| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC | L1 | Accepted-AOC the lowest bidder is
Varghese Mathew.
Agreement executed on
31/05/2021.Agreement No.
03/EEI/KLM/2021-22 | |
| 2 | L2₹22.8 L+₹58,609.57 (2.64%)Rejected-Finance | L2 | Rejected-Finance Being L2 Bidder | |
| 3 | L3₹23.4 L+₹1.2 L (5.51%)Rejected-Finance | L3 | Rejected-Finance Being L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹37,100
Closing Date
2 Mar 2021, 5:00 pmClosed
Executive Engineer
Irrigation Division, Kollam
SDRF 2018-Flood damages-Restoration of erroded embankment on the left bank of Pampa River in Survey Nos.07/03,06/22 and 06/01 near Arattupuzha kurisu in ward No-01 of Aranmula Panchayath..
2021_Irrig_419743_1
40/EEI/KLM/2020-21
Open Tender
Civil Works - Others
Item Rate
270 days
Aranmula
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,800
Yes
₹37,100
Yes
30 Sept 2024
26 Feb 2021
4 Mar 2021
26 Feb 2021
2 Mar 2021
26 Feb 2021
Amount
side protection
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.7.6 : Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
od42935/2020_2021/IA : Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
SAJAN P MATHEW
K J SIMON
Bidder Name
VARGHESE MATHEW
K J SIMON
SAJAN P MATHEW
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_595838.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .