Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹16,892
Closing Date
19 Jun 2026, 11:00 am
Executive Engineer
Jal Shakti Division Shahpur
SH C/O RCC infiltration gallery 10 mtr long
2026_HPIPH_136092_1
EE/JSDS/NIT/2026- 2007-56 dated- 08/06/2026
Open Tender
Civil Works
30 days
Shahpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Executive Engineer
₹16,892
8 Jun 2026
8 Jun 2026
19 Jun 2026
8 Jun 2026
19 Jun 2026
8 Jun 2026
8 Jun 2026 - 19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundations,trenches etc. in earth work lift upto 1.50 mtrs. stacking the excavated soil not more than 3 mtrs. clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20mtrs. Pick, jumper work with in all leads and lifts. | |||||
| 1.01 | Earth work without dewatering | 73.84 | Cum | - | - |
| 1.02 | Earth work with dewatering | 295.37 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering in Foundations and plinth. Within all leads and lifts. | 5.27 | Cum | - | - |
| 3Providing and laying cement concrete 1:1.5:3(1 cement: 1.5sand: 3graded stone agg.20mm nominal size) and curing complete excluding cost of form work and reinforced work for rainforcement cement concerete work with in all leads and lifts. | |||||
| 3.01 | Foundation footing basis of columns etc. and mass concrete | 11.19 | Cum | - | - |
| 3.02 | Wall any thickness but not less than 0.10 mtr. Thickness attached pillasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level. | 19.16 | Cum | - | - |
| 4Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring,shuttering,propping etc.height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for insitu work in:- | |||||
| 4.01 | Vertical surfaces such as walls(any thickness)bartitions and the like i/c attached,pillasters plinth and string courses and the like within all leads and lifts. | 139.5 | Sqm | - | - |
| 4.02 | Flat surfaces,such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness within all leads and lifts. | 32.51 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
form6and8.pdf
Tender Documents • 0.80 MB
Termsandconditions.pdf
Tender Documents • 0.17 MB
BOQ_201455.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid