Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1Accepted-AOC | ₹1 | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹2+₹1 (100.0%)Rejected-AOC AMDANGRA GP MZ RAJPUR JL NO 143 PLOT NO 822FUND 15TH FC TIED 2 | LUNGLEI | MIZORAM | 796186 | ₹2+₹1 (100.0%) | L2 | Rejected-AOC ABOVE LOWEST BIDDER |
| 3 | L3₹3+₹2 (200.0%)Rejected-AOC | ₹3+₹2 (200.0%) | L3 | Rejected-AOC ABOVE LOWEST BIDDER |
| 4 | L4₹4+₹3 (300.0%)Rejected-AOC | ₹4+₹3 (300.0%) | L4 | Rejected-AOC ABOVE LOWEST BIDDER |
| 5 | L5₹5+₹4 (400.0%)Rejected-AOC | ₹5+₹4 (400.0%) | L5 | Rejected-AOC ABOVE LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M/S RUDRA & co L1 | MANDAL CONSTRUCTION L2 | M/S PAL CONSTRUCTION L4 | SANJIT KUMAR PAL L5 | M.G. CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00VB-G-RAM-G | ||||||||
| 1.01 | Hire charges of Coaltar Boiler 900 to 1400 litres | 1 | Day | 1,463.25 ₹1,463.25 Lowest | 1,500 ₹1,500 | 1,800 ₹1,800 | 1,950 ₹1,950 | 1,504 ₹1,504 |
| 1.02 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper | 1 | Day | 1,658.35 ₹1,658.35 Lowest | 1,700 ₹1,700 | 2,040 ₹2,040 | 2,210 ₹2,210 | 1,703 ₹1,703 |
| 1.03 | Hire charges of Diesel Road Roller- 8 to 10 tonne | 1 | Day | 2,321.69 ₹2,321.69 Lowest | 2,380 ₹2,380 | 2,856 ₹2,856 | 3,094 ₹3,094 | 2,382 ₹2,382 |
| 1.04 | Production cost of concrete by batch mix plant | 1 | cum | 1,248.64 ₹1,248.64 Lowest | 1,280 ₹1,280 | 1,536 ₹1,536 | 1,664 ₹1,664 | 1,289 ₹1,289 |
| 1.05 | Hire charges of Diesel Truck-9 tonne | 1 | Day | 4,682.4 ₹4,682.4 Lowest | 4,800 ₹4,800 | 5,760 ₹5,760 | 6,240 ₹6,240 | 4,804 ₹4,804 |
| 1.06 | Hire charges of Derrick monkey rope | 1 | Day | 1,755.9 ₹1,755.9 Lowest | 1,800 ₹1,800 | 2,160 ₹2,160 | 2,340 ₹2,340 | 1,803 ₹1,803 |
| 1.07 | Hire charges of Pump set of capacity 4000 litres/hour | 1 | Day | 780.4 ₹780.4 Lowest | 800 ₹800 | 960 ₹960 | 1,040 ₹1,040 | 803 ₹803 |
| 1.08 | Vibrator (Needle type 40 mm) | 1 | Day | 1,024.28 ₹1,024.28 Lowest | 1,050 ₹1,050 | 1,260 ₹1,260 | 1,365 ₹1,365 | 1,052 ₹1,052 |
| 1.09 | Machine for rubbing of floors | 1 | Day | 760.89 ₹760.89 Lowest | 780 ₹780 | 936 ₹936 | 1,014 ₹1,014 | 782 ₹782 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
15 Jul 2026, 4:00 pmClosed
Block Development Officer
Block Development Officer
SUPPLY MATERIALS UNDER VB G RAM G FOR TALDI
2026_ZPHD_1031544_10
Can-I/VB-G RAM-G/1584-E-120/2026
Open Tender
SUPPLY OF CIVIL GOODS/EQUIPMENTS
Item Rate
260 days
BDO CNG-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹50,000
29 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
15 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1VB-G-RAM-G | |||||
| 1.01 | Hire charges of Coaltar Boiler 900 to 1400 litres | 1 | Day | 1,500 | ₹1,500 |
| 1.02 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper | 1 | Day | 1,700 | ₹1,700 |
| 1.03 | Hire charges of Diesel Road Roller- 8 to 10 tonne | 1 | Day | 2,380 | ₹2,380 |
| 1.04 | Production cost of concrete by batch mix plant | 1 | cum | 1,280 | ₹1,280 |
| 1.05 | Hire charges of Diesel Truck-9 tonne | 1 | Day | 4,800 | ₹4,800 |
| 1.06 | Hire charges of Derrick monkey rope | 1 | Day | 1,800 | ₹1,800 |
| 1.07 | Hire charges of Pump set of capacity 4000 litres/hour | 1 | Day | 800 | ₹800 |
| 1.08 | Vibrator (Needle type 40 mm) | 1 | Day | 1,050 | ₹1,050 |
| 1.09 | Machine for rubbing of floors | 1 | Day | 780 | ₹780 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_2533019.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .