| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.0 LAdmitted-Finance | -32.99% | ₹44.0 L | L1 | Admitted-Finance |
| 2 | L2₹44.1 LAdmitted-Finance | -32.82% | ₹44.1 L | L2 | Admitted-Finance |
| 3 | L3₹49.2 LAdmitted-Finance | -25.05% | ₹49.2 L | L3 | Admitted-Finance |
| 4 | L4₹53.9 LAdmitted-Finance | -17.86% | ₹53.9 L | L4 | Admitted-Finance |
| 5 | L5₹65.7 LAdmitted-Finance | -0.01% | ₹65.7 L | L5 | Admitted-Finance |
Tender Value
₹65.7 L
EMD Value
₹1.3 L
Closing Date
22 Mar 2026, 6:00 pmClosed
EE C.P. DIV. KOTA
EE C.P. DIV. KOTA
Renovation of Dungarjiya Talab Tehsil Digod District Kota under MJSA 2.0 Phase-II
2026_WRDAS_545727_1
EE C.P. DIV. KOTA NITNO-07/2025-26
Open Tender
Civil Works
365 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
1000 EE C.P. DIV. KOTA
₹1.3 L
Yes
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
22 Mar 2026
13 Mar 2026
10.1 Side shuttering including propping etc. complete (to achieve finish F 2 for 10.1.1 Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete)
10.10 Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. 10.10.1 In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete)
10.9.2 Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. 10.9.2.2 Tor or ribbed bars (IS :1786)
11.1.1 Drilling holes of 35 mm diameter for anchor rods. 11.1.1.1 i) Upto 1.50 m depth
Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete
Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete.
11.12 Preparation of foundation of structure including removal of all loose stones, silt and final washing. 11.12.1 By manual labour
Chipping concrete surface, cleaning the exposed surface of steel and concrete with wire brush, washing with water complete as per specifications excluding scaffolding etc.
18.1 Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. 18.1.1 Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (a) Soft/Loose soil
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as morrum, sand, sandy silt, clay, black cotton soil, kankar, etc (i) Depth upto 1.5 m
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctors density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (b) With lead beyond 250 m and up to 750 m (1/2 Km) Deduct in item no 5.16.1 to 5.16.4 above if Standard Proctors density to be achieved is at least 95%
Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctors density
Watering of earth including cost of carriage of water when source of water is (a) up to 1 Km
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts (a) 23 cm thickness (plus minus 5 % thickness tolerance)
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. (b) In cement sand mortar 1:4
Coursed stone Kharanja masonry (using hammer dressed stones not less than 20 cm in any direction and at least 50 % stones to be more than 23 cm in depth) up to 0.5 thickness on top of exposed face, including all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5
Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: (b) 20 mm
If required as per site, add extra over rate of concrete work with the permission of Superintending Engineer, Rs 175.00 per cum of concrete if computerised mobile transit mixer (i.e Fiori) is used.
9.1 Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 320 kg/ cum of concrete) 9.1.4 20 mm
9.2 Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 400 kg/ cum of concrete) 9.2.4 20 mm
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
TENDER-DOCUMENT.pdf
Tender Documents • 2.64 MB
BOQ_973211.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid