| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC | ₹3.4 L | 1 | Accepted-AOC lowest |
| 2 | Rejected-Technical | - | - | Rejected-Technical highest bid |
| Sl No | Description | Qty | Unit | P A MUHAMMED L1 | SUDHEESH A T L2 |
|---|---|---|---|---|---|
| 1.00Open well 2.50m dia | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 18.84 | cum | 240.23 ₹4,525.93 Lowest | 252.47 ₹4,756.53 |
| 1.00 | OD336675/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over
areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of
excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly
dressed and Extra for every additional lift of 1.5 m or part thereof in excavation /banking
excavated or stacked materials. All kinds of soil. for FIRST DEPTH (1.50m to 3.00m) | 18.84 | cum | 362.4 ₹6,827.62 Lowest | 380.86 ₹7,175.4 |
| 1.00 | 5.4:Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources) | 1.6 | cum | 11,461.79 ₹18,338.86 Lowest | 12,045.72 ₹19,273.15 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 8.55 | cum | 9,182.6 ₹78,511.23 Lowest | 9,650.42 ₹82,511.09 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.48 | sqm | 360.08 ₹3,052.76 Lowest | 378.43 ₹3,208.33 |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 86.46 | sqm | 288.11 ₹24,909.99 Lowest | 302.78 ₹26,178.36 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 761.25 | kilogram | 104.83 ₹79,801.84 Lowest | 110.17 ₹83,866.91 |
| 1.01 | OD544480/2024-2025:Sinking well in all classes of soil other than rock to lines and levels and plumb by
scooping out form inside and below the steining including the use of dredgers or any other appliance, hire
and labour for knetledge, jetting, dewatering, blasting, vibrating or any other method including removal of
obstacles and dumping the spoil withing a distance of 150 m (wells upto 4.00 m outer dia - initial depth of
3.00 m below spring level. | 1 | metre | 10,288.31 ₹10,288.31 Lowest | 10,812.46 ₹10,812.46 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 40 | hour | 322.21 ₹12,888.4 Lowest | 338.62 ₹13,544.8 |
Tender Value
₹3.4 L
EMD Value
₹8,623
Closing Date
10 Mar 2026, 6:00 pmClosed
AE LIDEW Section Kottathara GP
AE LIDEW Section Kottathara
Construction of Palamoola Well
2026_LSGD_843009_5
TN/005/AE/LIDEW/KTRA/2025-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottathara GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹765
₹8,623
Yes
7 Aug 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Open well 2.50m dia | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.002 | OD336675/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over
areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of
excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly
dressed and Extra for every additional lift of 1.5 m or part thereof in excavation /banking
excavated or stacked materials. All kinds of soil. for FIRST DEPTH (1.50m to 3.00m) | 1 | cum | - | - |
| 1.003 | 5.4:Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources) | - | cum | - | - |
| 1.004 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | - | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.006 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 1 | sqm | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.008 | OD544480/2024-2025:Sinking well in all classes of soil other than rock to lines and levels and plumb by
scooping out form inside and below the steining including the use of dredgers or any other appliance, hire
and labour for knetledge, jetting, dewatering, blasting, vibrating or any other method including removal of
obstacles and dumping the spoil withing a distance of 150 m (wells upto 4.00 m outer dia - initial depth of
3.00 m below spring level. | - | metre | - | - |
| 1.009 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.11 MB
Tendernotice_5.pdf
PDF • 0.05 MB
Tendernotice_6.pdf
PDF • 0.13 MB
SBD204.pdf
Tender Documents • 2.32 MB
BOQ_1422783.xls
BOQ • 0.31 MB
Date.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .