Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48,128Accepted-Finance GOVERNMENT OF TRIPURA OFFICE OF THE EXECUTIVE ENGINEER DRINKING WATER AND SANITATION DIVISION UDAIPUR GOMATI DISTRICT TRIPURA | ₹48,128 | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L1₹48,128Accepted-Finance | ₹48,128 | L1 | Accepted-Finance LOWEST BIDDER |
| 3 | L1₹48,128Accepted-Finance 5 PURBA PUTIARY RAMKANTAPUR UDAYCHAL NATUNPALLY KOL 7000104 | 7000104 | ₹48,128 | L1 | Accepted-Finance LOWEST BIDDER |
| Sl No | Description | Qty | Unit | BISWAJIT SAHA H1 | G D CONSTRUCTION H1 | DECORATORS RAJU AND RAJIB BASU H1 |
|---|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for ereteing temporary shed covered with water proof tarpaulin over roof with strong bamboo / sal bullah frame resting on strong sal bullah posts as per direction including maintenance as required (upto 10'-0" min ht. ) roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area) | 1 | Sq. Ft. | 29.68 ₹29.68 | 29.68 ₹29.68 | 29.68 ₹29.68 |
| 2.00 | Hire and labour charges for ereteing temporary shed covered with water proof tarpaulin over roof with strong bamboo / sal bullah frame resting on strong sal bullah posts including walling with water proof tarmaulin as per requirement and direction including maintenance as required (upto 10'-0" min ht. ) roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area) | 1 | Sq. Ft. | 38 ₹38 | 38 ₹38 | 38 ₹38 |
| 3.00 | Hire and labour charges for ereteing temporary shed covered with G.C.I. Tin roofing over strong sal bullah post and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'-0" min ht. ) as per direction. Roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area). | 1 | Sq. Ft. | 42.4 ₹42.4 | 42.4 ₹42.4 | 42.4 ₹42.4 |
| 4.00 | Hire and labour charges for ereteing temporary shed covered with G.C.I. Tin roofing over strong sal bullah post and bamboo framing as per direction. Roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area). | 1 | Sq. Ft. | 44.52 ₹44.52 | 44.52 ₹44.52 | 44.52 ₹44.52 |
| 5.00 | Hire and labour charges for ereteing temporary shed covered with G.C.I. Tin roofing and walling with strong bamboo sal bullah frame resting on strong sal bullah as per requiement and direction including maintenance as required (upto 10'-0" min ht. ) roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area). | 1 | Sq. Ft. | 48.76 ₹48.76 | 48.76 ₹48.76 | 48.76 ₹48.76 |
| 6.00 | Walling with waterproof tarpaulin / hessian with bamboo & sal framing and post complete. | 1 | Sq. Ft. | 14.84 ₹14.84 | 14.84 ₹14.84 | 14.84 ₹14.84 |
| 7.00 | Walling with waterproof tarpaulin / hessian without bamboo & sal framing and post complete. | 1 | Sq. Ft. | 11.66 ₹11.66 | 11.66 ₹11.66 | 11.66 ₹11.66 |
| 8.00 | Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete. (Restricted item) | 1 | Sq. Ft. | 12.72 ₹12.72 | 12.72 ₹12.72 | 12.72 ₹12.72 |
| 9.00 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete. (Restricted item) | 1 | Sq. Ft. | 12.19 ₹12.19 | 12.19 ₹12.19 | 12.19 ₹12.19 |
| 10.00 | Walling with clean G.C.I. sheets with bamboo / sal frame and post complete as per direction. (8 ' 0 " to 10' 0" ht.) | 1 | R. ft. | 48.76 ₹48.76 | 48.76 ₹48.76 | 48.76 ₹48.76 |
Tender Value
₹28 L
EMD Value
₹20,000
Closing Date
1 Apr 2026, 4:00 pmClosed
EXECUTIVE OFFICER CANNING-I
EXECUTIVE OFFICER CANNING-I
DC AND RC CIVIL WORK CANNING-I DEVELOPMENT BLOCK GROUND
2026_ZPHD_1023359_1
Can-I/ELC/ 27-E-119/2026 DATE- 23.03.2026
Open Tender
CIVIL WORKS
60 days
BDO CNG-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
6 Apr 2026
23 Mar 2026
3 Apr 2026
23 Mar 2026
1 Apr 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Hire and labour charges for ereteing temporary shed covered with water proof tarpaulin over roof with strong bamboo / sal bullah frame resting on strong sal bullah posts as per direction including maintenance as required (upto 10'-0" min ht. ) roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area) | |||||
| 2Hire and labour charges for ereteing temporary shed covered with water proof tarpaulin over roof with strong bamboo / sal bullah frame resting on strong sal bullah posts including walling with water proof tarmaulin as per requirement and direction including maintenance as required (upto 10'-0" min ht. ) roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area) | |||||
| 3Hire and labour charges for ereteing temporary shed covered with G.C.I. Tin roofing over strong sal bullah post and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'-0" min ht. ) as per direction. Roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area). | |||||
| 4Hire and labour charges for ereteing temporary shed covered with G.C.I. Tin roofing over strong sal bullah post and bamboo framing as per direction. Roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area). | |||||
| 5Hire and labour charges for ereteing temporary shed covered with G.C.I. Tin roofing and walling with strong bamboo sal bullah frame resting on strong sal bullah as per requiement and direction including maintenance as required (upto 10'-0" min ht. ) roof should be projected upto 2'-0" from all walling. (payment may be made as per floor area). | |||||
| 6Walling with waterproof tarpaulin / hessian with bamboo & sal framing and post complete. | |||||
| 7Walling with waterproof tarpaulin / hessian without bamboo & sal framing and post complete. | |||||
| 8Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete. (Restricted item) | |||||
| 9Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete. (Restricted item) | |||||
| 10Walling with clean G.C.I. sheets with bamboo / sal frame and post complete as per direction. (8 ' 0 " to 10' 0" ht.) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_2515235.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid