| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹97.5 L+₹7.5 L (8.30%)Rejected-AOC 52 A CUDDALORE ROAD VRIDDHACHALAM 606 001 CUDDALORE DIST | VRIDDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | L2 | Rejected-AOC L2 |
Tender Value
₹90.2 L
EMD Value
₹90,300
Closing Date
21 Aug 2023, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1
supply and erection of 3 Nos of tower and stringing of panther conductor and Earthwire for deviation of the existing Pugalur - Karur 110 KV feeder in between loc 93/F to 93/H
2023_EB_356254_1
CE/TP-II/TRY/C-14/2023-24
Open Tender
Civil Works
Works
90 days
Manmangalam
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹90,300
Yes
11 Mar 2024
7 Aug 2023
22 Aug 2023
7 Aug 2023
21 Aug 2023
7 Aug 2023
Amount
Schedule A (Civil and Erection works)
Schedule B (Supply of Materials)
Applicable GST Amount (Total GST Amount @18%)
Description of Work / Item(s)
Amount
Line Works
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation in MR and DMR not requiring blasting.
Earth work excavation in hard rock including contol blasting and stacking
Earth work excavation in hard rock measured in solid including Wedging & Cheisling
Fixing of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. as per approved drawing, and specification. LSO tower
PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete.
PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel form box including cost of all materials, lead, lift, chimney box, etc complete .
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Supply and Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Erection of GI tower/tower extension parts ,square cross arm , DP structures with bolt & nuts including sorting out of tower parts as per the specification and punching of bolt & nuts, final checking and all other incidental charges for erection,including cost of all T &P,labour, lead, lift etc complete.as per approved drawing , BOM and specification. The rectification of defects found by operation staff during handing over of line to be done at free of cost.
Transport and Labour charges for Hoisting of 7 units of 90kN suspension insulators with all allied hardwares and necessary fittings , including cost of T&Ps, etc,complete.
with PA ROD
Transport and Labour charges for Hoisting of 8 units of 120kN suspension insulators with all allied hardwares and necessary fittings , including cost of all T & Ps, etc,complete.
Labour charges for transport of 3Nos of Panther conductor from department store, fixing of panther conductor hardwares(ie.SB damper, Dshackle, U bolt etc ), paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete.
Single Span without LC
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares(ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete.
Single Span without LC
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete.
Supply and fixing of number plates, danger board, phase plate including all cost of T&Ps,labour transport,lead, lift,etc complete.
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete.
Providing temporary guys wherever necessary including excavation, buryingout of anchor for stay wire, tightening,dismantling the same after completion of works including cost of all materials, lead,lift,labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete.
Labour charges for removal of Small tree
Labour charges for removal of Large tree
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Releasing , lowering and rehoisting of existing 7 Nos. suspension insulator with SS fittings including all labour,transport lead,lifts,T&P,etc complete.under LC
Releasing,lowering and restringing of existing 3 Nos.panther conductor from existing tower to newly erected tower including all labour, transport lead, lifts,T&P,etc complete.under LC
Releasing,lowering and restringing of Existing 1 No 7/3.55 mm GI earthwire from existing tower to newly erected tower including all labour, transport, lead, lifts,T&P,etc complete.under LC
Dismantling of existing tower sorting out of tower parts at site and devoluted to store for re use including all labour lead lifts etc complete.under LC
Description of Work / Item(s)
Amount
Line works
Supply of GI tower/extension parts/DP structures/X arm including stub & cleat in accordance with boards design as per approved drawing and BOM as detailed in this specification including cost of all materials ,labour, transport,lead, lift etc complete .MS Tower parts.
Supplying of hot dip Galvanising & bolt & nuts,stepbolt with various sizes of required length,Spring Washers as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
Supply & transmission line hard wares as per IS conforming for ACSR panther conductor
Single Suspension fitting
Single tension fittings
PA rod for Panther.
SB Vibration Dampers
Supply & transmission line hard wares as per IS conforming for 7/3.5 mm earth wire
Aluminium earth bond
D Shackle
Supply & transmission line hard wares as per IS conforming
Mid span joint for Panther
Repair sleeve for Panther
Mid span joint for earth wire
ZIYAVUDEEN
ZIYAVUDEEN
JERALIN JERISH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .