| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹79.7 LAccepted-AOC JHARKHAND | ₹79.7 L | 1 | Accepted-AOC WORK ALLOTTED TO AJEET KUMAR, VILLAGE - VISHRAMPUR, P.O. - SANDH, P.S. - BARKAGAON, DISTRICT - HAZARIBAG -825311 VIDE S.E., M.I. CIRCLE, HAZARIBAG LETTER NO. 441 DATED 17.07.2026 AND AGREEMENT DONE |
| 2 | 2₹79.7 LRejected-AOC DHEKAHA DHEKAHA SHEDA PAR KESRIYA SHEDA PAR EAST CHAMPARAN BIHAR 845424 | PURBI CHAMPARAN | BIHAR | 845424 | ₹79.7 L | 2 | Rejected-AOC WORK ALLOTTED TO AJEET KUMAR, VILLAGE - VISHRAMPUR, P.O. - SANDH, P.S. - BARKAGAON, DISTRICT - HAZARIBAG -825311 VIDE S.E., M.I. CIRCLE, HAZARIBAG LETTER NO. 441 DATED 17.07.2026 AND AGREEMENT DONE |
| 3 | 3₹83.4 LRejected-AOC PALANDU BLOCK BARKAGAON HAZARIBAG | ₹83.4 L | 3 | Rejected-AOC WORK ALLOTTED TO AJEET KUMAR, VILLAGE - VISHRAMPUR, P.O. - SANDH, P.S. - BARKAGAON, DISTRICT - HAZARIBAG -825311 VIDE S.E., M.I. CIRCLE, HAZARIBAG LETTER NO. 441 DATED 17.07.2026 AND AGREEMENT DONE |
| 4 | 4₹84.6 LRejected-AOC HAZARIBAG | HAZARIBAGH | JHARKHAND | 825301 | ₹84.6 L | 4 | Rejected-AOC WORK ALLOTTED TO AJEET KUMAR, VILLAGE - VISHRAMPUR, P.O. - SANDH, P.S. - BARKAGAON, DISTRICT - HAZARIBAG -825311 VIDE S.E., M.I. CIRCLE, HAZARIBAG LETTER NO. 441 DATED 17.07.2026 AND AGREEMENT DONE |
| 5 | 5₹86.9 LRejected-AOC GRAM PUNAI DARU HAZARIBAGH | ₹86.9 L | 5 | Rejected-AOC WORK ALLOTTED TO AJEET KUMAR, VILLAGE - VISHRAMPUR, P.O. - SANDH, P.S. - BARKAGAON, DISTRICT - HAZARIBAG -825311 VIDE S.E., M.I. CIRCLE, HAZARIBAG LETTER NO. 441 DATED 17.07.2026 AND AGREEMENT DONE |
Tender Value
₹99.6 L
EMD Value
₹2.0 L
Closing Date
11 May 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
Construction of P.C.C road from Hesalaung Panchayat Primary Health Centre to Cremation ground in Village- Hesalaung, Block- Dari, District- Hazaribag
2026_WRD_113584_1
DMFT/MID/HAZARIBAG/F2 - 04/2026 - 27 (Gr. No. - 03)
Open Tender
Civil Works
Percentage
335 days
DARI, HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.0 L
20 Aug 2026
4 May 2026
13 May 2026
4 May 2026
11 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.(BCD 5.1.1) | 1,823.85 | M3 | 151.82 | ₹2,76,896.91 |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B)(BCD 5.1.2) | 1,823.85 | M3 | 15.51 | ₹28,287.91 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. With Grading-IlI Material. (RCD 4.1.B(iii) ) | 1,215.9 | M3 | 1,680.3 | ₹20,43,076.77 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :-1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). (BCD 5.3.1.1) | 868.5 | M3 | 4,961.73 | ₹43,09,262.51 |
| 5 | Separation membrance of impermeable plastic sheeting 125 micron thick (M-072 RCD Sl.-11(vi)) | 4,275.09 | M3 | 13 | ₹55,576.17 |
| 6 | filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from cutting from foundation and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume). (BCD 5.1.7) | 521.1 | M3 | 55.28 | ₹28,806.41 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete .(BCD 5.3.17.1) | 570.01 | M2 | 194.5 | ₹1,10,866.94 |
| 8 | CARRIAGE OF MATERIAL :-
Cement | 365.3 | MT | 514.6 | ₹1,87,983.38 |
| 9 | Sand | 372.59 | M3 | 372.28 | ₹1,38,707.81 |
| 10 | Stone Chips | 1,961.07 | M3 | 599.8 | ₹11,76,249.79 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_153469.xls
BOQ • 0.38 MB
TENDER_DOCUMENTS_04_03.pdf
Tender Documents • 15.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].