| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.5 LAccepted-AOC AT BHATI ROAD WARD NO 1 P O PS BIRMITRAPUR DIST SUNDARGARH PIN 770033 | SUNDARGARH | ODISHA | 770033 | ₹64.5 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹75.8 LRejected-AOC | ₹75.8 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹75.9 LRejected-AOC | ₹75.9 L | L3 | Rejected-AOC Rejected |
| 4 | L3₹75.9 LRejected-AOC | ₹75.9 L | L3 | Rejected-AOC Rejected |
| 5 | L3₹75.9 LRejected-AOC | ₹75.9 L | L3 | Rejected-AOC Rejected |
Tender Value
₹75.9 L
EMD Value
₹75,900
Closing Date
13 May 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, SUNDARGARH
Construction of Boundary wall for the site proposed for construction of Court Complex building at Nuagaon for the year 2026-27
2026_CERWI_128786_1
OnlineEERKL 02/2026-27
Open Tender
Civil Works - Buildings
90 days
ROURKELA
2 documents required · 2 mandatory
₹10,000
₹75,900
Yes
30 Jun 2026
5 May 2026
15 May 2026
5 May 2026
13 May 2026
5 May 2026
5 May 2026 - 12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil within 50m. initial lead and 1.5m. extra lift over initial lift including rough dressing and breaking clods to maximum 5cm. to 7cm. and laying in layer | 611.03 | One cum | 206.1 | ₹1,25,933.28 |
| 2 | Filling foundation trenches and plinth with excavated earth including laying the earth in layers not exceeding 23.5cm (9) thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer-in-charge. | 366.62 | One cum | 114.5 | ₹41,977.99 |
| 3 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. Measurement will be taken on finished compacted section only). | 48.71 | One cum | 686.9 | ₹33,458.9 |
| 4 | Providing and laying P.C.C. (1:3:6) in foundation trench and below flooring using 40mm down graded chrusher broken HG Metal, including compaction, curing including cost of all materials and labour etc. complete as per direction of Engineer- In -Charge. | 48.71 | One cum | 6,219.5 | ₹3,02,951.85 |
| 5 | Fly ash brick masonry using fly ash bricks of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with cement after immersing the bricks for 6 (Six) hours in water before use in Foundation including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | - | - | - | - |
| 6 | Ground Floor | 88.17 | One cum | 5,219.4 | ₹4,60,194.5 |
| 7 | Fly ash brick masonry using fly ash bricks of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with cement after immersing the bricks for 6 (Six) hours in water before use in superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | - | - | - | - |
| 8 | Ground Floor | 247.81 | One cum | 5,257.7 | ₹13,02,910.64 |
| 9 | R.C.C. work of M20 using 20mm and down graded hard granite crusher broken chipes including laying,hosting,centring & shuttering with all cost,conveyance of material etc.complete. | - | - | - | - |
| 10 | Footing/Pile cap | 95.55 | One cum | 6,638.21 | ₹6,34,280.97 |
stage.html
html • 0.16 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.22 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_589621.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid