Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance KANNUR | KERALA | 670001 | L1 | Accepted-Finance Single bidder quoted this Re-Tender, emergency of work single tender accepted |
Tender Value
₹10.7 L
EMD Value
₹26,850
Closing Date
16 Apr 2022, 4:00 pmClosed
Executive Engineer
Regional Investigation and Quality Control Laboratory, Kozhikode
INVESTIGATION WORK FOR THE IMPROVEMENTS TO ROAD FROM RAMANATTUKARA JUNCTION TO CALICUT AIRPORT JUNCTION ON NH - 966 IN MALAPPURAM DISTRICT
2022_PWD_485408_2
D1/Re-Tender-17/INV/KKD/21-22
Open Tender
Civil Works - Others
Item Rate
MALAPPURAM DISTRICT
The estimate proposes to carry out the DGPS surveying Laying of boundary stone BBD tests for detecting the stability of the existing Roads Taking traffic survey for mid block and Turning movement survey for three arm junction CBR Pavement compo
7 documents required · 7 mandatory
₹2,540
Yes
₹26,850
Yes
30 Apr 2022
11 Apr 2022
18 Apr 2022
11 Apr 2022
16 Apr 2022
11 Apr 2022
Amount
Turning movement survey at THREE ARM Junction - Conducting turning movement survey at junction for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials. Ramanattukara & Airport Junction
Soil Collection & Testing - CBR:- Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site. Ramanattukara & Calicut Airport Junction - NH - 966 (10km)
Conducting Soil Classification test, Modified Proctor Test,and CBR test as per the IS Code guidelines and making report of one soil sample. Ramanattukara & Calicut Airport Junction - NH - 966 (10km)
BBD - Conducting one test consisting of taking deflection at 10points at 50m interval on one km stretch according to specification given in 81-1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Charecteristic deflection of one test from one test data obtained from part 1 ( one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81-1997) and submitting in hard and soft copy. Ramanattukara & Calicut Airport Junction - NH - 966 (10km)
Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers. Ramanattukara & Calicut Airport Junction - NH - 966 (10km)
Detailed topographic survey using Total station/mobile Lider and preperation of site plan of minimum of 15m on either side of the centre line and taking cross section details at 25m intervals on straight roads and 10m interval on curves ( survey includes details of all features as mention in the scope of the in plane terrain work within the limit of the survery). The survey shall be include establishing DGPS control points at starting and ending of the project in pairs and at 4 KM intervels (in pairs) in plane and rolling terrain and 2.5 Km intervels (in pairs) in hilly terrains.IT shall also include establishing inter visible traverse control points not more than 250m apart with accuracy of at least 1:10000 and desirable 1:20000 in distance measurement. Elevation of each other control points connected to MSL of GPS Bench Mark using precision levelling. Seperate bench marks need not be established. Including taking sufficient colour copy prints.(5 Nos). Ramanattukara, Pulikkal, Kottappuram & Airport Road - Junction Ramanattukara & Calicut Airport - Road - NH - 966 (10km)
Establishing DGPS control points onTOR steel bar of 10 mm dia fixed in RCC pillar of size 20x20x70cm embeddded in concrete M15 up to a depth of 40 cm and the balancce 30 cm above the ground shall be painted yellow. Ramanattukara & Calicut Airport Junction - NH - 966 (10km)
Establishing traverse control points with elevations on pillar of size 15cmX15cmX60cm M20 grade RCC pillar with a nail fixed on the top surface. The pillars shall be embedded in the concrete.Spacing 250 M apart as a bench mark - control pillar. The spacing shall be maximum 250 m apart and intervisible. No seperate bench mark need to be established. Ramanattukara & Calicut Airport Junction - NH - 966 (10km)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_698624.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .