
16 Sites visit & fully aware with nature of work confirmation letter
Note: The bidder must submit all relevant documents as per qualification criteria and
tender conditions. No correspondence to the agency will be done for shortfall documents.
Original documents to be brought by bidder/authorized person for verification on
the date and time as communicated by engineer-in-charge, if any and other
supportive documents as required in this tender, duly stamped & signed on all pages.
The EMD of Rs. 57,100/- as well as e-tender fee (non-refundable) of Rs.3000/-
are paid via Demand draft in favor of “Rajkot Municipal Corporation”, Rajkot, from any
Nationalized Bank or as per Finance Department, GR No.-FD/MSM/e-
file/4/2025/2712/DMO,Dt.01/04/2026 and Physical Documents mention in table must
be delivered within seven days from the last day of submission of bid on address below
by Speed Post only:
Deputy Exe. Engineer Drainage–Project,
Bedi Naka Tower, Nr. Keshar E Hind Bridge,
Rajkot Municipal Corporation, RAJKOT-360001
The bidder also can pay EMD and Tender fee by NEFT/RTGS or Online Transfer. the
payment receipt needs to be uploaded online along with the required tender documents,
eliminating the need for physical submission.
RMC BANK ACCOUNT DETAILS
A/C No.: 925020032594580 Bank Name: Axis Bank
IFS Code: UTIB0000631 Branch: Shashtri Medan
Terms & Conditions:
1. Tenderer has to submit tender documents online at https://rmctender.nprocure.comand
Submit Hard copy of above documents mention offline in table are only on address given
above by Speed Post only.
2. Conditional tender are liable to be rejected.
3. Joint venture or MOU is not permitted.
4. The bidder should provide accurate information on any litigation history or arbitration
resulting from contracts completed or under execution by him over the last ten years. This
should also include such cases, which are in process/progress. A consistent history of
awards against the bidder may result in failure of the bid. In case the bidder has not
provided such information and has come to the notice of the authority, the tender will
be rejected at what so ever stage and in such case all the losses that will arise out of this
issue will be recovered from the tenderer/bidder and he will not have any defense for the
5. Enhancement factor at 10% per year for last seven years will be applicable to arrive average
annual turnover and finalize the magnitude of work done in last seven years.
6. The Bidder / firm must have current Registration in “D” Class or Above (R & B) with of any
State Government / Central Government authority.
7. The agency should not be Black Listed/Debar/Terminated anywhere in India, for which, agency
will have to submit fresh Notarized Affidavit on Rs.300/- judicial stamp paper.
8. Sites visit & fully aware with nature of work confirmation letter
9. Power of Attorney authorizing the person for signing the Tender and give any clarification
asked by department.
10. The agency shall also have to submit the documentary evidence for possessing the Current
Electrical Contractor License in Electrical Department of Government.
11. The contractor shall have to purchase the material required for this tender work, only from the
supplier having registered GST Number. RMC will not be responsible to pay any amount
towards GST if the material is purchased from the unregistered supplier / not having GST
12. Also, the details of works on hand and works completed shall have to be mentioned in the
Annexure-II of Technical Bid (Volume-I).
13. The successful bidder shall have to pay security deposit amounting to 5% of Contract Value in
favor of "Rajkot Municipal Corporation" in terms of Fixed Deposit Receipt of Nationalized Bank
or as per Finance Department, GR No.-FD/MSM/e- file/4/2025/2712/D.M.O., Dt.01/04/2026
valid for the period of 30 Months.
14. If the contract price offered by the selected bidder is lower than 10% but up to 20% of the
Estimated project Cost than the additional performance security shall be calculated @20% of
the difference in the Estimated Project Cost minus 10% of the Estimated Project Cost and
Contract Price offered by the selected Bidder.
15. If the contract price offered by the selected bidder is lower than 20% of the Estimated project
Cost than the additional performance security shall be calculated @30% of the difference in
the Estimated Project Cost minus 10% of the Estimated Project Cost and Contract Price offered
by the selected Bidder.
16. The Additional Performance Security shall be treated as part of the Performance Security. The
Performance Security shall be valid beyond 60 days of the defect liability period and the
additional Performance Security shall be valid beyond 28 days of Project completion Date.
17. The Tender of those bidder(s) those who fails to submit the required documents physically
within the stipulated date and time, will be treated as non-responsive and their Price Bid will
18. After opening of Technical Bid, the procedure for the pre-qualification shall be adopted and
the Price Bid of only successful qualified bidder shall be opened for final evaluation of the
contract. The decision of Municipal Commissioner regarding the pre-qualification shall be final
and binding to all the bidders.
19. After opening of the Technical Bid, if the agency is disqualified for this work and under such
circumstances if the agency tries to pressurize the Evaluation Committee through any means
then the offer of such bidder will be treated non-responsive and liable to be rejected out
rightly without assigning any reason thereof.
20. Enter into an agreement on stamp paper as per prevailing norms. It shall be incumbent on the
Contractor to pay the stamp duty and the legal charges for the preparation of the contract
21. The Jurisdiction will be Rajkot City only.
22. Commissioner, Rajkot Municipal Corporation, Rajkot, reserves the right to accept / reject any
or all e-Tender(s) without assigning any reasons thereof.
Add. City Engineer
Water Management Unit
Rajkot Municipal Corporation
TENDER DECLARATION FORM
Add. City Engineer
(W.M.U.), Rajkot
Municipal Corporation,
Name of Work : Comprehensive Operation & Maintenance work for 02 Year
of Bajarangwadi Sewage Pumping Station..
I/We the undersigned have carefully gone through and clearly understood the Tender
documents comprising Notice Inviting Tender, Articles of Agreement, Scope of work,
Definition of Terms, Instructions to Tenderer, Conditions of Contract, Special Conditions of
Contract, Appendixes, Specifications, Schedule of Quantities and Drawings furnished by
RAJKOT MUNICIPAL CORPORATION, RAJKOT. I/We have satisfied myself / ourselves as to
the location of site, the existing condition of structure and examined drawings.
I/We do hereby offer to execute and complete the whole of the work within the time
specified all in accordance with the specifications, designs, drawings and instructions in
writing referred to in the said documents and with such materials as are provided for at
the respective rates which I/We have quoted in the Schedule of Quantities, or at such
other rates as may be fixed under the provisions of these conditions, as turnkey basis
including supplying, design, drawings and testing etc.
In the event of this tender being accepted, I/We agree to enter into an agreement
as and when required and execute the contract, according to your Form of Agreement or
in default where of I/We bind myself / ourselves to forfeit the Earnest Money Deposit.
I/We understand that if I/We shall enter in agreement within ten days from the date
of receipt of Letter of Acceptance, you will forfeit the Earnest Money paid by me/us and
take necessary action as deemed fit.
CONTRACTOR Competent Authority
I/We have enclosed a Draft as an "Earnest Money Deposit" for the sum of Rs.57,100/- the full
value of which is to the absolutely forfeited to the Employer should I/We fail to commence the
works specified. Otherwise the said sum shall be retained, by the Employer, as on account of
such Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in
accordance with conditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest of any tender, which you
may receive. I/We understand that all the pages of the Tender documents are to be
signed by me / us.
I/We shall refer all disputes arising out of or relating to the agreement, final decision
of Municipal Commissioner bound to me.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
of opening of technical bid the tender.
Yours faithfully,
Signature of the
Signature and seal of the Contractor
RAJKOT MUNICIPAL CORPORATION
Introductory Note
RMC is the implementing agency for Underground Drainage Project of Rajkot city. The
project is already implemented. The Comprehensive operation and maintenance
responsibility of the executed works is also rested with RMC.
For technical and proper operation and maintenance of the Pumping Station RMC
intent to engage experienced and resourceful agencies. The scope of agencies for
package will be to operate, maintain, repair shall the asset secreted by RMC, for the
period of 2 years and the same could be extended by mutual understanding. The tenders
have been asked on turnkey basis where in contractors shall have to provide all the staff
required for the comprehensive operation and maintenance as well as equipment, vehicles,
Consumables etc. RMC will supply raw sewage and Electrical power as well as Diesel for
power generator set only. Oils, Grease, coolant, Kerosine, required for pumping or any other
required consumable shall be in the scope of contractor & its required quantity stock shall
be maintained by contractor at his own cost.
The e-tenders have been invited with two bid system i.e. the technical bid and
the Price bid. The technical bid will be opened first and the Price bid of responsive
offer will be opened at later stage.
Authorized Signature with seal of Bidder.
IMPORTANT PROVISIONS
1. Name of work :
Compr,ehensive Operation & Maintenance
work for 02 Year of Bajarangwadi Sewage
Pumping Station
2. Amount of Earnest The Bid Security will be Rs.57,100/-. The Bid
Money Deposit : Security either to be submitted along with the
Bid- Document, in form of D.D.of any
Nationalized Bank or as per Finance Department,
GR No.- FD/MSM/e- file/4/2025/2712/D.M.O.,
Dt.01/04/2026 having Branch office in Rajkot. or
directly deposited in :
“Rajkot Municipal Corporation”
Axis Bank Account No.
Branch : Shashtri Medan
IFSC Code : UTIB0000631
3. Amount of Performance Security Deposit The Performance Security deposit shall have
to be submitted with in 10(Ten) Days of
intimation of work award @ 5% of contract
value or tender estimated value whichever
is higher in form of FDR of any Nationalized
Bank or as per Finance Department,
GR No.- FD/MSM/e-
having Branch office in Rajkot.
4. Time of Comprehensive Operation & Maintenance 24 months from the date of work order.
5. Validity of Tender : 120 days from date of opening of Technical
Authorized Signature with seal of Bidder.
GENERAL INSTRUCTIONS FOR THE TENDERERS
e-Tenders under two bid system are invited on behalf of the Rajkot Municipal Corporation, Rajkot,
Gujarat for the works mentioned in the scope of work below. How ever no tender will be considered
for only part of the items within a schedule or for any lesser quantity of an item than that specified.
2. WORK SCHEDULE
All tenderers are cautioned that e-tenders containing any deviation from the contractual terms and
conditions, specifications or other requirements may be rejected as non- responsive.
Contractors will be pre qualified after opening and evaluating the pre qualification bids as mentioned
in the notice inviting tender, Price bid of only such pre qualified tenderers will be opened for
evaluation of price and further decision of accepting the tender will be taken.
3. PHYSICAL SUBMISSION OF DOCUMENTS :
Required Documents should be submitted physically to :
Dy. Exe. Engineer Office,
Drainage-Project (Ele./Mech.) Branch
Nr. Keshar E Hind Bridge,
Nr. Bedinaka Tower,
Rajkot Municipal Corporation, RAJKOT –
DOWNLOADING OF E-TENDER DOCUMENTS AT (https://rmctender.nprocure.com)
: The tender document shall comprises the following :
VOLUME- I PRE QUALIFICATION BID &TECHNICAL BID
I. Notice inviting tender
A) Introduction
B) Important provision of tender
C) General Instructions to tenderer
D) Special Instructions to tenderer
E) Financial & Technical (Qualification) Criteria with Formats
F) Conditions of Contract for Operation & Maintenance &
Schedule of Guarantees
G) Special Terms and Conditions
H) Technical Specifications and scope of services and Annexures
VOLUME-II : PRICEBID
I) Memorandum Of Works In Brief
4 LANGUAGE OF TENDER :
e-Tender shall be submitted in the prescribed form in English. All literature and correspondence in
connection with tender shall be in English or in Gujarati.
5. SUBMISSION OF TENDER :
Tenderers should go through all instructions eligibility criteria and specification in tendering
documents carefully, visit and inspect site and submit tenders accordingly. RMC shall presume that
the tenderer who submits his tender has properly understood the tender and is fully aware of
the site conditions.
6. WHOM TO CONTACT:
The following officers may be contacted for any further information on the tender.
Shri K.L.Joshi (Mo: 9723555216)
Dy. Exe. Engineer,Drainage-Project
(Ele./Mech.)Branch Nr. Keshar E Hind Bridge,
Nr. Bedinaka Tower,RAJKOT –
7. METHOD OF TENDERING:
If an individual submits the tender the individual with his full name and current address shall sign it.
If the tender is submitted by a Proprietary concern, it shall be signed by the Proprietor with his
full name and the full name of his firm with its current address.
If the tender is submitted by a partnership firm, it shall be signed by all Partners of the firm with
their full name and current address, or by a partner holding the Power of attorney. The partnership deed
of the firm and a certified copy of power of attorney shall accompany the tender.
A certified copy of the Partnership Deed, Current Address of the firm and the full names and the current
address of all the Partners of the firms shall also accompany the tender.
If the tender is submitted by a limited company or a limited corporation the tender shall be
signed by an authorized signatory having such power of attorney to sign on behalf of the company or
corporation and in which case a Certified copy of the Power of Attorney with evidence of its currency
shall accompany the tender. Such limited company or Corporation may be required to furnish
satisfactory evidence of its existence before the contract is awarded.
All witnesses and sureties shall be persons of status and probity and their full names, occupation and
addresses shall be stated below their signatures.
All signatures in the tender document shall be dated.
1. Tenderers must submit tender’s detailed Statements of facts as to :
i) Financial, Business and Technical organization in attached form.
ii) Capabilities with respect to personnel, equipment, plant Licenses / Certificate sand past
performance as per attached form.
8. PREPARATION OF TENDERS:
Tenderer must submit :
a) Tender shall be considered only if accompanied by full information as required
under this tender.
b) The tender will not be considered if complete information as called for in this tender is not
given, or if particulars asked for in the Annexure of the Tender form are not fully furnished.
c) The tenderer must sign the tender pages at bottom of each page unless otherwise specified.
d) Any tender containing vague and indefinite expressions, which are against the terms and
conditions laid down by RMC, will be considered as non- responsive.
e) Tenderer shall physically submitted in stipulated time as mentioned in NIT with certified
copies of all necessary documents.
f) Tenderers are requested to furnish all the technical data, description literature, leaflet
and supplementary description and relevant specification, in English Wherever required, the
tenderers, to supplement may furnish additional information and data, amplify or clarify the
information required in the specification.
g) The tenders shall indicate in a summary form :
1. Accessories/fitments which are standard with the equipment which though not
specified in the tender are included in the scope of supply and are included in tender
2. Accessories/fitments which may occasionally or frequently be required, but have
been specifically excluded by the tenderers from the scope of supply and which are
not included in tender price.
h) No page should be removed from the tender documents.
9. SUFFICIENCY OF TENDERS:
The tenderer shall be entirely responsible for the sufficiency of the rates quoted by him in this tender.
Conditional tender will be out rightly rejected.
10. STATING OF RATES:
The total tender price shall be quoted both in words and in figures at online e-tender only.
11. STAMP DUTY CHARGES:
Stamp Duty charges, if applicable, as per prevailing rates shall be borne by the Contractor. The
contract agreement will be executed on non-judicial stamp paper of appropriate amount.
12. ADDENDA AND CORRIGENDUM:
Addenda and corrigendum will form, a part of the contract documents, and full consideration shall be
given to all addenda and corrigenda in the preparation of tenders.
Tenderers shall verify the number of addendum and corrigendum issued. if any and acknowledge the
receipt of all addendum and corrigendum to the Engineer and failure to do so may cause the tender to
The owner or the Engineer may issue. Addendum /corrigendum and advise tenderers of the changed,
requirements such addendum/ corrigendum may modify previously issued addendum and
All addendum, corrigendum issued by RMC shall be a part of the contract.
Information relating to the examination, clarification, evaluation and comparison of bids, and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has been
announced. Any effort by a bidder to influence the Employer’s processing of bids or award decisions
may result in the rejection of the bidder’s bid.
14. CLARIFICATION OF BIDS
To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for clarification of bid, including breakdowns of unit rates. The request for clarification
and the response shall be in writing but no change in the price or substance of the bid shall be sought,
offered, or permitted
15. EXAMINATION OF BIDS AND DETERMINATION OF RESPONSIVENESS
Prior to the detailed evaluation of bids, the Employer will determine whether each bid meets the
eligibility criteria (b) has been properly signed (c) is accompanied by the required securities (d) is
substantially responsive to the requirements of the bidding documents and (e) provides any
clarification and/or substantiation that the Employer may require to determine responsiveness
A substantially responsive bid is one that conforms to all the terms, conditions, and specifications of the
bidding documents without material deviation or reservation. A material deviation or reservation is one
(a) which affects in any substantial way the scope, quality, or performance of the Works (b) which limits
in any substantial way, inconsistent with the bidding documents, the Employer’s rights or the bidder’s
obligations under the contract or (c) whose rectification would affect unfairly the competitive position
of other bidders presenting substantially responsive bids.
If a bid is not substantially responsive, it will be rejected by the Employer, and can’t subsequently be
made responsive by correction or withdrawal of the non- conforming deviation or reservation.
Tenderer is requested to follow all above instructions. Deviation in any one of them may cause
rejection of tender.
Authorized Signature with seal of Bidder.
Adi. Asst. Engineer Dy.Ex.Engineer Add. City Engineer
SPECIAL INSTRUCTIONS TO THE TENDERERS.
1. The intending tenderer should visit the site, examine the site details, including geological and geo
hydrological conditions and verify the technical details given in the tender collect additional or
supplementary data as may be required and formulate their offer accordingly.
2. Intending tenderers can obtain Technical clarification relating to the work and the
Tender Document by asking on phone No. (DEE-Ele.-Mo: 97235 55216)
All Tenderers are cautioned that tenders containing any deviation from the contractual terms and
conditions, specifications or other requirements will be treated as non-responsive and rejected
Conditional tenders shall be treated as non-responsive and rejected out rightly.
Contractors will have to quote for the entire work and all items mentioned in the schedules
containing bill of quantities and scope of work. Alternative offer is not acceptable and such offers will
be considered non-responsive and out rightly rejected.
3. Contractors should invariably give elaborate and correct information in Schedules enclosed with this
Post qualification Bid. They should also give whatever additional information in support of their claim
for qualifying them as technically competent and financially sound agency to carry out the work under
this contract and for evaluation of Post qualification Bid and selection of contractors for opening of the
Technical Bid shall be opened by City Engineer, Rajkot Municipal Corporation at Rajkot as per the
prescribed date and time. After opening the Technical Bid, the procedure of pre-qualification will be
adopted and Price Bid of only such Pre qualified contractors will be opened.
CRITERIA FOR PRE QUALIFICATION
Tenderers who have submitted the tenders will be evaluated for pre-qualification on the basis of
information supplied by them in Performa provided in this volume of the tender and on the basis of
any additional information they may have submitted with the tender.
Pre-qualification will be based on assessing the contractor's ability to carry out the M&R work of
the projects put to tender, and within the stipulated time. The weightage of different
criteria is given in this bid.
The factors affecting the contractor’s pre-qualification will be the contractor’s experience of carrying
out similar works, his financial soundness, equipment and personnel available with him and which he
intends to spare for the project put to tender quality of works carried out and performance of similar
works carried out by him in the past.
5 The contractor should invariably give a brief note on their methodology and work plan for operation
and maintenance of the work. This should include:
a) Plan for deployment of machinery
b) Quantity planning.
c) Details of manpower
The total tendered cost including prices for all materials and staff will be firm and fixed. No
escalation/variation shall be allowed under any circumstances.
6 Physical submission of e-Tenders arriving later than prescribed date and time shall not be accepted.
7. Pre-qualification details and Price-bid should be filled online and required documents shall have to
be submitted in electronic format through Online by scanning and physically in separate cover.
8. Tenderers who are partnership firms should attach certified copy of partnership deed. Tenderers who
are limited companies should enclose the certified copies of the certificate of incorporation,
Memorandum and Articles of association and Resolution of company authorizing the person who shall
sign and submit the tender documents.
9. RMC reserves right to allot all the works for O&M work to the lowest tenderer or any of the tenderers
at the approved rate.
10. No part of this contract or any share or interest therein shall be in any manner or extent be
transferred or assigned or sublet, directly or indirectly to any persons / firms or organization what so
Authorized Signature with seal of Bidder.
FINANCIAL AND TECHNICAL CRITERIA
1. JOINT VENTURE
Joint venture is not permitted for this tender.
OTHER SPECIAL INSTRUCTIONS:
The comprehensive operation and maintenance of all pumping station is in one
package only. Bidder shall have to provide separate staff, tools & plants, consumables,
vehicles etc. for the same as approved by client. The agency should have adequate
number of tools, safety kits & plant along with adequate numbers of experienced staff
for carrying out the work.
i) Financial Criteria:
1. The bidder must have achieved a minimum annual turnover in any one year over
the last seven financial years (i.e. 2025-26 to 2019-20) of the annual value of
contract applied for. (i.e.,Rs. 28,54,650/-) (Rajkot Municipal Corporation’s
Enhancement Factor can be applicable.
2. The bidder has liquid assets (aggregate of Working capital, cash in hand and
uncommitted bank guarantees) and/or credit facility equal to 25% of the contract
value. (i.e. Rs. 14,27,325/-)
3. Available Bid Capacity-ABC must be more than the tender amount.
ABC is calculated as ABC=2*A*N-B
A = max. value of works executed in any one year during the last seven years (updated to…….*
price level) taking into account the completed as well as work in progress.
N=Number of years prescribed for completion of the works which tender are invited.
B = Value (*price level) of exiting commitments and on-going work to be completed during that
next N year (period of completion of the works for which the tenders are invited.)
Note on pre-qualification requirement:
4. Enhancement factor at 10% per year for last seven years will be applicable to
arrive at average annual turnover and experience to finalize the magnitude of
work done in last seven years.
Sr. Year Enhance
1 Year of inviting tender (2026-27)
For Financial and Experience criteria, the estimated cost of Rs. 28,54,650/- will be
Bidder has to quote their rates without GST and including other taxes. The invoice should be
submitted by contractor showing the breakup of GST in the bill. GST will be paid extra at the
prevailing rate at the time of execution.
CHECKLIST FOR SUBMISSION OF DOCUMENTS (ONLINE AND OFFLINE)
The bidder must submit the relevant documents as per below:
Sr Document Name ONLINE OFFLINE
1 Tender Fee DD
3 Current Registration in “D” Class or Above (R & B) with of any State
Government / Central Government authority/ULB
4 Tender Documents (Technical bid, Price Bid and Corrigendum with
sign and stamp)
5 Valid Electrical Contractor License
6 GST Registration
8 PF Registration
9 ESIC Registration
10 Non-Blacklist Declaration on Rs.300 Stamp
11 Turnover Certificate from CA
12 Work Experience Certificates (3A only)
13 Professional Tax Details -Enrollment certificate (Firm) and
Registration certificate (Employee)
14 Working Capital Certificate From C.A.
15 Available Bid Capacity Certificate From C.A
16 Sites visit & fully aware with nature of work confirmation letter
Note: The bidder must submit all relevant documents as per qualification criteria and
tender conditions. No correspondence to the agency will be done for shortfall documents.
Original documents to be brought by bidder/authorized person for verification on
the date and time as communicated by engineer-in-charge, if any and other
supportive documents as required in this tender, duly stamped & signed on all pages.
ii) Experience Criteria:
1. The bidder has successfully completing or substantially completing at least one contract of
similar nature of work at least 40% of the value of proposed contract within the last seven
years. (i.e. Rs. 11,41,860/-)
2. Substantially completed works means those works which are at least 90% completed as on
the date of submission (i.e. gross value of done up to the last date of submission is 90% or
more of the original contract price.) and continuing satisfactorily. Experience certificate of
competent authorities required to be submitted like 3(A) CERTIFICATE will be considered as
experience certificate.
Note:- Experience as a contractor of similar nature of work (similar nature means -
comprehensive operation and maintenance service like Water Pumping Station, STP,
Drainage Pumping Station, Water Treatment Plant in any State Government / Central
Government /ULB)
Availability of tools, plant, & manpower
1. The agency should have adequate number of tools, safety kits & plant along with
adequate numbers of experienced staff for carrying out the work.
(Details of staff & tools with agency must be submitted in tech bid.)
2. Joint venture is not permitted.
TECHNICAL CRITERIA :
3. Bidder should have enough machinery and experienced personnel to supervise the
4. The bidders should state in detail about the contracts where delay has occurred,
the period of delay and the reasons thereof. Details of works under litigation must also be
furnished. Details of works that have been abandoned for reasons whatsoever should
also be furnished.
5. Even though the bidder meets the above qualifying criteria, he shall be disqualified
if he has made misleading or false representation in the forms, statements and
attachments submitted in proof of the qualification requirements and / or record of
poor performance such as abandoning the works, not properly completing the contract,
inordinate delays in completion, litigation history or financial failures etc.
6. The above experience will be taken into consideration only for completed works carried
out for Central / State Government Agencies as a main agency.
7. The evaluation will be done only on the basis of information submitted with the tender.
8. The bidders are requested to furnish their Technical & Financial details in the prescribed
format given in this bid by the department.
9. All certificates & reports regarding financial & technical capacity & experience shall be
notarized only.
10. If required Original Certificate / Balance sheet shall have to be produced by the
Contractor at the time of evaluation of tender.
11. Tenderers shall have minimum “Key Personnel” on their employment roll (“The key
personnel”) shall mean as defined in category of manpower schedule.
12. Any organization or firm interested to quote the tender must have registration
of their firm – organization in appropriate class..
13. Experience of an individual person will not be considered as an experience of firm or
organization. Only organization / firm’s experience will be considered.
14. EXAMINATION BY TENDERERS
Prior to submitting the tender, each tenderer shall
(a) Examine all instructions, eligibility criteria, and specifications in the tendering
(b) Visit the site & determine local conditions which may effect the work including
prevailing wages & other pertinent cost factors.
(c) Familiarize himself with all central, state & local laws, ordinance, rules,
regulations & codes affecting the material supply & services including the cost of
permits & licenses required for the work at site.
(d) Co-relate his observations, investigations & determinations with the
requirement of the tender documents.
No additional claim, discrepancy etc shall be entertained after opening of tender.
15. TENDER PRICES
The Tenderer shall fill in the prices in the schedules provided online for this tender. On
acceptance, the prices shall be valid throughout the period of contract i.e.
Twenty Four (24) months.
16. DOCUMENTS COMPRISING THE TENDER:
The Tender documents prepared by the Tenderer shall be in two parts comprise the
following components:
Part I : Technical and Part –II Financial, contents of Part I and Part II shall
(A) PART – I: TECHNICAL
i. Vol. I of the Tender Documents with all schedules filled in
ii. EMD /Tender fee
iii. Certified Photocopies of audited Balance Sheets for preceding Seven financial
years. Working Capital.
iv. GST & PAN Number, Professional Tax Details-Enrollment certificate (Firm) and
Registration certificate (Employee)
v. Power of Attorney authorizing the person for signing the Tender.
vi. Tenderer’s Provident Fund (PF) /ESIC registration number.
vii. Class Of Registration, work experience Certificate, Current Electrical Contractor
viii. No Blacklist Affidavit On Rs.300 Stamp Paper with Notarized as per tender
(B) PART – II : Financial
17. EARNEST MONEY DEPOSIT
The Tenderer shall furnish, as part of its Tender, Earnest Money Deposit for the
amount as indicated in the invitation for tender.
The EMD shall be denominated in Indian rupees and shall be in form of a demand
draft in favor of Municipal Commissioner, Rajkot Municipal Corporation, Rajkot, from any
Nationalized Bank or as per Finance Department, GR No.- FD/MSM/e-
file/4/2025/2712/DMO,Dt.01/04/2026 and must be delivered within seven days from the
last day of submission of bid. The physical submission on address below by Speed Post only:
Dy. Exe. Engineer,Drainage-Project
(Ele./Mech.)Branch Nr. Keshar E Hind Bridge,
Nr. Bedinaka Tower,RAJKOT –
The bidder also can pay EMD by NEFT/RTGS or Online Transfer. the payment receipt
needs to be uploaded online along with the required tender documents, eliminating the
need for physical submission.
RMC BANK ACCOUNT DETAILS
A/C No.: 925020032594580 Bank Name: Axis Bank
IFS Code: UTIB0000631 Branch: Shashtri Medan
Any Tender without EMD will be rejected by the RMC as non-responsive.
Unsuccessful Tenderer’s Earnest Money will be discharged / returned only after work is
awarded to successful bidder.
The successful Tenderer’s Earnest Money will be discharged upon the Tenderer
signing the Contract and furnishing the performance / security deposit.
No interest will be paid on Earnest Money Deposit.
Within the stipulated days from the date of issue of the letter accepting his tender,
the successful Bidder shall furnish the required Security Deposit for performance and plus
additional security if any for unbalanced bids in accordance with the condition of the contract
and attend the office of the Engineer In-charge for execution of the contract documents. If he
fails to furnish the Security Deposit for performance or to execute the contract for the work
offered to him, his EMD shall be forfeited and the Bidder may be Black Listed / Debarred from
tendering for further works for three years.
18. TENDER VALIDITY
Tender shall remain valid for 120 days after the opening of Technical Bid Tender opening
prescribed by the RMC. A Tender valid for a shorter period may be rejected by the RMC
as non-responsive.
19. FORMAT AND SIGNING OF TENDER
Tenders signed by the Tenderer or a person or persons duly authorized to sign the
Tender. The power of Attorney in favor of the person authorized to sign the Tender shall
accompany the Tender. All pages of the Tender, shall be initiated by the person or persons
signing the Tender.
20. OPENING OF TENDERS:
The online tender will be opened online.
21. EMPLOYER'S RIGHT TO VARY QUANTITIES AT TIME OF AWARD:
The employer reserves the right at the time of award of contract to increase or decrease
the "Scope of Work" without any change in price or other terms and conditions.
22. EMPLOYER'S RIGHT TO ACCEPT ANY TENDER AND TO REJECT ANY OR ALL TENDERS.
The employer reserves the right to accept or reject any tender. The employer reserves the
right to annul the e-Tendering process and reject all tenders at any time prior to award of
Contract, without thereby incurring any liability to the affected Tenderer or Tenderers of
any obligations to inform the affected Tenderer or Tenderers of the grounds for the
Employer's action.
23. SIGNING OF CONTRACT
Within 10 days of receipt of the notification of Award/order the successful tenderer has to
execute the necessary agreement with the RMC as per the prevailing rules & regulation of
24. PERFORMANCE / SECURITY DEPOSIT
Within 10 days of receipt of the notification of award from the RMC, the
Successful Tenderer shall furnish the performance security in accordance with the
Conditions of Contract, in the form acceptable to the RMC.
The successful bidder shall have to pay security deposit amounting to 5% of
Contract Value or Estimate value which ever is higher in favour of "Rajkot Municipal
Corporation" in terms of Fixed Deposit Receipt of Nationalized Bank or as per Finance
Department, GR No.- FD/MSM/e-file/4/2025/2712/DMO,Dt.01/04/2026 valid for the
period of 30 Months.
If the contract price offered by the selected bidder is lower than 10% but up to
20% of the Estimated project Cost than the additional performance security shall be
calculated @20% of the difference in the Estimated Project Cost minus 10% of the
Estimated Project Cost and Contract Price offered by the selected Bidder.
If the contract price offered by the selected bidder is lower than 20% of the
Estimated project Cost than the additional performance security shall be calculated
@30% of the difference in the Estimated Project Cost minus 10% of the Estimated
Project Cost and Contract Price offered by the selected Bidder.
The Additional Performance Security shall be treated as part of the Performance
Security. The Performance Security shall be valid beyond 60 days of the defect liability
period and the additional Performance Security shall be valid beyond 28 days of Project
completion Date.
25. Failure of the successful Tenderer to comply with requirement of above clause shall constitute
sufficient grounds for the annulment of the award and forfeiture of the EMD, in which event the
RMC may make the award to the next lowest evaluated Tenderer or call for new Tenders.
26. The Contractor will not be entitled to subcontract any part of his obligation to any third party.
Authorized Signature with
Add. Asst. Engineer Dy.Ex.Engineer Add. City Engineer
PROFILE OF THE TENDERER
1. Name of the Company :
2. Type of the tenderer’s firm:
3. Date of incorporation of firm:
4. Nature of main business of the firm:
5. Since when dealing the business of Comp. O&M
of water/waste water plant, Pumping station ………….. Month years.
6. Total No of employees on the (who can act as “key personnel”)
7. Name and address and designation of contact person.
At head office/main office :
SEAL OF THE COMPANY SIGNATURE:
Note: This form must be submitted duly filled-in by the Tenderer
STATEMENT OF FINANCIAL PARAMETERS
1. Annual turnover for last financial seven years
Sr No. Financial Year Turnover in Enhance applying
Rupees. factor Enhancement
2. Working Capital
Working Capital
As on date :- 31-03-2026 Rs.
Note :- The bidder shall have to submit the copies of Audited Report of last seven Financial Years. The bidder
shall also have to submit the Certificate regarding Turnover and Working Capital from the registered
Charted Accountant
Authorized Signature with seal of Bidder.
DETAILS OF EQUIPMENT - OWNED/HIRED
Sr. No. Name of the Name and Make and year Working Condition
equipment’s number of of Manufacturing
* The above formats are indicative. Bidder can submit detailed information with supporting Annexures
Authorized Signature with seal of Bidder.
Details of Personnel to be deployed
Sr. Name of the Qualification Designation Age Experience Date of
No. Person appointment
* The above formats are indicative. Bidder can submit detailed information with supporting Annexures
Authorized Signature with seal of Bidder.
Comprehensive O&M Experience of
STP/WTP/Pumping station in last 7 (seven)
Sr. Name of Owner/ Client Installed No. of units Type of Total
No. Project Capacity of machineries Power
machinery in /Electrical
* The above formats are indicative. Bidder can submit detailed information with supporting Annexures
Authorized Signature with seal of Bidder.
Note: The Declaration submitted earlier to this office will not be considered as such a fresh
Declaration shall have to be done as on the milestone dates of this tender document
(Fresh Declaration To be submitted on Non-Judicial Stamp Paper of Rs.300/-)
I/We hereby declare that I/ We am/ are not partner(s) black listed /Terminated /
Debarred/Suspended or connected with firm black listed in Government, Semi-Government, ULB etc..
Also, no complaint is lodged against the Firm /Company.
At present I/We am/are registered as approved contractor(s), in class firms in _______
We, the partners/ owners of this firm, hereby give an undertaking that we are jointly and
severally responsible to meet all the liabilities ever and above the business of this firm and make good
the above financial loss sustained by the Rajkot Municipal Corporation as a result of our abandoning
the works entrusted to us.
Seal and Signature of the Bidder
Add. City Engineer,
Rajkot Municipal Corporation, Rajkot.
Name Of Work : Comprehensive Operation & Maintenance work for 02 Year of
Bajarangwadi Sewage Pumping Station.
1) I/We undertake that our agency/firm/partners etc. will strictly follow all government rules/Laws
which are applicable for workers/staffs/labors shift duties, working hours, PF and ESI etc. in all
respect. Also, we further assure that I/We shall comply all applicable rules amendments which will
be enforced by any government authority during contract period. If any violation occurs in this
regard, then I/We shall remains solely responsible.
2) I/We undertake that our agency/firm/partners etc. will strictly operate and utilized all Drainage
Pumping Station premises for RMC tender and contract agreement purpose. No any other activity
shall be carried out at site by I/We our staff and outsider Third person which is against any
government law and intense for crime or violation of any government rules or regulation. I/We
further assure that the complete Custody and Security of Drainage Pumping Station shall be our
responsibility. If such activity/Violation/premises use is occur in any regards at site then I/We shall
remain solely responsible for it. I/We are bound to take immediately actions to stop such
activity/Violation/premises use at site.
3) I/We undertake that our agency/firm/partners/staff etc. will obediently follow all
oral/written/telephonic instruction issued by all concern department staff and shall not enforced
any RMC official by any way for any kind of purposed which is affecting operation and
maintenance work/tender/contract agreement.
Signature of Contractor/Prop writer/Partners with seal.
CONDITIONS OF CONTRACT
COMPREHENSIVE OPERATION & MAINTENANCE
CONTENTS PARTICULARS
1. I - ADMINISTRATIVE AND LEGAL PROVISIONS
Definitions Interpretations
Commencement and duration of Operation and Maintenance contract
2 OPERATION OF THE FACILITIES
Operation of the facilities Responsibility of the Contractor
3 DUTY OF CARE BY THE OPERATOR AND PERFORMANCE STANDARDS
4 OBLIGATIONS AND RESPONSIBILITIES OF THE EMPLOYER
5 REPRESENTATIONS AND WARRANTIES OF THE CONTRACTOR
Performance of O & M Services
Knowledge of Adverse Information
Organization, Standing and Qualification
Due Authorization
7 INDEMNIFICATION
Loss or Damage to Facilities Other Loss or
Damage Accidents or Injury to Workmen
General Provisions
Measurement and Analysis
Plant Complex Visits
9 RECORDS AND REPORTS
Operating Records and Data
11 DELAY DAMAGES
13 Settlement Of Disputes
14 Disputes Of Differences To Be Referred To
15 Interpretation Related To Tender Conditions Or Contract Agreement
16 Governing Law and Jurisdiction
CONDITIONS OF CONTRACT
FOR OPERATION AND MAINTENANCE, I -
ADMINISTRATIVE PROVISIONS
1 DEFINITIONS AND INTERPRETATION
In these Conditions of Contract (“Conditions”) the following words and expressions shall have the meanings
hereby assigned to them, except where the context otherwise requires:
1. “Applicable Law” means all national (or State) legislation, statutes, ordinances and other
Laws and regulations and by lows of any legally constituted public authority.
2. “Contract” means the contract agreement, these conditions, the employer's requirements,
the Tender and the further documents (if any) which are listed in the contract agreement..
3. “Contractor’s Equipment” shall mean all equipment, instruments, tools, machinery and other
appliances and things of the Contractor at the Site required for the fulfillment of the obligations of
the Contractor under these Conditions.
4. “Contractor’s Personnel” means the contractor's representative and all personal whom the
contractor utilizes on site, who may include the staff, labor, & other employees of the contractor and
of each sub-contractor & any other personal assisting the contractor in the execution of the work.
5. “Dispute” shall have the meaning given to it in Clause 13 of these Conditions.
6. “Defects Liability Period” means the defect liability period of Two (2) years for all works
commencing on and from of taking over during which contractor shall under take the
responsibilities and have the liability for the facility.
7. “Employer’s Risk” shall include the risks mentioned as employers’ risks in the General
Conditions and shall include any negligence or willful misconduct on the part of the Employer and
also any event of Force Majors as provided in Clause 12 of these Conditions.
8. “Employer’s Personnel” means the Employer's Representative, the assistants and all other
staff, labor and other employees of the employer and of the Employer's representative, and any
other personnel notified to the contractor, by the employer or the employer's representative, as
employer's personnel.
9. “Employer’s Requirements” means the document entitled employer's requirements, as
included in the contract, and any additions and modifications to such document in accordance with
the contract. Such document specifies the purpose, scope, and / or design and / or other technical
criteria, for the works.
10. “Facility” shall mean the entire system constructed including the buildings, structures, ramps,
pits, pipes, fencing, lighting, testing and analysis equipment, tools, computers, software programs,
safety equipment, plant machinery, supplies, instruments and inventory incorporated therein, as
well as all open areas within the Site, and including any additions, modifications, alterations,
replacement and repairs as may be made thereto from time to time.
11. “General Conditions” shall mean the conditions of tender issued by RMC for O&M works
12. “Good Operating Practices” means the standards, practices, methods and procedures as
practiced internationally and in India conforming to all Applicable Law and that degree of skill,
diligence, prudence and foresight which would reasonably be expected from a skilled and
experienced contractor engaged in India in the same type of undertaking under the same or similar
circumstances as the Contractor pursuant to these Conditions.
13. “O & M Contract” shall mean the contract entered in between the Employer and the
Contractor pursuant to these Conditions.
14. “O & M Completion Certificate” shall mean the certificate to be issued by the Employer on
the fulfillment of all the obligations of the Contractor under these Conditions.
15. “O & M Services” shall mean those services specified in Schedule [1] which the Contractor
is obligated to perform under these Conditions.
16. “O & M Standard” shall mean the standards:
a) As set forth in the O & M Manual as accepted by the Employer;
b) As required pursuant to Applicable Law;
c) Set out in the Performance Guarantee; and
d) For the functioning of the Facility as required in accordance with the Contract including
such requirements as may be mentioned in the Employer’s Requirements.
e) For the functioning of the Facilities set forth in these Conditions.
17. “O&M Manual” shall have the meaning for manual ofOperation and Maintenance.
18. “O&M Period” shall have the meaning set out in Clause.
20. “Party” shall mean each of the Contractor and the Employer and Parties shall mean both of
21. “Performance Guarantees" shall mean the guarantee that the Facility shall be operated
satisfying the minimum performance parameters set out in Schedule.
22. “Successor Contractor” shall have the meaning given to it in Clause.
23. “Site” shall means that specific area specified in the bid documents & shall include any
other places as may be specifically designed by the employer from the time to time as forming part
24. “Taking Over Date” shall means the date of issue of the taking over certificate under the
contract phase.
25. “Taking Over Certificate” means the certificate to be issued when the whole of the works
or any sections or parts of the permanent works have been substantially completed & satisfactorily
parts of the test on completion in accordance with the provision of the contract.
26. “Termination” shall have the meaning given to it in Clause [12]of these Conditions.
(a) In these Conditions, except where the context requires otherwise: (a)words indicating one
gender include all genders;
(b) words indicating the singular also include the plural and words indicating the plural also
include the singular;
(c) Provisions including the word "agree", "agreed" or "agreement" require the agreement to be
recorded in writing;
(d) "written" or "in writing" means hand-written, type-written, printed or
electronically made, and resulting in a permanent record;
(e) The marginal words and other headings shall not be taken into consideration in the
interpretation of these Conditions;
(f) The words "include," "includes" and "including" are not limiting;
(g) As used in these Conditions, all defined terms include the plural as well as the
(h) Any agreement, document or drawing defined or referred to in these Conditions shall
include each amendment, modification and supplement thereto and waiver thereof
as may become effective from time to time, except where otherwise indicated;
(i) Any reference to any Clause or Sub – Clause shall unless specified otherwise mean a
Clause or Sub- Clause of these Conditions; and
(j) Any rights of the Employer to make any inspections or to review any document shall not
create any obligation on the Employer to conduct such inspections or reviews to detect any
errors, inaccuracies, ambiguities or other potential problems. No inspection or approval by or
on behalf of the Employer shall operate as a waiver of any provision of these Conditions, any
obligation of Contractor under these Conditions, or any of the rights of the Employer
hereunder, except as expressly agreed in writing by the Employer.
Commencement and Duration of Comp. O & M Contract
“The comp. O & M Period” shall commence upon issuing of work order and
shall continue for a period of two (2) years. The Employer may propose an extension to the Comp.
O&M Period by giving prior notice to the Contractor
The O&M period may then be extended subject to mutual consent and on
terms and conditions agreed to by both the Parties.
The Contractor shall comply with all Applicable Law relevant to the Contractor's
Personnel, including Applicable Law relating to their employment, health, safety, welfare,
immigration and emigration, and shall allow them all their legal rights.
The Contractor shall require his employees to obey all Applicable Laws,
including those concerning safety at work.
In the event Employer becomes liable to any Employers Personnel, any
governmental authority (including but not limited to any fines or penalties levied by or payable
to such authority) or any other third party under the provisions of any
Applicable Law resulting from Contractor's failure to comply with such Applicable Law, Contractor
shall reimburse Employer for all payments required to be made by Employer to such Employers
Personnel, governmental authority or any other third party, plus the actual expenses that
Employer may incur in investigating, settling or defending any litigation or threatened litigation.
The Contractor will not be entitled to sub-contract any part of his obligation under these
Conditions to any third party without prior approval of the Employer. Neither party may assign
their rights and obligations under these Conditions without the consent of the other Party.
However the Employer may assign any rights under these Conditions to any financial
institution from whom any financial assistance/credit facilities have been availed by the Employer.
In the event of an emergency endangering life or property, the Contractor shall take such action
as may be necessary to prevent, avoid or mitigate injury, damage or loss and shall, as soon as
possible, report any such incidents, including his response thereto to the Employer.
Contractor Action
The Contractor shall utilize his personnel to take such action as may be necessary in accordance
with Good Operating Practices in the event of an emergency. Notwithstanding anything to the
contrary herein, the Contractor may incur any expenditure or take any other operating actions as
the Contractor deems to be necessary (in accordance with Good Operating Practices) in the case
of emergencies affecting the Facilities or the operation of the Facilities to counteract the effects
where the Contractor considers immediate action is required to safeguard lives or
property. In case such emergency was caused due to an Employer’s Risk then the Employer shall
reimburse such reasonable expenses that might have been incurred by the Contractor in
relation thereto acting in accordance with Good Industry Practices.
In the event of an emergency the Contractor shall forthwith notify the
Employer of the emergency, the expenditures made and the operating actions taken.
If the Employer considers that an emergency has arisen in relation to the
Facilities, the Employer may give written notice to the Contractor specifying the nature of the
emergency which it has identified and the manner in which it requests such emergency to be
rectified. The Contractor shall rectify such defect with all due diligence. If such emergency is on
account of an Employer’s Risk then the Contractor shall be reimbursed all costs and expenses
reasonably incurred by the Contractor for any actions taken by it pursuant to such direction or
notice. If the Contractor fails to comply with such direction or notice promptly, the Employer
shall be entitled to procure that itor any third party takes such actions as may be necessary to
remedy such breach by the Contractor. Any costs that may be incurred by the Employer in this
regard shall be reimbursed to him in full by the Contractor and shall be a debt due to him from
the Contractor.
Notwithstanding any provisions of these Conditions and without prejudice to any of the other
rights vested by the Contractor under these Conditions, the Employer shall have the right at all
times to inspect the Facilities and the Contractor shall co-operate in every manner with the
representatives of the Employer inspecting the Facilities and allow them access to every part of
the Facilities and produce any records requested.
2 OPERATION OF THE FACILITIES
Operation of the Facilities
The Employer appoints the Contractor to perform and undertake the O & M
Services and all other obligations set out and in accordance with these Conditions during the
O&M Period. The Contractor accepts the appointment and acknowledges a
duty to perform such obligations.
The Contractor shall be in complete charge of and have custody and control
over and responsibility for the Facilities, and the Contractor shall perform or cause to be
performed on behalf of the Employer all O & M Services for the Facilities and shall supply or cause
to be supplied all materials required therefore in accordance with the O & M Standard.
The Contractor shall also acknowledge that the Employer and the Employer’s
Personnel and other contractors may be carrying out work at the Facilities and shall endeavor to
fully co-operate and work in a manner so as not to cause any obstruction or hindrance to them.
The Contractor is an independent Contractor and not an agent, employee and
nothing in these Conditions or the O & M Contract shall be deemed to create a joint venture
between the Employer and the Contractor.
Responsibility of the Contractor
perform the O&M Services in accordance with the O&M Manuals and maintain the Facilities
in good repair and condition and ensure that the Facilities are well and suitably maintained at all
times in accordance with Good Operating Practices and in accordance with these Conditions;
procuring and administering all chemicals and other consumables, tools,
equipment, spare parts and other materials (which shall be of good quality and unused) necessary
for the operation and maintenance of the Facilities;
maintaining a system of records to identify all inventories related to the
Facilities and preparing and providing to the Employer a complete accounting of such inventory
for every fiscal quarter;
arranging for the testing and recalibration of all scales, meters, gauges and other
measuring devices at the Facilities on an annual basis unless otherwise stated in the O & M
for providing any and all relevant information required by the
3 DUTY OF CARE BY THE OPERATOR AND PERFORMANCE STANDARDS
The Contractor shall manage, operate and maintain the Facilities in accordance
with Good Operating Practices and in accordance with the O & M Standard so that the Facilities are
capable of meeting the outputs and specifications set out in the Contract.
The Contractor shall take full responsibility for the care of the Facility from the date of
issue of the Taking-Over Certificate, till the end of the O & M Period.
If any loss or damage happens to the Facility, during the O & M Period due to
any breach by the Contractor of any of his obligations under these Conditions including any
willful misconduct, negligence and non conformity with Good operating
Practices than the Contractor shall, at his own cost, Rectify such loss or damage so that the
Facility conforms in every respect with the provisions of these Conditions.
The Employer shall be liable only in case of any damage caused due to any
Employer’s Risk.
4 OBLIGATIONS AND RESPONSIBILITIES OF THE EMPLOYER
The Employer shall employ the Contractor to provide the O & M Services and shall:
following the issue of work order, hand-over the custody of the Facilities to the
Contractor for its use during the O & M Period; and
pay the Contractor all sums required to be paid in accordance with the terms of these Conditions.
Notwithstanding anything else herein contained the Employer may set off any sums owed by the
Contractor under the Contract for monies owed to the Contractor by the Employer under these
Conditions or as a debt due from the Contractor.
No advance payment or Down payment shall be made.
5 REPRESENTATIONS AND WARRANTIES OF THE CONTRACTOR
The Contractor hereby represents for the benefit of the Employer as follows:
Performance of O & M Services
that the Contractor has the required skills and capability to perform, and
shall diligently perform, the O & M Services in a high- quality, timely and professional manner
utilizing sound engineering principles and project management procedures in accordance with
Good Industry Practices;
that the Contractor shall perform its obligations hereunder in accordance with
the requirements of these Conditions and shall meet the Performance Guarantee; and
that it shall not use any spare parts or material that are not new and
which shall be of a quality that is in accordance with Good Industry Practices.
Knowledge of Adverse Information
As of the Commencement Date, Contractor is not aware of any facts, conditions
or events which would affect the ability of Contractor to provide the O & M Services in accordance
with these Conditions.
Contractor has familiarized itself with the nature and extent of the O & M
Services required to be provided under these Conditions and with all other requirements under
Applicable Law.
Organization, Standing and Qualification
Contractor is validly existing and in good standing under Applicable Law and has all necessary
power and authority to carry on its business as presently conducted and to perform its
obligations under these Conditions. Contractor is, or will be prior to the date on which the O & M
Services are to be commenced duly qualified or licensed to provide these services.
Due Authorization
Each of the execution, delivery and performance by the Contractor of all
contracts entered into pursuant to these Conditions shall be duly authorized by all necessary
action on the part of Contractor. Neither the execution and delivery by Contractor of the O&M
Contract, nor the consummation by Contractor of any of the transactions contemplated hereby,
requires the consent or approval of, the giving of notice to, the registration with, the recording or
filing of any document with, or the taking of any other action in respect of, any governmental
authority or agency, except:
(a) Such as have been duly obtained, given, registered, recorded, filed or
taken and are in full force and effect or are not yet required; and
(b) Filings and recordings expressly required pursuant to the O & M
Contract. Contractor holds, or will obtain,
any and all licenses, permits and approvals on a timely basis. Contractor has no
reason to believe that any of those not yet required will not be readily obtainable or done
in the ordinary course of business upon due application there for.
In the aggregate, there are no pending or, to the knowledge of Contractor, threatened
actions, investigations or proceedings before any court, governmental authority or
arbitrator, which would have material adverse effect on the ability of Contractor to
perform its obligations under these Conditions.
6 . 1 The equipment being operated and maintained in this Contract shall be fully insured against loss or
damage by the contractor. The Goods supplied under the Contract shall be fully insured against
loss or damage incidental to manufacture or acquisition, transportation, storage and delivery in
the manner specified in the Special Conditions of Contract.
The Contractor shall, without limiting his or the Employer's obligations and responsibilities will
insure equipment and other things brought, onto the Site by the Contract, for a sum sufficient to
provide for their replacement at the Site.
Any amounts not insured or not recovered from the insurers shall be borne by the Contractor in
accordance with their responsibilities under the agreement.
The Contract shall indemnify the Employer against all lasses and claims in respect of -
a) Death of or injury to any person, or,
b) Loss of or damage to any property (other than the Works)
c) Which may arise out of -iii consequent of the Operations and Maintenance
of the Facility and the rectifying of any defects therein,
and against all claims proceedings, damages, costs, charges and expenses
whatsoever in respected thereof or in relation thereto.
The Employer shall not be liable for or in respect of any damages or compensation payable to
any workman or other person in the employment of the Contractor or any Sub- contractor,
resulting from any act or default of the Contract, his agents or servants.
The Contractor shall insure all the personnel against damage, health hazard, loss of life, safety
requirements and other obligations over and above that is considered under labour laws, factory
act and prevalent statutory laws in the region. The certificates of the workman's insurance shall
form part of the agreement and in absence of such insurance, work or O & M shall not commence.
7 INDEMNIFICATION
Loss or Damage to Facilities
The Contractor shall at its own expense make good any physical loss or damage to the Facilities
occasioned by it in the course of the performance of its obligations under these Conditions if and
to the extent such loss or damage is caused by the negligence, wilful default or breach of
statutory duty or failure to follow Good Industry Practices by the Contractor.
Other Loss or Damage
Except as otherwise stated in this Clause 7.2 or covered by Clause 7.3, the
Contractor shall indemnify, defend and hold harmless the Employer against any and all liabilities,
losses, damages and claims of whatever kind and nature, including all related costs and expenses
incurred in connection therewith, in respect of personal injury to or death of third parties or any
employee of the Employer or the in respect of loss of or damage to any third party property or
property belonging to employee of the Employer by:
(i) any breach by the Contractor of its obligations hereunder; and
(ii) any negligence, willful default or breach of statutory duty on the part of
Except as otherwise stated in this Clause 7.2 or covered by Clause 7.3, the
Employer shall indemnify, defend and hold harmless the Contractor for all claims and losses of
whatever kind and nature, including all related costs and expenses incurred in connection
therewith, in respect of personal injury to or death of third parties or of any person employed by
the Contractor in respect of loss of or damage to any third party property or property belonging
to any person employed by the Contractor to the extent that the same arises out of any
Employer’s Risk.
Accidents or Injury to Workmen
The Contractor shall indemnify, defend and hold harmless the Employer or any
Employer’s Personnel against any and all claims for loss, damage and expense of whatever kind
and nature (including all related costs and expenses) in respect of the death of or injury to any
person employed by the Contractor in connection with the performance of the O&M Services and
and obligations hereunder except to the extent that such death or injury is caused by an
Employer’s Risk.
Neither Party shall be liable to the other Party for loss of use of the Facilities, loss
of profit, loss of any contract or for any indirect or consequential loss or damage which may be
suffered by the other Party in connection with the Contract, other than under Sub- Clause [13] and
this Clause [7].
The total liability of the Contractor to the Employer, under or in connection with
these Conditions other than as provided in Clause 7.3.1 & 14 shall not exceed the sum of the O &
M Price and the Delay Damages payable under the these Conditions.
This Sub-Clause shall not limit liability of the Contractor in case of fraud, willful default, gross
negligence and liabilities arising due to breach of Applicable Law and the liability under any other
Clause of these Conditions that might impose a greater liability on the Contractor.
General Provisions
The Employer may check the operation of the Facilities or designate an organization of his choice
to carry out inspections regularly. The Employer or the organization appointed by him shall check
that the Contractor is performing the tasks for which he is responsible with due diligence. The
Contractor shall at his cost provide all the assistance the Employer requires to complete these
Measurement and Analysis
The Employer has the right to perform any analysis or inspection he
deems necessary.
The sewage quantity, for any such test, analysis or inspection shall be measured
by flow-meters installed at the Facility, which are acceptable to the Employer.
The Contractor shall be responsible for the security and protection of flow-
meters at the designated point. If there is any malfunctioning of the meters, it should be replaced
at the Contractor’s cost.
A report shall be drawn up to record the opinions of both Parties. The
Employer reserves the right to call in equipment manufacturers or specialized technicians for
These visits shall provide an opportunity for examining maintenance programs
and operating procedures and improvements requiring additional investments.
Any test, visit, analysis or inspection and any approval thereof shall not in any
way alter/modify or dilute the responsibility of the Contractor to fulfill his obligations under these
9 RECORDS AND REPORTS
Operating Records and Data
The Contractor shall:
Prepare and maintain, on a current basis and in accordance with generally
accepted Indian accounting principles, proper, accurate and complete books and records and
accounts of all transactions related to the Facilities including a log book at the site which shall
contain inter alia the following details:
(a) Reading from the different meters, indicators and recorders (including but not
limited to consumption of energy, volume of sewage conveyed, operating times of
the different items of equipment etc which may be updated on a daily basis);
(b) Report of visits by persons other than those of the Employer and the Contractor to
Establish and maintain a weekly and monthly reporting system to provide
storage and ready retrieval of operating data relating to the Facilities, including such information
necessary to verify calculations made pursuant to these Conditions or the O & M Contract and
provide the same to the Employer on a monthly basis.
Provide to the Employer or such persons notified by it access to the Facilities and
to data in relation to the Facilities, at all times.
At the Employer’s request, at the end of every month, make a copy of the system
performance data for that month as recorded by the instrument and control system on floppy
diskettes and printed document therefrom and deliver the same to the Employer with one week.
Provide support to the Employer to meet the data requirements of all competent
authorities and under Applicable Law.
The Contractor shall submit the reports mentioned in Schedule [4] at times indicated in the said
Schedule (Hard copy as well as Soft copy).
The Contractor shall also provide the Employer with such reports as are required
by the Employer and shall comply with all reporting requirements prescribed under these
Conditions and the Comprehensive O & M Contract. In addition the Contractor shall submit the
following information to the Employer:
Upon obtaining knowledge thereof, shall submit prompt written notice of:
(i) any litigation or material claims, disputes or actions, threatened or filed, concerning the
Facilities or the services to be performed hereunder;
(ii) any refusal or threatened refusal to grant, renew or extend or any action pending or
threatened that might affect the granting, renewal or extension of any clearance, permit
(iii) Notwithstanding the aforementioned materiality, all penalties or notices of violation
issued by any authority under Applicable Law;
The Contractor shall promptly submit to the Employer any material information
concerning new or significant aspects of the operations of the Facilities, any material complaint
about the Facilities from any person or entity with a bona fide complaint who complains directly to
the Contractor and, upon Employer’s request, shall promptly submit any other information
concerning the Facilities or the services performed by the Contractor.
The Employer may from time to time specify any changes to be made to any
of the format of any report or plan required hereunder.
If the Contractor is required by any Applicable Law to produce any
projection, report or any other document relating to the provision of the Comprehensive O & M
Services of the Facilities or the
Employer requests a report regarding other information relating to the Facilities, the Contractor
shall prepare a draft of such document at the request of the Employer, as soon as practicable and
in any event within any time limit prescribed by Applicable Law.
If the Contractor is required by any Applicable Law to produce any projection,
report or any other document, it shall prepare such report diligently and submit the same to the
Employer as soon as possible thereafter. Wherever practicable, such reports shall be submitted
to the Employer for review _[3]_ days before the same is issued. The Contractor shall take into
account any comments or revisions proposed by the Employer thereon.
The Contractor is responsible for the procurement of all goods and services
necessary to ensure compliance with its obligations under these Conditions.
The Contractor shall procure spare parts, materials, supplies and other
consumable items, and maintains an adequate inventory thereof Facilities.
The Contractors request(s) for payment shall be made to the RMC in writing, accompanies
by invoice(s) along with presence sheet of personnels of particular month duly certified by our
Engineer on site, claims etc. as appreciate.
Payment shall be made by RMC as per procedure subsequent to the submission of such
invoice(s)/ claim(s) by the Contractor.
The RMC will deduct from the amount payable to the Contractor, any amount paid by
RMC on behalf of the Contractor e.g. (telephone bills, PGVCL penalty for Power factor or any other
dues and liquidated damages as per clause and, as per tender terms and condition. Any telephone
bills submitted by telephone department, the cost of bills will be borne by Contractor.)
11 DELAY DAMAGES
Performance Guarantees and Delay Damages
The Contractor shall operate and maintain the Facilities in accordance with: The O & M
Standard; and the Good Industry Practices. In case of the failure of the Contractor to achieve each
each unit of shortfall.
Termination shall mean the termination of the Comprehensive O&M Contract by the
Employer or the Contractor in accordance with Clause 12.1 or 12.2 respectively.
Termination by Employer may be in case of:
The Employer may terminate the Comprehensive O & M Contract by notice on:
1. the dissolution or insolvency of the Contractor, pursuant to an order of a court or the
bankruptcy of the Contractor; or
2. if 45 days having passed since the Contractor is in material breach of his obligations under
these Conditions, or
3. if the Contractor ceases to carry on its business; or
4. abandonment; or
5. If penalty amount exceeds to 10% of one year tender amount.
Payments upon Termination
Upon termination or as soon as practicable thereafter an account shall be taken of the net
amount owing from the Employer to the Contractor or from the Contractor to the Employer (as the
case may be). The Employer shall forthwith pay to the Contractor (if the balance is due to the
Contractor) all moneys due to the Contractor. If the account shows a balance due to the
Employer from the Contractor, the Contractor shall forthwith pay any such balance to the
As part of the calculation made pursuant to clause 12.1 of the amounts due to the
Contractor on Termination, the following amount shall be taken into account:
The portion of the Comprehensive O & M Price outstanding and payable by the Employer
for the period prior to the Termination;
any Delay Damages or indemnities for which the Contractor would be liable under
these Conditions up to the date of Termination;
any other amounts due to the Employer under these Conditions by the Employer including return
of any amount of the O & M Price paid in advance by the Employer to the Contractor under Clause
12.3.3 In case of a Termination by the Employer in accordance with Clause
12.1 the Employer may recover other than the amounts due to him under Clause
12.2.2, any costs incurred by him in finding any replacement contractor.
Successor to the Contractor Upon
Termination: - The Contractor shall use all endeavors to facilitate the appointment and
commencement of duties of any person to be pointed by the Employer to operate and maintain
the facilities (the “Successor Contractor”) so as not to disrupt the normal Operation &
Maintenance of the Facilities and shall provided full access to the Facilities and to all relevant
information, data and records relating thereto by the Successor Contractor and its
representatives and accede to all reasonable requests made by such persons in connection with
preparing for taking over the Operation & Maintenance of the Facilities,
Promptly after Termination, the Contractor, shall deliver to (and shall, with effect from
Termination, hold on trust for and to the order of) the Employer or (if so required by the
Employer by written notice) to the Successor Contractor all property in its possession or under its
control owned by the Employer or leased or licensed to the Employer;
The Contractor shall transfer to the Successor Contractor, as from the date of Termination, its
rights as the Contractor under all contracts entered into by it in the performance of its obligations
under these Conditions or relating to the Operation
& Maintenance of its obligations under these Conditions or relating to the Operation &
Maintenance of the Facilities. Pending such transfer, the Contractor shall hold its rights and
interests thereunder for the account and to the order of the Successor Contractor.
The Employer shall be reimbursed any cost and expenses incurred by the Employer due to default
of the Contractor in discharging its obligations under this Clause [12].
The Contractor shall, upon Termination of the O & M Contract, co- operate with the Employer and
the Successor Contractor and comply with all reasonable requests thereof, including the execution
of documents etc.
Upon Termination of the O & M Contract on expiry of the terms of the O & M Contract, the Parties
The Contractor will use reasonable efforts to ensure a transition to the next Contractor that will
avoid operating difficulties for the Faculties.
For a six (6) month period after Termination or six (6) months prior to the expiration of the O & M
Contract, the Contractor shall, at his expense, provide sufficient assistance to the Employer in the
hiring and training of replacement personnel for those Facilities.
Notwithstanding anything else herein contained the Employer shall be entitled to terminate the O
& M Contract, at any time at the Employer's
convenience, by giving notice of such termination to the Contractor. The termination shall take
effect 28 days after issuance of the notice of termination.
On the expiry of the O & M Contract or Termination of the O & M Contract, all the
installations, works and equipment placed under the Contractor’s responsibility shall be handed
over to the Employer, at no cost, in good working order, except for normal wear and tear.
The Employer may perform any inspections, tests or expert appraisals he shall consider necessary
with a view to checking that the property is in good working order. The Contractor shall also hand
over any unutilized spares, consumables etc. Purchased for the Facilities.
At the end of successful Comprehensive O & M Period, the Contractor shall be entitled to receive
an O & M Completion Certificate. The delivery of such O & M Completion Certificate will relieve
the Contractor from his responsibility as regard to the operation & maintenance of the Facilities
and confirm that the Contractor has fulfilled all of his obligations under these Conditions.
13 Settlement Of Disputes :
Except as otherwise specifically provided in the contract, all disputes concerning questions of fact
arising under the contract shall be decided by the Engineer- In-Charge subject to a written
appeal by the Contractor to the Engineer-In- Charge and those decisions shall be final and
binding on the parties hereto. Any disputes or differences including those considered as such
by only one of the parties arising out of or in connection with this contract shall be to the extent
possible settled amicably between the parties. If amicable settlement cannot be reached then all
disputed issues shall be settled as provided in Article GC-48 (Disputes or differences to be
referred to) and Article No.GC-49 (Interpretation Related To Tender Conditions or Contract
14 Disputes of Differences to Be Referred To:
If at any time, any question, disputes or differences of any kind whatsoever shall arise
between the Engineer-In-Charge and the contractor upon or in relation to or in connection
with this contract either party may forthwith give to the other, notice in writing of the
existence of such question, dispute or difference as to any decision, opinion, instruction,
direction, certificate or evaluation of the Engineer-In-Charge. The question, dispute or
differences shall be settled by the Municipal Commissioner, Rajkot Municipal Corporation, who
shall state his decision in writing and give notice of same to the Engineer-In- Charge and to the
Contractor. Such decision shall be final and binding upon both parties.
15 Interpretation Related To Tender Conditions Or Contract Agreement:
For any interpretation related to tender conditions or contract agreement conditions, the
decision of Municipal Commissioner, Rajkot Municipal Corporation shall be considered as
final and binding and in the event of any dispute arising pertaining to tender conditions or
contract agreement conditions the jurisdiction shall be Rajkot Civil Court /Commercial Court of
16 Governing Law and Jurisdiction
These Conditions and the Comprehensive O & M Contract shall be governed in accordance with
The Contractor agrees that any legal action or proceedings arising out of these Conditions may be
brought in the courts or tribunals at Rajkot in India and irrevocably submits themselves to the
jurisdiction of such courts or tribunals. The Employer may, however, in its absolute discretion
commence any legal action or proceedings arising out of these Conditions in any other court,
tribunal or other appropriate forum, and the Contractor hereby consents to such jurisdiction.
Comprehensive Operation and Maintenance Services
1. The Contractor shall be required to perform the following services under these Conditions1:
2. The Contractor shall be responsible for corrective maintenance of civil, hydraulic, mechanical,
electrical and computing equipment as well as miscellaneous equipment.
3. The Contractor shall be responsible for carrying out regular servicing and lubrication of rotary machines,
complying with maintenance instructions as defined in the Operation and Maintenance Manual, and ensuring that
electromechanical equipment and motors operate correctly at all times.
4. The Contractor shall ensure that measurement systems operate correctly at all times.
5. The Contractor is responsible for the maintenance of the landscaped areas inside the Employer existing
6. The Contractor shall be responsible for maintenance of all the components of the plant including
laboratory and administrative building, garden, road etc.
7. The Contractor will operate and maintain in a state of continuous operational readiness all pumping
station and systems to meet the laid down standards. It shall remain the Contractor’s responsibility to ensure
that systems are at all times able to operate to the maximum capacity of the installed duty plant.
8. The meters of pumping station shall be inspected and calibrated.
9. For the duration of the Comprehensive O & M period, the Contractor will be responsible for the supply
and control of lubricants, spare parts and consumable materials excluding electrical power, necessary for the
continuous operation of the works.
Provided here are certain standard services that RMC could require. However RMC may wish to review this and make
changes depending on the exact nature of services they require from the Contractor.
10. The Contractor will manage the consumables and utilities services to ensure their most economic
consumption and to minimize wastage.
11. The quantities of all the unutilized spare parts and consumable materials will be fully handed-over to the
Employer at the end of the Comprehensive O&M period.
12. The Contractor will make all necessary arrangements to ensure the continuous supply of spare
parts and material for the works, and the rate of supply of these materials shall be in such quantities and amounts
as would ensure uninterrupted operation.
13. All the furniture and administrative office equipment etc. required shall be furnished by the
Contractor. Costs of operating administrative office and supplies shall be borne by the Contractor.
14. Cost of operation and maintenance and housekeeping of housing complexes including roads, gardens,
electrical installations, etc. will be borne by the contractor.
15. The replacement of major electrical and mechanical equipment if found necessary will be done by Rajkot
Municipal Corporation. Below mentioned replacements are in scope of RMC.
A. Repairing of compound wall and roads shall be attended by RMC
B. All types of pumps & Motors Above 20-HP, Flowmeter Above 150-mm
C. HT, LT, PMCC, MCC, PLC Panels (Whole)
D. Transformers
F. All types of valves (Above 200mm)
G. Gate Valves (Above 200mm)
16. Maintenance / repairing of all electrical / mechanical equipment, rewinding of all type of motors,
repairing of all types of pumps, motors, electrical starters, repairing of transformer, DG Set, cable jointing,
Scada Panel-Level sensor-Flow meter with all accessories shall be done by the contractor.
17. Major repairing of civil structure / mechanism / electrical accessories in case of earthquake, heavy flood,
heavy cyclone, riot, theft, fire, any kind of accident etc. shall be in the scope of contractor
18. Contractor should provide Id Card, uniform-dress code, white board, sign board in main gate, 04 nos
chairs and table, cupboard for staff in pumping station. Or for office use.
19. Service of DG set done by contractor in every six Months and All consumable items are in contractors’
Specific Conditions for Comprehensive Operation and Maintenance of Electrical
Equipment/Services
1) The Contractor shall be required to perform necessary O&M, lubrication and alignment services of HT DP
Structure at an regular interval of 6 months with all required consumables.
2) The contract shall be required to perform Oil BDV Test and Oil Filtration of Transformers once in a year and to
make top up of required oil quantity.
3) The bidder shall be required to perform HT Breaker maintenance and servicing as well as to perform necessary
testing and calibration of relay and breaker once in a year.
4) The contractor shall be required to perform maintenance of LT Panel, APFC Panels, Equipment Panels, Starter
Panels, VFD Panels, Electrical Motors etc. once in every month with necessary tightening, blowering, fitment,
proper termination and other necessary maintenance activities.
5) The contractor shall be required to perform Earth Measurement of each earth stations once in every
6) The contractor shall be required to submit necessary data, test reports, drawings etc. and get the clearance of
Electrical Inspector for Annual Inspection of HT Installations.
7) The contractor shall be required to perform necessary repairs of all area lighting and internal/external building
lighting and should keep all lighting in ON condition during night hours.
8) The contractor shall be required to display Electrical Shock Treatment Chart (Wooden/Laminated Framing) in
Vernacular Language in Elect. Panel Room.
9) The contractor shall be required to install First Aid Box with necessary medicines in Elect. Panel Room.
10) The contractor shall be required to keep sufficient quantity of necessary Safety Tools and Tackles like 11KV
Rubber Hand Gloves, 11kV FRP DO Fuse Rods, 11KV Earth Rods, Helmets, Aprons, Safety Belts, Safety Shoes
11) The contractor shall be required to keep sufficient quantity of necessary tools for repairing like tester, Fix and
Ring Pana wrench set, allen key set, plier(pakkad), dismiss set, Meggar, clipon meter etc.
12) The contractor shall be required to install necessary quantity of Fire Extinguishers in Elect. Panel Room as per
instructions of EIC. Also Fire Extinguishers refill once in a year.
13) The contractor shall be required to provide Sand Buckets with necessary stand/support in HT Switchyard as per
instructions of EIC.
14) The contractor shall be required to replace damaged Insulation Mats in Elect. Panel Room and other electrical
installations as per instructions of EIC.
15) The contractor shall be required to co-ordinate with PGVCL for power failures, interruption and planned
16) The contractor shall be required to provide 3-chair and 1-table for man power sitting arrangement and 1-
cupboard each pumping station for to put necessary tools and tackles for Screen Cleaning & Safety
Equipment’s like Glooves, Gum boots ,Helmets etc.
The above are certain standard services that RMC could require. However RMC may wish to review this and make
changes depending on the exact nature of services they require from the Contractor. The contractor has to
submit necessary maintenance reports as per EIC instructions.
The Contractor shall be paid amount for Comprehensive O&M quarterly.
Insurance against Injury to Persons and Damage to Property
The Contractor shall insure against each liability for any loss, damage, death or bodily injury which may
occur to any physical property (mechanical, electrical, automation work pipeline, other civil work, storage)
or to any person which may arise out of the Contractor's performance of his obligations under these
Conditions during the Comprehensive O & M Period.
This insurance shall be for a limit of per occurrence of not less than the amount, with no limit on the
number of occurrences. Insurance for Contractor's Personnel
The Contractor shall affect and maintain insurance against liability for arising from injury, sickness, disease
or death of any person employed by the Contractor or any other of the Contractor's Personnel.
The Employer shall also be indemnified under the policy of insurance, except that this insurance may
exclude losses and claims to the extent that they arise from any act or neglect of the Employer or of the
Employer's Personnel.
SPECIAL TERMS AND CONDITIONS (PART – I)
Technical Conditions
1) The operation and maintenance of all the works included in this tender as per details given should
be carried out by contractor at his own cost.
2) Electricity bill for running the pumping station at site will be paid by RMC, bill should be
submitted to office for payment as soon as received at site. Penalty if any for delay will have to be
paid by contractor.
3) All the required electrical goods like bulb, tubelight, chock, starter, fuse, wire etc. required for
operation and maintenance shall be procured by contractor at his own cost and lighting
arrangement should be kept in good condition.
4) At the time of breakage in pipeline or valves for repairing purpose contractor has to make
arrangement at his risk and cost for labours, fitter, required all materials like rubber packing, nut
bolts, gland, all required parts of valves in Pumping station & transmission main including pickup
van, Jeep, welding machine, welding rods, Tractor etc. should be provided by contractor at his
own cost. All consumable material should be of standard quality as approved by Engineer-in-
charge of work.
5) All type of pipeline including chambers, open channels, gates should be maintained and repaired
by contractor at his own cost.
6) At the time of repairing or replacement of any type of Pipes and valves required for repairing
or replacement after verification by concerned engineer or his representative, fitting work of pipe
or valves shall be carried out by contractor at his own cost including, labour, excavation cutting,
fitting, welding, testing, refilling etc. complete. Repairing work shall be started within one hour
after breakage or leakage comes into notice.
7) Any type of valve or gate or part of the valve or gate not working properly after repairing and
requires replacement, as per opinion of Add. City Engineer or his representative, then required
valve gate will be supplied to the contractor free of cost from departmental store if available.
Replacement shall be done by the contractor and old valve gate should be shifted to department
store and entered in concerned register including cost of loading, unloading, carting stacking etc.
8) During the period of contract a person other than responsible representative of contractor or
persons employed by him should not enter into the premises of the plant. Every care should be
taken by contractor to prevent such type of unauthorized entry or interruption in the premises or
surrounding the property of RMC.
9) At any time during the visit of Engineer in charge or his representative if it is observed that the
operation and maintenance is not carried out properly, that work liable to be terminated or
rejected for compliance.
10) Operation and maintenance of meters installed at pumping station sites should be
carried out by contractor and entry shall be made in the register at every one hours. If any meter
is not working properly it should be properly repaired by contractor from any technician of such
type of repairing work. If It is not repairable replacement will be done by contractor.
11) After issue of work order contractor or his responsible representative should joint visit the site of
every work accompany with officer concern. A list and position of works and all valves with dia
and nos. a report will be prepared and should be jointly signed by contractor and department. A
copy of same report shall be issued to contractor. At the time of completion of contract period
same type of report should be prepared and possession of all the works and components should
be handed over to department. If repairing & maintenance work is not done properly by
contractor, the cost of repairing work will be recovered by department from contractor.
12) All the works executed under this project & covers in the scope of this tender shall be handed over
to contractor from the date of work order. Proper operation and maintenance of the same
works/components shall be carried out by contractor and at the time of completion of
contract period or termination of contract, contractor should have to give possession of all the
work and components to the department in good condition. Before handing over the possession
to the department account of contract will not be finalized and deposit will not be refunded to
contractor. For all type of legal activities and expenditure for the same, contractor will be fully
13) During the period of contract for any type of dispute, decision of Municipal Commissioner will be
final and binding to both the parties.
14) Prescribed registers as maintained by Bidder during the period of operation and maintenance
period shall be submitted to the department. All the material received during repairing and
replacement shall be deposited in departmental store at the cost of contractor. All repairing
work should be carried by contractor at his own cost during the period of contract contractor
should be fully responsible for injury to any public person or men engaged by contractor for work
and contractor shall be fully responsible for compensation for it.
15) Servicing of all the valves and gates cleaning of all civil works and maintenance shall be carried out
regularly by contractor and entered into the concerned registers.
16) Work sheet shall be maintained by contractor for replacement of material in pipeline, or
valves, spare parts of Electro -mechanical equipment’s.
17) All the works included in the scope of work shall be oil / snowcem painted once in the two years
contract period (i.e. at the end of first year or as suggested by engineer-in-charge) at the cost of
18) All the gardens and plants situated at pumping station sites shall be supplied water and
maintained properly by contractor. No any extra payment will be made on account of this work.
19) All the information regarding labours, staff, vehicles etc. is incorporated in this tender for
preparation of estimate. As per list staff having proper qualification / labours shall be deployed by
contractor for smooth running of plant, failing
which, RMC will deploy required personnel at the risk and cost of contractor and recovery for
such expenditure will be made from the bill of contractor.
20) The contractor has to make all the arrangements required for the proper operation, maintenance
smooth running of plant and safety of all the works included in this contract at his own cost during
the whole contract period.
21) List of all the assets, pipeline appurtenance pumping station & machineries, all types of valves,
gates, chambers, pump houses, security cabin, office building and lab, hydraulic civil structures,
spare parts, store, telephone, electric panels etc. will be handed over to contractor for M&R
purpose & same should be returned to RMC in working condition as soon as the pumping station
is taken over by RMC for further M&R period to any other party.
22) Any damage / breakage found from mischievous element found in the system, the contractor
should lodge police case immediately under intimation to concern Manager/City Engineer.
23) Material consumption register in prescribed format should be maintained by the contractor.
During the visit of Engineer - in - charge if required it should be produced.
24) “The Contractor” shall operate and utilize all the control and monitoring systems, provided
and if found to be necessary and if approved by the engineer, shall make adjustments within the
operating range of the control system and equipment so that the plant operation matches the
25) “RMC” shall directly pay all the power bill to PGVCL but the Contractor will be required to
furnished Electricity Consumption in the Schedules provided.
a) Telephone bills, if any, will have to be paid by the successful bidder. No
reimbursement shall be made.
b) Electric/Battery operated flow meter has to maintain by successful bidder. In case
failure of batteries, same has to be replaced by successful bidder at his own cost.
26) All miscellaneous items, for example, vehicles, tools, testing equipment, cleaning or green
keeping equipment, security and safety equipment, electrical fixtures, etc shall be provided by the
Contractor at his expense.
27) The Contractor shall provide experienced managerial, technical, supervisory, administrative
and non-technical personnel and labour necessary to operate and maintain the plant in a
scientific way.
a) The qualification and capability of the Contractor's personnel shall be appropriate for the task
they are assigned to perform. The staff provided shall be fully trained in the operation of the
Sewage Treatment Plant before being given responsibility for operating any part of the plant. If in
the opinion of the Engineer, any member of the Contractors staff is considered to be insufficiently
skilled or otherwise inappropriate for the task he is required to perform, he shall be replaced by the
Contract with a person with the appropriate skills and experience for the task, to the approval of the
b) The Curriculum Vite(CV) /Resumes of the Contractors key personnel shall be submitted to the
Engineer for acceptance at least 7 days before the anticipated commencement of the O & M period.
Any change of personnel shall be promptly informed to the Engineer within a day's time. Normal
time duty hours for the contractors' operation & maintenance personnel may be modified/changed
as necessary and agreed by the Engineer. A rotating shift schedule shall be established by the
Contractor and agreed by the Engineer which will ensure that an adequate number of the
Contractor's staff, is on duty at Plants 24 hours per day, 7 days per Week, including all holidays.
c) The engineer-in-charge is authorized to make changes in shift arrangement and number of
personnel according to O&M requirement.
28) a) The Contractor shall be responsible for safety on Site during the Comprehensive O & M of
the Works by the Contractor.
b) The Contractor's duties with respect to Safety shall include the following:
i) Utilize safety awareness procedures in every element of operation and
ii) Give emphasis to site including:
* Safe working and safety procedures as per rules and regulations of Governments
regarding use of protective clothing, gloves, boots and helmet etc.
* Cleanliness of the plants as a whole.
* Awareness of hazardous conditions and accident reporting and necessary
* Safe practice
29) The Contractor shall adhere to the manufacturers' recommendations with respect to equipment
maintenance, the type and grades of lubricants to be used. Frequency of lubrication, adjustments
to be made regularly and recommended spares to be heldin store.
30) The Contractor shall be responsible for:
a) The maintenance of electrical, mechanical instrument civil work, plumbing and drainage
b) General Building Maintenance and housekeeping
c) Full maintenance of the site services, cabling and earthling systems, together with the
site road lighting system. Painting of all mechanical structures which are open to sky
once in 2 Years of contract period (i.e. at the end of second year) at contractor's own
d) Site maintenance including the upkeep of landscaped areas.
The building services and housekeeping maintenance shall be undertaken on all building and
services installation.
The Contractor shall ensure that all unwanted or redundant items are removed from the
building and sites. Depending on their condition such items shall either be placed into storage or
disposed off site.
31) The Employer reserves the right to arrange the visits of VIP's dignitaries, public representatives
and other persons of Social or Political repute, any organization as and when necessary, to the
Sewerage Treatment Plant/Pumping Station. The Contractor shall offer full cooperation to the
RMC on the occasions of such visits.
32) On the date of Contract Completion or if the Contract is terminated, all the installations,
works and equipment placed under the Contractor's
responsibility shall be handed over to the Employer, at no cost, in good working order. The
Employer may perform any inspections, tests or expert appraisals he
shall consider necessary with a view to checking that the property is in good working
order and will certify to that effect to the Contractor while taking over.
33) For smooth & efficient O & M of the plant, and in case of emergency just like fire, fault, accidents,
or other rescues operation, the contractor must keep one two-wheeler vehicle (Motorcycle /
Scooter) with seating arrangement at Sewerage Treatment Plant/Pumping Station in working
condition for 24 hours of a day & 365 days of the year for the whole contract period.
34) While handing over the spares to the contractor, Contractor should maintain the record of
spares of inventory of utilize the spares.
35) In the event of any dispute or difference arising, the Jurisdiction of the court shall be Rajkot
(Gujarat) only.
Authorized Signature with
Add. Asst. Engineer Dy.Ex.Engineer Add. City Engineer
TERMS AND CONDITIONS FOR PAYMENT (PART – 2)
on equal monthly instalment basis subject to terms & conditions mentioned in Price bid.
2) If supply of raw sewage is disturbed for want of electricity, breakage of line or machinery being
out of order or due to some other reasons, contractor shall be paid for all days.
3) The maximum period of non-supply of raw sewage will be 15 days beyond that contractor shall
have to demobilize some personnel and accordingly the payment will be reduced.
4) Payment to person engaged (at fixed rate by the contractor) for work shall be made according to
grade of work. If any court case is filed or administrative problem arises for short payment, the
contractor shall be entirely responsible for it.
5) Contractor shall be vigilant as under for constant operation of supply and distribution;
a) Supervision of repairing work shall be done by contractor himself or some experience
person shall be engaged for it, and site shall be visited once a day to see that proper
operation is done. And for general repairs, skilled persons shall be engaged for it.
b) Before starting the work at the site and undertaking operation of work, verification of
persons engaged for it shall be made by officer-in- charge, whether they have required
experience for it. Even after entrusting responsibility of operation of scheme to
contractor, officer of RMC shall have absolute right for such verification.
c) For recovery of compensation for absence of operator;
i) Contractor shall verify whether operation works done vigilantly or not, and for
that he will keep continuous awareness. In case of any sabotage, break down
during operation or unavoidable circumstances arise immediate report shall be
made to engineer in-charge, so that immediate action can be taken to maintain
continuous supply of water. If it is necessary, department shall take action.
ii) Operator engaged for the work shall not leave premise. and shall remain
constantly present during repairing work until repair work is completed.
iii) If any employee is found absent by any officer of RMC and if wastage of
water is noticed, necessary action shall be taken accordingly.
iv) Contractor shall repair the system damaged due to faulty operation or
ordinary maintenance, at his cost.
v) This work involves operation of valve, repairing, servicing etc.
d) Operator shall prepare shift duty register and shall obtain permission from in- charge
Engineer before implementing the same. If any change is required in any kind of shift
duty it may be done with permission of engineer-in-charge. Operation shall be shifted to
other place as per written instructions of Engineer-in-charge. There shall be no dispute
e) Details of daily work load entrusted to operators and his assistants engaged shall be
kept ready at the site of plant for scrutiny of engineer-in-charge.
6) Instructions for operation:
Contractor shall ensure that operator engaged by him holds know how about operating valves and
aerators as well as electrical and mechanical component.
7) For any default noticed it may be mentioned on notice board at pumping station site. Contractor
shall bring necessary material, manpower, T&P and vehicles for repairs. If power supply fails
operator shall immediately inform the engineer-in-charge or his representative by telephone and
file a complaint about it with persons concerned of PGVCL on Telephone. No unauthorized person
shall be allowed in the premises of department. Contractor shall be responsible for the security of all
the materials on distribution system and machinery under pumping station. During the charge of
contractor, he shall be responsible for any theft or accident, and no compensation shall be paid by
the department. During charge of contractor if any default to any implement has occurred
contractor shall get it repaired and for that no extra payment shall be made.
Authorized Signature with
Add. Asst. Engineer Dy.Ex.Engineer Add. City Engineer
TECHNICAL SPECIFICATIONS AND SCOPE OF SERVICES
Comprehensive Operation and Maintenance of following works for the period of 24 months from the date
The contractor would be responsible for smooth, efficient & satisfactory Comprehensive operation &
maintenance and repairing, replacement of spares, any works related to Pumping stations and pipeline
on the round clock basis for the period of 24 calendar months from the date of contract of pumping station
shortly described as above.
1) The scope of the contractor includes operation, maintenance & replacement of spares.
2) The scope of work also includes to provide necessary tools and tackles for day- to-day O&M routine
maintenance, preventive maintenance and break down maintenance.
3) Also, minor and major repairs to the equipment involved in the plant have to be carried out by
the contractors during O&M period.
4) The scope also includes cleaning of inlet chamber and, removing of foreign materials like debris,
sand, fish, frogs or any other dead or live animals and also cleaning of strainers of each pump so that
24 hrs. and also de silting of wet well once in year. (Above mentioned cleaning should be strictly done
after prior permission of Rajkot Municipal Corporation)
5) Manually Cleaning of Inlet Chamber or wet well is strictly prohibited.
6) The disposal of the foreign particles like sand, dead or alive animals etc. from all the units of the
pumping station to suitable place as shown by RMC will be in the scope of contractor.
7) The scope of works also includes the calibration of all meters and laboratory equipment’s e.g.
pressure gauge, Ammeter, voltmeter, relay, trisector meter, DO meter, PH meter, Energy meters,
temp scanners, flow meters etc. for measurement of accurate readings.
8) The scope of work of contractor includes operation & maintenance of 11 KV incoming line,
Lighting Arresters, D.O. fuse, earthing works, or any other maintenance required on our D P structure
and transformer of RMC side.
All these capacitor panel must be kept in working condition to keep PGVCL power factor maintained by the
contractor. Any spares required to keep capacitor panel in working condition is in the scope of the
contractor. The spares required for LT capacitor panel must be procured and replaced immediately, if
required. Any penalty levied by PGVCL on account of poor power factor will be recovered from the
contractor from his monthly O&M bill Penalty towards not maintaining PF.
The scope of work includes attending of all types of cable faults for pump motor set, street light etc.
1) Drawl of raw sewage and its treatment and transfer of treated water by means of system, control
and operation of plant.
2) Routine maintenance of all buildings, transmission main, installation and equipment’s and area
lighting, gardening.
3) Management of the plant in administrative and financial operations connected to the plant
4) All sluice valve/B.F. Valves/Air Valves/gates, Bypass valve open Channel etc., to be kept under
working condition.
5) Area lighting – The premises of various works are provided with mercury/sodium vapor lamps,
fluorescent tubes and LED lights also ceiling fans/exhaust fans inside the various structures. Daily
on/off operation and routine cleaning of all type of electric fixtures. Replacement of
lamps/Tubes/Fans in case of failure at contractor’s cost.
6) Maintenance of garden – Normally watering the trees once a day or more if required. Grass
cutting, removal of shrubs, weeds, around tree to be done as directed. Remarking the ponds
around the tree after loosening with soil with supply of additional earth, if required. Cutting of
branches, if required for straight growth of tree/plant and development of garden.
7) Roads to be kept neat and clean.
8) All buildings, bathroom, toilet to be kept swept, cleaned washed daily.
Consumable requirement for cleaning such as acid, Harpic, phenyl, air freshener, washing powder,
brooms, wire brushes, duster, bamboos, toilet shop, lotion waste, kharata shall be provided
and used as required. All ventilators, windows/doors to be clean and good condition.
9) To keep watch on overflowing of sewage, If such overflow take place the Bidder shall have
to bear the damages caused to surrounding properties.
10) The contractor will be held responsible for the following:
(i) Operate and maintain all units and equipment’s of the pumping station as per the
requirement of the process to meet continuously and consistently pumping.
(ii) Attend breakdown of civil, mechanical, electrical, piping and instrumentation works and
maintain the plant and equipment good repair throughout the Contract Period;
(iii) Maintain the STP/pumping station and the premises as per the standards detailed by the
(iv) Carry out regular and frequent sampling, analysis and result recording of raw and treated
sewage as per the procedures laid out by the Owner and in conformity with standard methods.
(v) Employ appropriate and skilled manpower, provide all tools, tackles, glassware and chemicals
required for effective implementation of the Services detailed above. Bidder shall be responsible
for repairs of instruments.
For the smooth running of the pumping station all the required equipment, machineries, units’
accessories, major and minor spares consumables, greases, lubricating all cleaning agents,
packing, rubber sheet, all hardware, required quantity of white wash, oil paint color, all types of
epoxy paint, material required for houses keeping and cleaning etc. are to be brought by the
contractor. The quality of all consumable and spare etc. i.e. technical requirements as per
manufacture recommendation shall remain unchanged.
11) To remove dewatered sludge screen and grit deaerator etc. and loading the same into vehicle
and conveying and unloading the same at required place as suggested by RMC.
The contractor shall carryout cement paint/ enamel paint/ white wash for exterior finish of
civil units once in a period of two years at the end of first year of O & M of the plant and
shall carry out painting on mechanical equipment’s/above ground pipe-lines/ hand
railing/electrical poles/DP Structures/lighting brackets/Elect. Panels/Elect. DBs as per above.
12) The contractor shall provide necessary tools and tackles for day-to-day routine maintenance,
preventive maintenance and break down maintenance. Also minor and major repairs to the
equipment involved in the plant have to be carried out by the contractor during the O & M
period. Contractor to submit report, on the major repairs required to be carried out and how
these repairs will be undertaken, to the Engineer and obtain written approval from the Engineer
before carrying out any major repairs.
13) The contractor shall hand over the pumping station back to RMC on expiry of his contract in fully
working condition satisfying the requirement of treated sewage. All the civil structure and
electrical, mechanical and instrumentation including standby shall be in perfectly working
deemed to cover all the Contractor's obligations under the contract and all matters and things
necessary for the operation and maintenance of the pumping station. Particular requirements set
forth in the Specification are given without prejudice to the aforementioned general obligations of
the contractor.
15) The qualifications and capability of the Contractor's personnel shall be appropriate for the task
they are assigned to perform. The staff provided shall be fully trained in the operation of the
pumping station before being given responsibility for operating any part of the pumping station. If
in the opinion of the Engineer, any member of the Contractors staff is considered to be
insufficiently skilled or otherwise inappropriate for the task he is required to perform, he shall
be replaced by the contractor with a person with the appropriate skills and experience for
the task, to the approval of the Engineer.
16) Contractor shall employ minimum manpower as per qualification and experience mentioned in
schedule for establishment.
17) The staff of Contractor will always remain in contact with Engineer and follow his instruction.
18) The Contractor will comply with all safety rules and regulations and all interdisciplinary
measures as followed by the Corporation. The Corporation will not be responsible for any
accident/ injury to the staff of the Contractor. Further, the Corporation will not provide any
insurance or medical facility to the staff of Contractor.
19) All Central/ State Government/ Semi-Government/ Local Body's rules regulation pertaining to this
contract, all legal formalities pertaining to provident fund, factory act, all legal formalities shall be
followed and observed by the contractor without any extra cost to the Corporation.
Please note that failure in complying so, all liabilities arising as per laws will be to the
contractor's account.
20) Due to strike by the Contractor's employees, the operation and maintenance of pumping
station must not be affected and the property of RMC should not be damaged. In such case an
dispute / discrepancy occurs the decision of Add. City Engineer will be final and will be binding to
the contractor. Also if any expense will be made by RMC, it will be deducted from Contractor's
21) The duration of the contract shall be for 02 years. However, Corporation reserves the right
to terminate the contract at any time by giving 03 months’ notice to the Contractor.
22) Guilty person or indiscipline person shall not be employed by the Contractor.
23) The contractor shall carryout the maintenance of the pumping station installations in accordance
with the requirements of the O & M Manual and also to the approved maintenance plan as
mutually agreed.
24) To operate and maintain the pumping station and equipment in accordance with the aim and
purpose of pumping. The pumping station and equipment covered under the above contract will
be promptly attended by the contractor including any "Trouble shooting" to ensure smooth and
trouble-free operation. The contractor will be responsible for smooth and satisfactory operation
and maintenance of the pumping station on the round the clock basis for a Accounting year period
from the date of taking over the pumping station.
25) The employer shall check the operation of the pumping station or designate an organization of
his choice to carryout inspections. The employer or the organization appointed by him shall check
that the Contractor is performing the tasks for which he is responsible with due diligence.
26) Before any inspection, the employer shall give prior notice of three days to the contractor,
indicating the names(s) of the person(s) empowered to carry out such inspection in the name
of the employer.
27) This work is also inclusive of painting of plants as per following schedule and paint shall be of
the same specification as described in respective unit/ mechanism as per original specification of
the executed work.
Sr. Item Duration
1. Civil work Once in two years i.e at the end of 1st year of O & M
2. Doors and windows ---do----
3. Shutters, grills, collapsible gate etc ---do----
4. All H.T./ L.T. panels ---do----
5. All process equipment with ---do---
its accessories and GI railings etc.
6. Street / flood light pole ---do----
7. Pump sets, valves, C.I./DI Lines- ---do----
fittings, Air Line, sluice gate, etc.
Note : However, if any unit mechanism will found to have some defect in paint work at any
time, the Contractor has to repaint the same under the instruction of Add. City Engineer /
Deputy Executive Engineer.
28) Agency has to close all Dove/Bird entry in Pump room/Penel Rooms Properly with necessary Bird
Net/Screens. Necessary work requires to full fill this task and to keep all indoor premises free from
bird is in scope of agency on their own expense.
29) Agency has to maintain all existing furniture in proper good maintain condition at site. Same will
provide with new if it is required at site. (Minimum Qty of furniture to provide at site- Chair-
nos. /Steel Table- 02 Nos.)
30) All indoor and outdoor site premises has kept neat and clean properly and maintain it free from
dirt/dust/waste is responsibility of contract agency on daily basis.
Seal & Signature of Contractor
Technical Details of Pumping Station
1. Name of SPS: Bajarangvadi Main Pumping Station
SR. NO. PARTICULARS QUANTITY
1. Sr No. Pump Type Flow Head Motor Rating Make
M3 /Hr KW(HP)/Make
SUBMERGED SEWAGE NON 6 Nos
CLOG VERTICAL PUMP SET (3 W + 3 S)
SUBMERSIBLE DRY MOTOR
2 DREDGING PUMP PUMP- MOTOR 1 Nos
SUBMERSIBLE NON CLOG
PORTABLE DEWATERING PUMPSET
Voltage variation : 415 V + 10% Frequency variation: 50 Hz. + 3%
3. Sluice Valves / Non return Valves / Manual-Mechanical screens / Pipes, fittings, bends,
distance pieces, metallic expansion bellows, bypass valve arrangement etc. Lot
4. E O T Crane with electric hoist / manual Chain Pulley Lot
All other miscellaneous items necessary for completing the installation and
5. commissioning of the equipment under this contract, as per the existing code of Lot
6 LT Panel, HT Panel, APFC Panel and Starter Panels Cables Lot
7 Electrical Wiring, Lighting and LCS Lot
8 400-KVA DG (Greaves Cotton) 01- Nos
9 11-KV Switchyard Lot
10 Transformer 400-KVA, T&R 02- Nos
11 Flow Meter, Level Sensor with all accessories (Size-700mm) 01- Nos
12 Type of existing Electrical Connection 243 kva HT
13 PC & Printer System, OFFICE FURNITURE, LADDER etc. Lot
1) Above mentioned machinery with allied starter panel, cables, accessories, MCCB, Transformer/Switch
yard, VCB & allied electrifications etc.
2) Rajkot Municipal corporation reserves rights to make any suitable change/modification / alteration /
adding or removing any of the machinery at any time during contract period & such machineries
operation & required Comprehensive maintenance shall be bound to the contractor.
3) The operation and maintenance of the additional VCB Panel to be installed in the future will also be done
4) The comprehensive operation and maintenance and installation of the additional submersible pump set to
be installed as per the requirement will also have to be done by the agency throughout the contract period
, the machinery will be provided by RMC.
Seal & Signature of Contractor
SCHEDULE FOR ESTABLISHMENT
The contractor shall employ the minimum staff for each Pumping station as under with
qualification and experience stated below, Contractor may employ additional staff over
and above minimum prescribed as per his requirement in order to run the system
efficiently. The staff mention below its obligatory.
Sr. Designation Qualification Experience No. of
1 Pump Operator Min. 1 years’
(Semi Skilled person). 10 th Pass experience of WTP
or PS O & M Work.
2 Helper / Mali / 7 th pass, or literate 01 Yr Valve
Sweeper (Un Skilled). Unskilled, physically fit
The above staff shall be distributed in three shift as per instructions of officer in- charge.
The arrangement of reliever for weekly off/all holidays etc. shall be made by the
contractor separately. RMC can optimized above mentioned staff as per instruction of
officer in-charge.
The preferable shift timing will be as under ;
General shift: 09.00 Hrs to 18.00 Hrs
1st Shift: 08:00 Hrs to 16:00 Hrs
2nd Shift: 16:00 Hrs to 24:00 Hrs
3rd Shift: 00:00 Hrs to 08:00 Hrs (Night)
Proposed Shift Matrix
Sr Deployment of
N Manpower 1st Shift 2nd Shift 3rd Shift TOTAL
1 Pump Operator 01 01 01
Agency Staff Rules: -
1. Deployed all Staff Has to follow all RMC rules and regulation with all
2. All deployed staff will not do any misbehave, indiscipline, Physical
misconduct, fight with any person and RMC official also not do any illegal
or criminal or unlawful activity at site and SPS Premises. if such incident or
activity occur at site by any of agency staff then contractor has to replace
that person. And any instruction or decision by RMC official regarding
matter shall be bound to agency.
3. All Staff is Prohibited to stay in SPS Premises after completion of their duty
4. No Outside person shall be allowed to enter in premises without prior RMC
5. All Govt. law and any Govt. department GR/Orders regarding contractor
staff or labour staff has to fulfil or comply by contract agency.
6. To comply and follow all above mentioned RMC rules is fully responsibility
of Contract agency.
7. To maintain all Site premises with full discipline and keep free from any
unwanted and illegal activities is the responsibility of contract agency and
its appointed staff.
Authorized Signature
with seal of Bidder
Add. Asst. Engineer Dy.Ex.Engineer Add. City Engineer
SPECIAL CONDITION & SAFETY INSTRUCTIONS FOR WET WELL DE- SILTING
Whenever required to do de-silting of wet well, Additional work order shall be issued to contractor
for wet well de-silting work by concern in charge officer and contractor shall be responsible to complete
work as per the instruction’s tender/work order.
Payment rate for Sump/Wet well De-Silting Work is as under.
For de-silting of entire Wet well and Screen
SPECIFIC RATE FOR DE-SILTING Chamber, Rs. 1,00,000/- Lum sum Per Job per
At the time of wet well de-silting work the following safety measures shall be strictly followed by the
concern agency/contractor.
1) Contractor has to check the level of hydrogen sulphate and oxygen with appropriate gas detector
and test lamp before entering cleaning man power in to the wet well. If non workable situation found in
wet well due to poisonous gases, then same will be vented with blowing air by exhaust air blower by
contractor. During wet well de-silting work fresh air circulation will remain continuous and necessary
arrangement of Exhaust Fan/Air Blower, Lighting shall be done by contractor as per the requirement.
2) All concern wet well cleaning staff must use/wear artificial respiratory system before entering in to the
wet well. Also all cleaning staff shall wear other necessary safety apparels for safety of body from
harmful bacteria and other insects.
3) All cleaning staff shall must wear harness safety belt wet well cleaning work due to which any
person can easily lift out in case in problem of respiration, if possible, staff will also wear gas mask for
proper safety cause.
4) Any apparatus/tools/tackles and other items necessary for wet well cleaning will be provided to
staff tide with Rope and slowly lower down if required.
5) After completion of wet well cleaning work each day/ at time of come back from wet well all staff
shall provide with sufficient clean water and shop for bath/wash body in concern to hygienic
matter. All required arrangement of clean water and shop shall be done by contractor.
6) During wet well cleaning work or during open wet well situation minimum 02 Agency person/supervisor
shall remain present to super wise work concern safety cause.
7) Before starting this type, work contractor shall check and confirm health of all cleaning staff that all person
should sufficient capable to carry out this work.
8) If contractor do not have toxic gas detector, harness belt/gas mask then RMC will provide all necessary
appeals/items if it available with RMC otherwise same will arrange by contractor on his own cost.
9) For all wet well cleaning staff hall boot-helmet is mandatory to wear in wet well and it must be arranged
10) Wet well de-silting work shall remain continue during night hours as in coming sewage quantity is low/less
in night hours. During night hours all supervision of work and cleaning equipment’s shall be
responsibility of contractor.
11) This work is concern with general public health, therefore wet well de-silting work remain
continuous in all shifts with arrangement of labour. De-silting work will arrange and carry out in
such a way that it will complete in minimum possible time. If it requires more number of man
power/labour person during work to complete work in time bound situation then contractor is responsible
to increase Man power as per instruction of concern in charge Engineer.
12) De-silting work is carrying out with using Spinning Wheel bucket (Charkhee). 02 set of spinning wheel
bucket (Charkhee) will be used for de-silting work if it require by RMC.
13) It may require performing de-silting work during running/operational Pumping Station then same
will be performed by contractor. For that it required to bypass arrangement to bypass in coming sewage
in sump from network. Same will be arranged by agency.
14) Wet well de-silting work will also include cleaning of all incoming sump pipeline, manual coarse screen
with screen chamber etc. as per satisfactorily to concern in charge Engineer and it will be responsibility of
15) All necessary arrangement of tool/tackles, Rope, Phavada, Ghamela, spinning wheel, halogen light
fixtures, Fan etc. shall be done by Contractor as per RMC’s staff instruction. Contractor can use
necessary Electric Power supply of RMC for this work at free of cost.
16) For De-silt work RMC may provide necessary de-water pump, light, exhaust fan etc. on availability
with department on written demand of agency. In this case if any damage or fault occurs in
provided items/spares same will be repaired by agency by their own expense. Same will be replaced
with new by agency if it required.
17) All de-silting materials like rubbish/mud etc. of wet well will be disposed of by contractor as per
instructions. For de-silting materials disposed purpose arrangement of vehicle, loading, unloading,
etc. shall be done by contractor. For this work vehicle rent will be paid separately to contractor by
RMC as per prevail rate of SOR.
18) All rubbish, mud or de-silt material must not spread out/fall on the way on road during
transportation of material required care for that taken by contractor. For that Truck-Tractor shall be
covered with tal-patri/plastic cloths.
19) After completion of this work any waste silt material is laying in wet well or not shall be properly checked
by contractor. Also for this matter all work responsibility shall consider of contractor. After
completion of all this work wet well’s all manhole, opening will be covered/shut off/closed properly by
20) Eligible contractor to whom work rate is approved by RMC will approach/Contact to in charge engineer
for planning of work, Numbers of labor, arrangement of tools, tackle, machineries etc. prior to
mutual permission for this work.
21) Agency will submit copy of accident/work compensation policy for all labor/person which are
involved for de-silt work at site before starting of work at site.
22) During wet well de-silting work if any accident or unwanted injury happen with staff/person of contractor
then its total responsibility will remain of contractor on his own cost. RMC will not be
responsible and will not compensate any amount for such accident of injury of contractor’s
23) If it requires stopping in coming sewage water at inlet of sump with sand bags, obstacles, or any alternate
arrangements than it will be arrange by contractor on his cost. Same obstacles, sand bags etc. will
remove from inlet chamber, sump properly by him.
24) Rate shown in ‘SPECIFIC RATE FOR DE-SILTING’ is for whole cleaning of wet well to concern Sewage
Pumping Station for one time. And this rate is on lump sum basis. Tenders on/below percentage shall be
applicable on approved lump sum rate of this de-silt work.
25) No running bill shall issue to Contractor for this work. Contractors’ work bill will process only after
satisfactory completion work and cleaning of work site.
26) If any time delay beyond the stipulated period of this work then Rs. 500/- penalty shall be
imposed per day in and the same will be deducted from the contractor’s work bill. If there will be
any effect of this work during cleaning of wet well on any other works then appropriate penalty
will be decided by the City Engineer (Spl.) Drainage Department and it will be acceptable to contractor.
27) Agency is bound to carry out this de-silt work at any other drainage Pumping station sites of RMC
if it is required. Separate WO will issued by concerned Engineer In Charge.
Authorized Signature
with seal of Bidder
Add. Asst. Engineer Dy.Ex.Engineer Add. City Engineer
Penalty provisions:
Without consent of Engineer in charge of RMC, or force Majeure contractor staff
remains absent, penalty charge will be imposed by Dy Executive Engineer in the running bill as
provided below.
1. Pump Operator Rs.650/- Per day per person
2. Helper/ Sweeper/ Mali Rs.600/- Per day per person
3. Non cleaning of Pumping Station premises Rs.600/- Per day
4. Non cleaning of screening chamber Rs.600/- Per day.
5. Non-Wearing of Dress code and I-Card Rs.100/- Per day
1) All pumps be kept ready for operation. If all pump is not ready for operation for work more than five
days RMC will deduct Rs.500/-per day per pump as penalty from their monthly bill.
2) If fault occurs in transformer, H.T. breaker, D.G. Set, PLC Panel-SCADA Panel, Flow Meter,
Mechanical Screen, EOT or any electrical machineries that should be rectified or faulty parts should be
replaced within Seven Days, failing which penalty of Rs.600/- Per day will be deducted from the
contractor's bill.
3) The machinery which is not in spare and falls into fault shall be repaired with immediate effect
i.e. within 48 hours, failing which a penalty of 1000 per day will be charged for delay.
4) Contractor shall maintain a minimum power factor of 0.95 or higher at any point of time. If power
factor not maintain by contactor RMC will deduct Rs.5000/- as penalty from their monthly running bill.
In case of non-maintenance of power factor, if any penalty levied by power supply company in
Electricity Bill, the same will be recovered from the agency from its monthly running bill.
5) For the breach of any other contract condition, City Engineer or Municipal Commissioner’s decision shall
be bound to the Contractor.
6) A) If any department of RMC asked for documentary evidence towards the fulfillment of any provisions
made under any Act /Rules/ Regulations made by Government of India / Government of Gujarat/ RMC,
it is mandatory for contractor to submit such documentary evidence within stipulated time frame of
7) B) If contractor fails to provide / submit such documentary evidence for fulfillment of Acts / Provisions
mentioned above within stipulated time frame of notice it shall leads to penalty shall be imposed to
contract as may be deemed fit by Commissioner, RMC or City Engineer (Sp), which is bound to the
contractor or entire security deposit can be forfeited.
8) Further for any breach of contract conditions during O&M penalty shall be levied on contractor as
deemed fit by Add. City Engineer and contractor shall be bound to accept the same.
DOCUMENTS RECORDS / LOG BOOK
1) The contractor will be responsible for keeping up to date records of documents and maintaining
every day log book relating to various analysis performed and to prepare and submit a daily report
of Sewage Treatment Plant performance. The contractor shall maintain and updated log book and
details of operational parameters like pumping hours, Amperes, Flow meter reading, H.T. Voltage,
Power Factor, energy meter reading, pressure and other reading required are recorded in every
shift at regular interval e.g. hourly or as agreed mutually (by RMC).
2) Printing of log sheets, registers and all necessary stationery required for maintaining records of
operations and maintenances has to be arranged by the Contractor at his cost. Format of log sheets,
registers will be made available to the successful tenderer by the RMC.
ADDITIONAL SCOPE OF WORK
3) For additional work, if any, which is not included in the scope at present shall be executed by the
contractor on authorization in writing from the RMC.
4) The rate of such additional work will be worked out by the Contractor based on the cost of
materials and labour and shall be furnished to the RMC. The contractor shall be entitled for full cost
of materials, direct labour and cost of operation of equipment/machinery etc. required to execute
GENERAL ROUTINE MAINTENANCE
General routine preventive maintenance schedule for various equipment’s shall be adopted
from O&M Manual. However, the general routine maintenance to be carried out by the
Contractor’s personnel will include but not limited to the following:
a) If it is observed that power consumption per MLD of water treated is increased, the
contractor has to trace out the fault and rectify the same to bring to the standard Value.
b) De-weeding and cleaning of the Transformer yard and other places.
c) Drying and refilling of silica gel in the breather of the transformer
d) Regular watering on the earth-pits.
e) Check for any oil leak in the transformer and intimating and repairing of the same.
f) Air blowing of motors, H.T & L.T. panel etc.
g) Check for any loose connection in all electrical equipment and rectification of the same.
h) Replacement of gland packing for the pump, sluice valves etc. whenever required.
i) Greasing of bearing and lubricating all moving parts as per the schedule.
j) Tightening of all loose nut-bolts and other fasteners.
k) Cleaning of sump and strainer of each pump at regular intervals.
l) Lubricating and test operation of the valves.
m) General cleaning of all equipment’s and building.
n) Checking and replacement of bulbs, tubes, chokes, starters, switches, control etc.
thorough out plant and including street and head lights.
o) Watering of plants and tree.
PREVENTIVE MAINTENANCE CHECKS:
The contractor shall adopt a preventive maintenance check’s schedule as agreed mutually between
the Contractor and the Employer. The preventive maintenance checks and their tasks frequencies
will not be limited to the following:
Checks to be performed daily
a) Vibration in the pump sets, moving assemblies etc.
c) Rise in temperature of bearings in motor, in moving parts and other unites.
d) Working of gauges and other measuring devices.
e) Observations on water quality.
Checks to be performed weekly
a) Pipeline leakages
b) Tightness of all electrical connections
c) Tightness of all cable connections
d) Temperature rise due t loose connections
e) Watering of earthing pits
f) Operation of all sluice and butterfly valves, scour and pressure relief valves, gates and air valves, bypass
g) Current and voltages in all electrical equipment’s.
Checks to be performed monthly
a) Gland packing
b) Wear and tear of moving parts
c) Adoption of electrical energy conservation method and energy consumption.
d) Electrical contacts
f) Metering of electrical
equipment’s Checks to be performed
a) Relay testing and calibration, if possible, of meters, gauges, instruments, flow meters and
temperature scanner panel and flow indicator unit.DO meter, PH meter.
b) Speed of motors
c) Level gauges and flow meters signals.
Checks to be performed bi-annually
a) Cleaning, checking/tightening of HT and LT circuit/panel
b) Tightening of RTCC
c) Auxiliary DB, Capacitor bank
d) Battery and Battery charger Checks to be performed annually
e) Overhauling requirement of all equipment
f) Improvement required if any in operation of plant
g) Testing and calibration of all instruments
h) 11 KV VCB cleaning, testing.
i) Transformer cleaning, checking silica gel, oil checking filtering / replacing.
MINOR REPAIR GENERALLY ENCOUNTERED IN THE Pumping Station
Electrical works
a) For H.T. Installations
i) Replacement of jumpers
ii) Replacement of insulator (Porcelain)
iii) Replacement of Air-Break Switch b)
b) For Both H.T. & L.T. Installations
i) Replacement of no-volt coil for VCB
ii) Replacement of Cable lugs including terminations
iii) Replacement of burnt out HRC fuses
iv) Replacement of moving and fixed contacts or contractors
v) Repairs to isolators and switch fuse units and replacement of it and fuse base units.
a) Replacement of coupling bolt and nuts including rubber bushes
b) Replacement of worn out impeller nut
c) Replacement of spindle nut in the sluice valve.
d) Replacement of terminal plate in the motor
e) Replacement of faulty/dead spares in the battery charger and battery control panel.
f) Replacement of gland packing, graphite packing from the pump sets.
RMC/GAD/Outword No.385 DT.27/02/2023 Sub:- Regarding ESI Registration for
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical Bid VOL-I-BAJRNGWADI-FINAL-DT.26.8.26.pdf
Technical Bid VOL-II-BAJRNGWADI-FINAL-DT.26.8.26.pdf
e TENDER NOTICE Bajarangwadi.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .