Loading…
Loading…
Tender Value
₹8.1 L
EMD Value
₹24,291
Closing Date
9 Sept 2026, 6:00 pm
AGM engg civil
O/o. GM (CIC), Begumpet Airport, Hyderabad
AR an MO Civil works at Begumpet Airport Hyderabad 2026-27. SH Clearance of grass and jungle in Residential Colonies at Begumpet Airport including shyamlal area and Satellite Operational Stations in Nadirgul Shamshabad and Vikarabad
2026_AAI_287785_1
Grass cutting 26-27 Non-Ops area
Open Tender
Civil Works
Percentage
365 days
begumpet airport hyderabad
As per enit
11 documents required · 11 mandatory
₹1,180
₹24,291
19 Aug 2026
19 Aug 2026
11 Sept 2026
19 Aug 2026
9 Sept 2026
19 Aug 2026
19 Aug 2026 - 26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DSR- 2023, SCHEDULE-A. | |||||
| 1.01 | Guidelnes for quoting the % rate by the bidder.
1. The rate shall be quoted by the bidder in % (Percentage) only on the DSR – 2023.
2. Bidder is required to quote only one value for percentage which will be applicable to Schedule-A.
3. Bidder should note that the rates calculated for all the items in Schedule A are made at par with the rates of DSR 2023 items.
4. Bidder shall quote rate only in % (Percentage) on Schedule "A wherein 100 is base.
5. Bidder may please note that the payment of DSR Items quoted shall be regulated as follows to arrive rates excluding GST.
Rate of item as per schedule A= ‘X’
Rate to be considered for payment = (‘X’/1.2127) x (100±Quoted percentage)
(Ex.GST) 100
6. Thereafter GST (as applicable) shall be calculated on the gross value of work executed.
7. The percentage rate shall be quoted in digits only with selecting sign of Excess (+) or Less (-).
Following are some examples for quoting the % rate by the bidder:-
a) If Bidder wants to quote 5% below the Schedule- A rates, then the bidder has to select Less(-) from the select pulldown menu and quote 5. As the base estimated rate is 100, the total amount becomes 95.
b) If Bidder wants to quote 4% above the Schedule- A rates, then the bidder has to select Excess(+) from the select pulldown menu and quote 4. As the base estimated rate is 100, the total amount becomes 104. | 1 | Job | 100 | ₹100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
tenderdocument.pdf
Tender Documents • 12.20 MB
BOQ_335992.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].