Tender Value
₹81.8 L
EMD Value
₹82,000
Closing Date
14 Sept 2026, 6:00 pm
The Chief Officer, Amod Municipality, Amod
Road construction work from dumping site to STP in Amod Municipality Area.
340150
2025-2026
Open
Civil - All
Works
Bharuch
1 document required · 1 mandatory
₹2,832
The Chief Officer, Amod Municipality, Amod
₹82,000
29 Aug 2026
29 Aug 2026
29 Aug 2026
14 Sept 2026
29 Aug 2026
NAME OF WORK :- CONSTRUCTION OF 400 MT ROAD AT AMOD FOR AMOD NAGAR
DESCRIPTION AMOUNT IN RS
PART- A CONSTRUCTION OF ROAD (CH.0/0 TO
2 PART- B C.D. 900 mm dia (Two Rows) 2 nos
3 PART C- 2x2 Box Culverts
A TOTAL AMOUNT IN RS.
A TOTAL AMOUNT IN RS.
CONTIGENCY CHARGE 2%
NET AMOUNT IN RS.
PMC Municipal Engineer
V S Infratech Amod Nagarpalika
Amod Nagarpalika
NAME OF WORK :- CONSTRUCTION OF 400 MT ROAD AT AMOD FOR AMOD NAGAR PALIKA.
Item Quanties Estimate Rates Total amount
Item Quanties Estimate Rates Total amount
No. estimated Item of work In Figures Unit accorinding
but may be estimated
Earthwork for embankment including breaking clods,
dressing with all lead and lift and including watering
rolling and consolidation of subgrade in layers at O.M.C. Rupees One
to required dry density including filling the depression Hundred Sixty
which occur during the process using power roller 8T Nine and Forty
to 10T.(E) From Borrow area within 3.0KM. lead Four Paisas Only
Construction of granular sub-base Gr-I by providing
coarse graded B.T. machine crushed material satisfying
MOST specification of (grading I) using materials (53
mm to 26.5 mm@ 35 per cent,26.5 mm to 4.75 mm@45 Rupees One
percent,2.36 mm below@20 per cent) including Thousand Sixty
spreading in uniform layer with motor grader on
prepared surface, mixing by mix in place method with Two Paisas Only
rotavator at OMC and compacting with vibratory roller
to achieve the desired density etc. complete.
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam (WMM) in two
layer as per specification and drawing including
premixing the Material with water at OMC in Rupees One
mechanical mix plant carriage of mixed Material by Thousand Four
3 203.00 tipper to site, laying in uniform layers with paver in sub- 1409.92 Hundred Nine Cum
base / base course on well prepared surface and and Ninety Two
compacting with vibratory roller to achieve the desired Paisas Only
density as per MORT&H fifth revision clause-
Providing and laying rubble for appron (each stone
weighting not less than 40Kg.) including and packing Rupees One
and filing in the interestices with quarry-spalls. Thousand Forty
Providing and laying cement concrete 1:2:4 (1- Cement
: 2- Coarse sand : 4- graded stone aggregates 20 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
3481.28 Hundred Eighty Cum
Eight Paisas Only
Cement Concrete Pavement (Construction of un-
reinforced, dowel jointed, plain cement concrete
pavement over a prepared sub base with 53 grade
cement @ 400 kg per cum, coarse and fine aggregate
conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching
and mixing plant as per approved mix design,
transported to site, laid with a fixed form or slip form
paver, spread, compacted and finished in a continuous
6562.78 Hundred Sixty Cum
operation including provision of contraction, expansion, Two and Seventy
construction and longitudinal joints, joint filler, Eight Paisas Only
separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per drawing )
Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in position Rupees Seventy
7 9900.00 complete upto floor two level. 76.21 Six and Twenty Cum
One Paisas Only
Supplying and fixing reinforced concrete heavy duty
non-pressure pipes with collars for culverts carrying
heavy traffic as per IS 458-1991 specifications Rupees Three
including setting the pipes in C.M. 1:2 watering and Thousand Four
8 30.00 laying (to level or slopes) of class NP3 of following 3446.50 Hundred Forty Rmt
internal daimeters.(v) 900mm dia. Six and Fifty
Rupees Forty Five Lacs Forty Eight Thousand Three Hundred Twenty Three and Seventeen Paisas Only
Municipal Engineer Chief Officer
Signature of the Amod Nagar Palika Amod Nagar Palika
Contractor. Amod Amod
I / We am / are willing to carry out the work at…………………. % Below / Above ……….. Percent (should be written in
Figurs and words / Below Above the estimate rates mentioned above Amount of my / Our tender works Out as Under :-
Estimated Amount Put to Estimated Amount Put to
Put to Tander Rs. 4548323.17 Put to Tander Rs.
Signature of the Contractor. Chief Officer
Amod Nagar Palika
Note : All Works shall be carried out as Public works Department Handbook and other specifications pf Division or as directed.
GM\W ov ! AW] H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ 0LJLhGGL ALÒ BF; lJUT D]HA VYJF ;]RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : All the Column in Schedule should be filled in ink or ball pen and Total of the entires in last column should be
2 struck by the contractor under his signature.
GM\W ov Z VG;}lRDF\ AWF BFGFGL lJUTM XFCLYL EZJL VG[ K[<,F BFGFGL GM\WGM ;ZJF/M SZL SM\g8=FS8Z[ 5MTFGL ;CL SZJLP
Note : Rates quoted include clearance of site (Prior commencement of works and at its close ) in all respects and hold good for work
3 under all conditions,site,moisture,weather etc.
[ F NZDF\4:Y/GL sSFDGF\ VFZ\E[ VG[ 5]~ YFI T[ JBT[ f NZ[S ZLT[ ;FO ;]OL SZJFG]\ ;DFJ[X YFI K[ VG[ T[ NZ TDFD 5lZl:YTL 4 :Y/ 4E[H 4 CJFDFG lJU[Z[ C[9/ SFD DF8[
Note : To be continued on additional sheets, if found necessary.
GM\W ov $ H~Z H6FI JWFZFGF SFU/M HM0L RF,] ZFBJ]\
Note : Bidder have to deposit Dismantling Credit FDR/DD to nagar palika at a time of W.O and after disucting
5 dismantling credit from R.A.Bill 01 the FDR will be returned to bidder.
NAME OF WORK :- CONSTRUCTION OF 400 MT ROAD AT AMOD FOR AMOD NAGAR PALIKA.
Sub Estimate :- 900 mm dia C.D. Works Two Row
Item Quanties Estimate Rates Total amount
Item Quanties Estimate Rates Total amount
No. estimated Item of work In Unit accorinding
but may be Figures estimated
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
1 150.60 disposing off the excavated stuff upto 50 Meter lead.(B) 241.79 Cu.Mt.
One and Seventy
Dense or Hard soil
Nine Paisas Only
Providing and filling in foundation with ordinary
Cement concrete M-100 mix and providing necessary
vertical pin headers including formwork, vibrating,
2 12.00 3105.11 Hundred Five Cu.Mt.
ramming and curing complete.
and Eleven Paisas
Providing & filling in foundation with ordinary cement
concrete M 150 mix and providing necessary vertical Rupees Three
pin headers including formwork vibrating ramming & Thousand Four
3 100.80 curing complete. 3475.16 Hundred Seventy Cu.Mt.
Five and Fifteen
Supplying and fixing reinforced concrete heavy duty
non-pressure pipes with collars for culverts carrying Rupees Three
heavy traffic as per IS 458-1991 specifications Thousand Four
4 50.00 including setting the pipes in C.M. 1:2 watering and 3446.50 Hundred Forty Rmt.
laying (to level or slopes) of class NP3 of following Six and Fifty
internal daimeters.(v) 900mm dia. Paisas Only
Construction of Granular Sub Base (for Around the pipe
of C.D.Works) by providing coarse graded machine
crushed B. T. material satisfying MOST Specification of
Grading - I using 53 mm to 26.5 mm @ 30% (M.C.
Metal), 26.5 mm to 4.75 mm @ 60% (M.C.Metal), 2.36 Rupees One
mm below @ 10% (Stone Dust) including spreading in Thousand Sixty
uniform layer with motor grader on prepared surface, Two and Fifty
mixing by mix in place method with rotavator at OMC Two Paisas Only
and compacting with vibratory roller to achieve the
desired density with C.B.R. > 30% etc. complete.
Municipal Engineer Chief Officer
Signature of the Amod Nagar Palika Amod Nagar Palika
Contractor. Amod Amod
I / We am / are willing to carry out the work at…………………. % Below / Above ……….. Percent (should be written in
Figurs and words / Below Above the estimate rates mentioned above Amount of my / Our tender works Out as Under :-
Estimated Amount Put to Estimated Amount Put to
Put to Tander Rs. 683210.75 Put to Tander Rs.
Signature of the Contractor. Chief Officer
Amod Nagar Palika
Note : All Works shall be carried out as Public works Department Handbook and other specifications pf Division or as directed.
GM\W ov ! AW] H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ 0LJLhGGL ALš BF; lJUT D]HA VYJF ;]RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : All the Column in Schedule should be filled in ink or ball pen and Total of the entires in last column should be
2 struck by the contractor under his signature.
GM\W ov Z VG;}lRDF\ AWF BFGFGL lJUTM XFCLYL EZJL VG[ K[<,F BFGFGL GM\WGM ;ZJF/M SZL SM\g8=FS8Z[ 5MTFGL ;CL SZJLP
Note : Rates quoted include clearance of site (Prior commencement of works and at its close ) in all respects and hold good for work under
3 all conditions,site,moisture,weather etc.
8F\S[,F NZDF\4:Y/GL sSFDGF\ VFZ\E[ VG[ 5]~ YFI T[ JBT[ f NZ[S ZLT[ ;FO ;]OL SZJFG]\ ;DFJ[X YFI K[ VG[ T[ NZ TDFD 5lZl:YTL 4 :Y/ 4E[H 4 CJFDFG lJU[Z[ C[9/ SFD DF8[ VD,DF\
Note : To be continued on additional sheets, if found necessary.
GM\W ov $ H~Z H6FI JWFZFGF SFU/M HM0L RF,] ZFBJ]\
Note : Bidder have to deposit Dismantling Credit FDR/DD to nagar palika at a time of W.O and after disucting
5 dismantling credit from R.A.Bill 01 the FDR will be returned to bidder.
NAME OF WORK :- CONSTRUCTION OF 400 MT ROAD AT AMOD FOR AMOD NAGAR PALIKA.
Item Quanties Estimate Rates Total amount
Item Quanties Estimate Rates Total amount
No. estimated Item of work In Figures Unit accorinding
but may be estimated
1 more2 or 3 4 5 6 quantities.
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter Rupees One
lead.(A) Loose or soft soil Hundred
Eight Paisas Only
Excavation for foundation for depth from 1.5 m to
m including sorting out and stacking of useful
materials and disposing off the excavated stuff upto
Meter lead.(A) Loose or soft soil
Nine and Eighty
One Paisas Only
Providing and laying cement concrete 1:3:6 (1-
Cement : 3- Coarse sand : 6- Graded brick bat Rupees Two
aggregate 40mm normal size) and curing complete Thousand Nine
excluding cost of formwork in (A) Foundation and Hundred Seventy
Six and Seventy
Providing laying controlled cement concrete M-250
work with curing complete including the cost of form Rupees Four
work but excluding the rate of reinforcement for Thousand One
4 39.05 reinforced concrete work in. 4143.02 Hundred Forty Cum
( A ) Foundations footings Base of columns and mass Three and Two
concrete. Paisas Only
Providing and laying controlled cement concrete
M.250 and curing complete including the cost of Rupees Five
formwork but excluding the cost of reinforcement for Thousand Nine
5 38.36 reinforced concrete work in (B) Walls, from top of 5949.91 Hundred Forty Cum
foundation to any level Nine and Ninety
One Paisas Only
Providing and laying controlled cement concrete
M.250 and curing complete including the cost of Rupees Five
formwork but excluding the cost of reinforcement for Thousand One
6 20.40 reinforced concrete work in (C) Slab 5179.28 Hundred Seventy Cum
Nine and Twenty
Eight Paisas Only
Providing and laying in position Fe-500/500D TMT Rupees Seventy
Bars reinforcement including cutting bending hooking Two Thousand
and tying complete as per detailed for the following(A) 72601.86 Six Hundred One
Solid Slab and Eighty Six
Providing and Laying controlled cement concrete M-
200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete Rupees Five
work in (K) Vertical and Horizontal its upto floor two Thousand Nine
8 4.23 level. 5949.91 Hundred Forty Cum
Nine and Ninety
One Paisas Only
Providing and laying in position Fe-500/500D TMT
Bars reinforcement including cutting bending hooking
and tying complete as per detailed for the following(A)
Piers (B) abutments (C)R.C.C Returns
Providing G.I 100 mm diameter water spouts including
necessary iron gratings as per drawings Rupees Five
Finishing wall with weather proof exterior emulsion
paint on wall surface two coats to give required shape Rupees One
even shade after thoroughly brushing the surface to Hundred
11 27.22 remove all dirt, and remains of loose powdered 114.53 Fourteen and Sq.mt
materials etc. complete. Fifty Three
Add Contigency 2%
Total 1 box Culverts
Rupees One Hundred Fourteen and Fifty Three Paisas Only
Municipal Engineer Chief Officer
Signature of the Amod Nagar Palika Amod Nagar Palika
Contractor. Amod Amod
I / We am / are willing to carry out the work at…………………. % Below / Above ……….. Percent (should be written in
Figurs and words / Below Above the estimate rates mentioned above Amount of my / Our tender works Out as Under :-
Estimated Amount Put to Estimated Amount Put to
Put to Tander Rs. 1532680.00 Put to Tander Rs.
Signature of the Contractor. Chief Officer
Amod Nagar Palika
Note : All Works shall be carried out as Public works Department Handbook and other specifications pf Division or as directed.
GM\W ov ! AW] H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ 0LJLhGGL ALš BF; lJUT D]HA VYJF ;]RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : All the Column in Schedule should be filled in ink or ball pen and Total of the entires in last column should
2 be struck by the contractor under his signature.
GM\W ov Z VG;}lRDF\ AWF BFGFGL lJUTM XFCLYL EZJL VG[ K[<,F BFGFGL GM\WGM ;ZJF/M SZL SM\g8=FS8Z[ 5MTFGL ;CL SZJLP
Note : Rates quoted include clearance of site (Prior commencement of works and at its close ) in all respects and hold good for work
3 under all conditions,site,moisture,weather etc.
8F\S[,F NZDF\4:Y/GL sSFDGF\ VFZ\E[ VG[ 5]~ YFI T[ JBT[ f NZ[S ZLT[ ;FO ;]OL SZJFG]\ ;DFJ[X YFI K[ VG[ T[ NZ TDFD 5lZl:YTL 4 :Y/ 4E[H 4 CJFDFG lJU[Z[ C[9/ SFD DF8[ VD,DF\
Note : To be continued on additional sheets, if found necessary.
GM\W ov $ H~Z H6FI JWFZFGF SFU/M HM0L RF,] ZFBJ]\
Note : Bidder have to deposit Dismantling Credit FDR/DD to nagar palika at a time of W.O and after disucting
5 dismantling credit from R.A.Bill 01 the FDR will be returned to bidder.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Building Specification Book.pdf
NIT.pdf
SBD-Final.pdf
Site Visit Must Attach.pdf
Term and Conditiontion.pdf
Final Schedul B Combined.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].