Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.8 L+₹3,878.54 (1.03%)Admitted-Fee/PreQual/Technical/Finance 1005 SUB TREASURY THODUPUZHA | IDUKKI | KERALA | 685501 | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | THOMAS SAJU L1 | AKSHAY K R L2 |
|---|---|---|---|---|---|
| 1.00Maintenance | |||||
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.23 | cum | 8,483 ₹61,315.12 Lowest | 8,569.14 ₹61,937.74 |
| 1.00 | 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 21.3 | cum | 10,978.8 ₹2,33,815.5 Lowest | 11,089.79 ₹2,36,179.26 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 20.65 | sqm | 382 ₹7,889.06 Lowest | 386.16 ₹7,974.98 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 77.44 | sqm | 831 ₹64,356.8 Lowest | 839.6 ₹65,022.82 |
| 1.00 | 5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars | 91.06 | kg | 110 ₹10,016.05 Lowest | 111.54 ₹10,156.27 |
Tender Value
₹3.8 L
EMD Value
₹9,532
Closing Date
22 Sept 2026, 9:00 amClosed
ASSISTant engineer
OFFICEOFASSISTANTENGINEER
Rennovation Of Chavarna Thodu
2026_LSGD_869419_5
2/LSGD/ALKD/2026-27
Open Tender
Civil Works - Roads
Item Wise
30 days
Alakkode Panchayat office
Please refer Tender documents.
8 documents required · 8 mandatory
₹845
Yes
₹9,532
Yes
25 Sept 2026
14 Sept 2026
25 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.001 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.23 | cum | - | - |
| 1.002 | 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 21.3 | cum | - | - |
| 1.003 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 20.65 | sqm | - | - |
| 1.004 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 77.45 | sqm | - | - |
| 1.005 | 5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars | 91.06 | kg | - | - |
stage.html
html • 0.02 MB
finance_1473127.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
sbd.pdf
Tender Documents • 1.21 MB
BOQ_1473127.xls
BOQ • 0.30 MB
affi.pdf
Tender Documents • 0.37 MB
sec.pdf
Tender Documents • 0.46 MB
ipact.pdf
Tender Documents • 0.23 MB
prilim.pdf
Tender Documents • 0.39 MB
FOOOOt.pdf
Tender Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .