| 1 | L1₹2.0 CrAccepted-AOC A PO DANOGAHIR DIST PURI 852105 | DANOGAHIR | PURI | ODISHA | 852105 | ₹2.0 Cr | L1 | Accepted-AOC Awarded as per OPWD code |
| 2 | L2₹2.0 CrRejected-AOC GOBINDPUR DIST JAGATSINGHPUR | JAGATSINGHAPUR | ODISHA | 754102 | ₹2.0 Cr | L2 | Rejected-AOC Rejected as per OPWD code |
| 3 | L3₹2.3 CrRejected-AOC | ₹2.3 Cr | L3 | Rejected-AOC Rejected as per OPWD code |
Updated dates
Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
12 Mar 2026, 11:00 amClosed
Additional Chief Engineer, P.H. Division, Balangir
Additional Chief Engineer, P.H. Division, Balangir
Automation of existing 4.5 MLD Water Treatment Plant and Intake well of Boudh NAC.
2026_PHEO_126686_2
ACEPHBGR 19/2025-26
National Competitive Bid
Civil Works - Water Works
180 days
Boudh Town
Please refer DTCN
3 documents required · 3 mandatory
₹10,000
₹2.6 L
Yes
18 May 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
26 Feb 2026 - 10 Mar 2026
Supply ,Design,Manufacturing all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to run the plant & machineries within the campus limit being operrated remotely from 4.50 MLD WTP campus, with provision of PLC panel for operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through GPRS only and/or integration of SMS communication system for the operation (on & off) of remote station pump house as per the UGR water level. Local data storing facility should be there and as per the future expansion the data should be stored through an application in the server for monitoring and analysis at remote places as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard (Make- (Schneider/Siemens/Rockwell)
Supply, Installation and commissioning of single phase 1 KVA online UPS with pure sine wave & float cum boost charging with battery rack and maintenance free battery system including cables power plug, switch having application in 24V lot DC Battery (drytype) charging to output continious 8 hrs power backup all Complete Works
Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete.
Supply, Installation, Testing & Commissioning of 60HP / 45 kW VFD with panel having provision to run 45 KW ATS as Bypass Starter including supply of all materials, T&P and labour etc. as per direction of The Engineer-In-Charge. (Make-Schnider , simens, Emerson) Intake well VT Pump Set 60 Hp
Supply & Installation,testing & Commissioning of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube at raw water rising main,ingress protection IP65 including cost of all materials, Transportation to site etc all complete as per specification and direction of Engineer-in-charge.Make- Forbes Marshall, Honeywell, Baumer,WIKA at intake site
WTP & CWR Main Control PLC System Supply & Installation,testing & Commissioning of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube at raw water rising main,ingress protection IP65 including cost of all materials, Transportation to site etc all complete as per specification and direction of Engineer-in-charge.Make- Forbes Marshall, Honeywell, Baumer,WIKA at WTP
Supply & Installation,testing & Commissioning of insertion type water Quality analyser with all accessories , mounting bracket with required cable to be installed at raw water open channel with following technical specification :- (A)-pH Analyser, Measurement range-pH 0 to 14, Process temperature-0 to 135 C (32 to 275 F), Process pressure- 1 to 17 bar (15 to 246 psi), (B)- Turbidity Analyser, Measurement range-0.000 to 1500 NTU, Process temperature: 0 TO 60 C, Process pressure: 0 to 4 bar all complete as per specification and direction of Engineer-in-charge Make- Forbes Marshall, Tethys, Horiba, Siemens
Design, Supply, Installation, Testing, Wiring, Programming & Commissioning of PLC panel Made out of 2 MM C.R sheet, Encloser size 800x800x2100mm Duly Powder coated, Floor standing, Front operated, Rear wiring, complete with interconnection with copper wire and lugs.(Make-Rittal, BCH, Hoffman) Having Type 2-1P+N 15kA Surge protection device- 1Nos, 32A 15KA MCB - 1 nos, Redundant Processor below 60ms processing time, Power supply Redundant, DC powered Transistor/Relay based 48DI and 48DO, 16AI & 16AO Ethernet PLC Module, 35 Microsecond Response time for DI/DO Switch on/off, 8ch Analog input module- 2 Nos having 1ms per channel conversion/sampling time. 4Ch Analog Output module - 4 Nos having 1ms per channel conversation/ stabilisation time. Ambient air tempature upto 500C.10'' W touch Panel display having 2 ethernet, USB host & device 24VDC type- 1 Nos (Make- Siemens,Schneider,Allen Bradly). Rated DP Separate DC MCB for Indivisual Modules.. 24VDC 1no. C/O type slim Relay with LED for Digital out put - 36 Nos (make-Wago, Phoenix, P&F). 5 Ch Unmanaged Industrial Grade Switch- 1 Nos. (Make- CISCO, Schneider, Siemense, Allen Bradley, D-Link) .4G ethernet TCP/IP-Modbus Industrial Grade GSM Router - 1 Nos (make- Robustel,Teltonika). 1.5 mmFuse TB with 0.5A glass fuse with Fuse blown indicator type Terminal Block for Digital Input/analog output- 96. 1.5 mm Terminal block for Digital Output - 36Nos. (Make- Wago, Phoenix Contact). 24VDC powered signal isolator for Analog Input - 16 Nos. (Wago,Phoenix), 24 VDC 6Amp redundent Power supply Unit with input and output DC MCB - 2Nos,1 HMI ( Make- Wago, GIC, Phoenix Contact,Siemens,Schneider), Color Coded Terminal Blocks for AC/DC/earth Bus/TB - 50 Nos.(Make- Wago, Phoenix Contact, Connectwell), 2/4/6 Amp AC/DC MCB- 6nos All switchgear and controlgear make- Siemens, Schneider, ABB, L&T. all complete as per electrical specification and as per direction of EIC.
Supply, Installation and commissioning of single phase 1KVA online UPS with pure sine wave & float cum boost charger unit with battery rack and maintenance free battery system including cables power plug, switch having application in 3nos 12Volt 65Ah DC Battery (drytype) charging to output continious 8 hrs power backup all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete as per specification and direction of Engineer-in-charge
Design, manufacture, supply, installation, testing and commissioning of SCADA System(Make-Schiender/Siemen/fox) for WTP Plant, Sand Filter beds & pump house. Windows based PC with latest configuration & OS complete with necessory office & antivirus softwares. PC configuration shall not be less than Intel i5 10th Gen CPU, 16 GB Ram, 128 GB SDD, 500 GB HDD, DVD RW, Rs232 & Rs485 port, 2 RJ45 ports, Keyboard, Optical Mouse, 32 inch color TFT Monitor, Latest Windows Pro OS, Microsoft Office & Antivirus & Internet Sequrity software for 3 years license. SCADA Software of reputed company with developer & runtime license with minimum 512 number of Tags with following features & functions. 1. Supervise real-time data in the form of graphical presentation. 2. Control WTP processes locally or through Remote locations. 3. Dynamic process Graphic, It should resemble the process mimic. SCADA should have good library of symbols so that develop the mimic as per required. When operator sees the screen he should know what’s going in plant. 4. Alarm summery & Alarm history, SCADA system must be able to detect, display, and log alarms and events. When there are problems the SCADA system must notify the operators to take corrective action. 5. Acquire real-time data as well as logs data with Real time trend & Historical time trend. 6. Web Connectivity, Real-time displays can be accessed on remotely attached PCs and notebooks using internet. SCADA Programming shall be done so as operator can visualize and control complete WTP operation from operator desk. All important alarms & events shall be logged. All the data from field instruments & equipments shall be logged. There shall be provision to take reports in required formats of real time & historical data, events & alarms. There shall be provision of broadcasting messages, emails of reporting information. There shall be provision of access sequrity. An Industrial grade Din rail mounting ethernet switch with 5 ports shall be provided. An Industrial grade modem with 4G/5G GSM connectivity shall be provided.
Supply, Installation & Commissioning of 55" LED TV for SCADA PC Extension for operator station all complete as per specification and direction of Engineer-in-charge
Supply, Installation & Commissioning of HP Laser Mono Computer Printers for A4 paper size(HP LaserJet Pro 4004d) all complete as per specification and direction of Engineer-in-charge
Supply,Installation & Commissioning of SCADA PC Lenovo commercial DesktopI5 12gen /8gb/1tb/w11 professional/24" display for engineering station
supply and installation of 5star AC having 2Ton capacity all complete as per the direction of Engineer-In-Charge.
Supply, Installation & Commissioning of Internet Modem with static IP for data communication all complete as per specification and direction of Engineer-in-charge
Supply, Installation & Commissioning of of CAT-6 Dlink cable all materials, labour,T&P for Laying of CAT-6 cable either in HDPE duct underground or GI wire support in case of hanging all complete as per specification and direction of Engineer-in-charge
Open channel type ultrasonic flowmeter with FIT Design, Supply, Installation, Testing & calibration of open chanel type ultrasonic flow Transmitter CE marked with following technical parameters at Raw Water channel and Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-charge (Make-Siemen/Techtrol/Forbes Marshal,) Range- 0 - 5 mtrs Output-4-20 mA / HART Display - 4" LED Power supply - 24V DC ext. Accuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68
Level transmitter Designing, Supplying, installing, commissioning & testing of Ultrasonic level transmitter CE marked at each filter bed with following technical parameters Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-charge Range- 0 - 5 mtrs Output-4-20 mA / HART Power supply - 24V DC ext. Display - 4" LED Accuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68 to be installed at settling tank Make :-Vega, Techtrol, Forbes Marshall,Siemens
Supply,Installation & Commissioning of Advance Active Lightening Protection system fitted with 80mm diameter GI mast by 35mm2 copper cable with proper insulating spacer on the highest point of the structure by connecting to earthing system all complete as per specification and direction of Engineer-in-charge
Supply, Installation & commissioning of single core copper unarmored power cable system including cables to be laid in soil, in trenches, cable to be laid in racks, clipped on walls, cable lugs, cable glands, conduits, cable joints etc. all complete as per specification and direction of Engineer-in-charge 25 Sqmm copper unarmored power cable
50 Sqmm copper unarmored power cable
70 Sqmm copper unarmored power cable
95 Sqmm copper unarmored power cable
Supply, installation of chemical earthing with crystalline conducting material for Back Fill Compound & installation of Maintenance Free Earthing Electrode with ISI mark G.I. Pipe dia 50mm as Secondary electrode with wall thickness of 2.6mm and the primary earthing electrode will be 25mm x 6mm hot dipped galvanized strip filled with a highly conductive & non-corrosive compound in between the primary earthing & the secondary earthing. A solid G.I. Base plate of 300 x 300 mm seals the unit at the bottom. Ground filling compound will be provided in 25kg per bag - 2nos. Excavation of earth pit refilling, Precast RCC chamber with lid etc. all complete as per specification and direction of Engineer-in-charge.
HDPE PIPE: Supply and Laying of 40MM dia HDPE pipe in cable trench or buried all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of Screened unarmoured Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints etc. all complete as per specification and direction of Engineer-in-charge 1.5 sqmm 16 C CU AR Shielded Cable
1.5 sqmm 12 C CU AR Shielded Cable
1.5 sqmm 8 C CU AR Shielded Cable
1.5 sqmm 4 C CU AR Shielded Cable
1.5 sqmm 2 CU AR Shielded Cable
Supply, Installation & Testing of the 25x5mm Earthling strip Along The Cable Trenches or Cable Trays or Fixing to Walls (by Using Proper Size of Spacer and Saddles ) or Structures or buried individually in paved/ unpaved areas (minor civil work like chipping of paved surface finishing after laying grounding loop, etc. Welding at joints, providing anti-corrosive paint for Welded portion, clamping & necessary hardware for connection, excavation & refilling, etc. including provision for risers at places as per approved drawings, all labour to be considered in installation work ) including Earthling saddles, clamps ,terminal ,lugs etc. & all other required materials all complete as per specification, drawings and direction of Engineer-in-charge
Supply, Installation and commissioning of GI perforated cable tray 16 SWG 25mm*100mm*2500mm 8 width to wall, celling with necessary bracket, for laying of power and data cable etc. as per specification. all Complete Works
Supply, Installation and commissioning of single phase 1KVA online UPS with pure sine wave & float cum boost charger unit with battery rack and maintenance free battery system including cables power plug, switch having application in 3nos 12Volt 65Ah DC Battery (drytype) charging to output continious 8 hrs power backup all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of Gigabit SFP to RJ45 Fibre multi Media Converter | Fibre to Ethernet Converter | 10/100/1000Mbps RJ45 Port to 1000Base-LX Dual-Mode Fibre (Make - Delink or equivalent) all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of 24 port fibber optic panel or light interface unit (LIU) draw out Type all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of OFC Splicing with pigtails all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of Fibre Pigtail/patch cord 1 mtr all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of Fibre SFP Multi mode transceiver 100 base LC type module all complete as per specification and direction of Engineer-in-charge
Supply, Installation and commissioning of SM(OS2) Duplex Patch cord 3mtr LC-SC,PC type all complete as per specification and direction of Engineer-in-charge
Level transmitter Designing, Supplying, installing, commissioning & testing of Ultrasonic level transmitter CE marked at wash tank with following technical parameters Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-charge Range- 0 - 5 mtrs Output-4-20 mA / HART Power supply - 24V DC ext. Display - 4" LED Accuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68 to be installed at settling tank Make :-Vega, Techtrol, Forbes Marshall,Siemens
Supply & installation of LOH ( Loss of Head) indicator with display unit - 4 sets at filter house for auto wash of filter bed with following technical specifications:- Housing : Cast Aluminium, Powder Coated. Mounting: Wall Mounting Power Supply : 230 V AC, 50 Hz Power Consumption : 4 VA (approximately) Adjustment Range : Span : Min 10%cof Electrode Length Alarm : A relay C/O rated 6 Amps 230 V, non-inductiveload adjustable throughout range Current output : 4-20mA DC non isolated, max. load resistance 600 Ohms, corresponding to differential level Accuracy : ±4% of Electrode Length Option : 1. Local as well as Control Room Display. 2. Loss of Head (LoH) can be supplied with Rate of Flow (RoF) in a common CA Housing with IP-55 Protection all complete as per specification and direction of Engineer-in-charge Make-Reputed make like Siemens/Sapcon/Pune Techtrol/Trumen
For Clear Water outlet Supply, installation, testing & commissioning of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.
Provision of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete incluiding 30 mtr Screened cable including cost of materials , all labours, T&P etc. all complete as per the direction of Engineer-in-charge.
Supply & Installation of insertion type water Quality analyser with all accessories , mounting bracket with required cable to be installed at raw water open channel with following tevhnical specification :- (A)-pH Analyser, Measurement range-pH 0 to 14, Process temperature-0 to 135 C (32 to 275 F), Process pressure- 1 to 17 bar (15 to 246 psi), (B)- Turbidity Analayser, Measurement range-0.000 to 20 NTU, Process temperature: 0 TO 60 C, Proces pressure: 0 to 4 bar, Make- Forbes Marshall, Tethys, Horiba, Hach
Residual chlorine analyser Design, Supply, Installation,Testing of Residual chlorine analyser / meter must have automatic sensor cleaning facility at pure water sump and Interfacing with PLC panel. Residual Chlorine meter shall comprises of 3 components i.e. sensors,flow through assembly and transmitter with indicator and gives 2 outputs one to Local display & other to PLC including Mounting arrangement. Overall Range : 0 ‐ 8 mg/l (ppm) Accuracy : 2% of full scale Supply Voltage : 230 V ac Each 256718 17602 274320 ‐ Supply Voltage : 230 V ac Output : 4‐20 mA Membrane free sensor of 2 gold plated electrodes for long term stability and reference electrode (ag/Agcl) must be provided to avoid maintenance. IP 65 Nema 4 housing protection class required.all complete as per the direction of Engineer-in-charge.make (Forbes Marshall/Tethys/Horiba/Hach)
Supply & installation of full-bore type electromagnetic water flow meter at various locations for monitoring volume of water flow, with following technical specification: Drinking Water Application, Liner:- Hard rubber, Process Connection:- PN10, St37-2/FE 410W B, flange EN1092, Electrodes:- 1.4435/3161, Calibration: 0.5%, Approval: Nonhazardous area Housing Field Alu, Sensor IP68 NEMA6P, Cable, Remote Version: 20 m coll and signal cable, Power Supply: 20-28VDC /11-40VDC Display: 2-line, push buttons, Make- KROHNE MARSHALL, E&H, ADEPT, ABB, SIEMENS 250mm (RW inlet ) dia Full bore type Electro Magnetic Water Flow meter (10 lakh ESR)
Providing, erecting Electric Valve Actuator for non rising spindle type sluice valve of PN 1.6 rating, totally enclosed, weather-proof and dust proof construction with IP-67, protection class suitable for installation in any position without lubrication, leakage or other operational difficulty with special grease filled gear box and hand wheel for emergency manual operation which will automatically dis-engage on restoration of power to motor and with 10 watt single phase space heater and continuous local mechanical position indicator and individually replaceable counter gear assembly and with two torque and four limit switches with S.S. flap and operated with gear driven cams and of rating 250 Volt, 5 Amp, AC/DC, torque switch dial and with TEFC squirrel cage induction motor working on 440 Volts +/- 10%, 3 phase, 50 Hz AC of intermittent duty rating S2, insulation class "F" and temp rise restricted to class "B" with IP - 67 protection class suitable for DOL starting and with three thermostat and 30% over load margin. The torque rating of reduction gear box shall be atleast 1.5 times max. torque required for opening and closing of valve with integral starter for ON & OFF operation (Make-VAG/AVK/Hawle, Actuator make- Auma/ Rotork) 100mm dia (Gate Valve with actuator)
150mm dia (Gate Valve with actuator)
200mm dia (Gate Valve with actuator)
250mm dia (Gate Valve with actuator)
300mm dia (Gate Valve with actuator)
150mm dia ( actuator)
200mm dia ( actuator)
250mm dia ( actuator)
Supply, Installation, Testing & Commissioning of 100HP / 75 kW VFD with panel having provision to run 75 KW ATS as Bypass Starter including supply of all materials, T&P and labour etc. as per direction of The Engineer-In-Charge. (Make-Schnider , simens, Emerson) CW Pump House Rajbati 100 Hp
Supply, Installation, Testing & Commissioning of 60HP / 45 kW VFD with panel having provision to run 45 KW ATS as Bypass Starter including supply of all materials, T&P and labour etc. as per direction of The Engineer-In-Charge. (Make-Schnider , simens, Emerson) Intake well VT Pump Set 60 Hp
Supply, Installation, Testing & Commissioning of 40HP / 30 kW VFD with panel having provision to run 30 KW ATS as Bypass Starter including supply of all materials, T&P and labour etc. as per direction of The Engineer-In-Charge. (Make-Schnider , simens, Emerson) CW Pump House Rajbati 40 Hp
PLC PANEL & AUTOMATION SYSTEM AT 10 Lakh Ltr ESR at Babu Sahi Supply ,Design,Manufacturing all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to rum the plant & machineries within the campus limit being operrated remotely from 10 Lakh Ltr ESR campus near Baubu sahi , with provision of PLC panel for operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through GPRS only and/or integration of SMS communication system for the operation (on & off) of remote station pump house as per the UGR water level. Local data storing facility should be there and as per the future expansion the data should be stored through an application in the server for monitoring and analysis at remote places as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard (Make- (Schneider/Siemens/Rockwell)
Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete.
Provision of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.(WIKA)
Provision of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete incluiding 30 mtr Screened cable including cost of materials , all labours, T&P etc. all complete as per the direction of Engineer-in-charge.
Supply & installating of Ultrasonic water level transmitter at ESR for monitoring water level as a part of automation of UGR with following technical specification, Level, ultrasonicv, contactless, Applixation : liquids, solids, Sensor: PVDF, Blocking distance : 35cm/1.1ft, lncl. Setup-/diagnostic software, Self cleaning effect of sensor membrance, : Application safety: independent of dielectricity/ density, (Make - Forbes Marshal, Pulsar, Techtrol, ABB, Siemens)
3 mtr. Chemical earthing System.
PLC PANEL & AUTOMATION SYSTEM AT 6 Lakh Ltr ESR at Mahanadi Vihar Supply ,Design,Manufacturing all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to rum the plant & machineries within the campus limit being operrated remotely from 6 Lakh Ltr ESR campus near Mahandi Vihar, with provision of PLC panel for operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through GPRS only and/or integration of SMS communication system for the operation (on & off) of remote station pump house as per the UGR water level. Local data storing facility should be there and as per the future expansion the data should be stored through an application in the server for monitoring and analysis at remote places as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard (Make- (Schneider/Siemens/Rockwell)
Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete.
Provision of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.(WIKA)
Provision of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete incluiding 30 mtr Screened cable including cost of materials , all labours, T&P etc. all complete as per the direction of Engineer-in-charge.
Supply & installating of Ultrasonic water level transmitter at wash water & clear water sump for monitoring water level as a part of automation of UGR with following technical specification, Level, ultrasonicv, contactless, Applixation : liquids, solids, Sensor: PVDF, Blocking distance : 35cm/1.1ft, lncl. Setup-/diagnostic software, Self cleaning effect of sensor membrance, : Application safety: independent of dielectricity/ density, (Make - Forbes Marshal, Pulsar, Techtrol, ABB, Siemens)
3 mtr. Chemical earthing System
PLC PANEL & AUTOMATION SYSTEM AT 3.0 UGR & pump house Campus Rajanpali Supply ,Design,Manufacturing all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to rum the plant & machineries within the campus limit being operrated remotely from 3.0 lakh Ltr UGR campus Rajanpali with provision of PLC panel for operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through GPRS only and/or integration of SMS communication system for the operation (on & off) of remote station pump house as per the UGR water level. Local data storing facility should be there and as per the future expansion the data should be stored through an application in the server for monitoring and analysis at remote places as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard (Make- (Schneider/Siemens/Rockwell)
Supply, Installation, Testing & Commissioning of 60HP / 45 kW VFD with panel having provision to run 45 KW ATS as Bypass Starter including supply of all materials, T&P and labour etc. as per direction of The Engineer-In-Charge. (Make-Schnider , simens, Emerson) Rajanpali 60Hp centrifugal
Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete.
Provision of Pressure transmitter with PT S-10 0-10 BAR with snuber of 316 grade & isolation ball valve with tube including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.(WIKA)
Provision of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete incluiding 30 mtr Screened cable including cost of materials , all labours, T&P etc. all complete as per the direction of Engineer-in-charge.
Supply & installating of Ultrasonic water level transmitter at wash water & clear water sump for monitoring water level as a part of automation of UGR with following technical specification, Level, ultrasonicv, contactless, Applixation : liquids, solids, Sensor: PVDF, Blocking distance : 35cm/1.1ft, lncl. Setup-/diagnostic software, Self cleaning effect of sensor membrance, : Application safety: independent of dielectricity/ density, (Make - Forbes Marshal, Pulsar, Techtrol, ABB, Siemens)
3 mtr. Chemical earthing System
ESR Management Systems (RMS) For Inlet / outlet) Designing, Supplying, Installing, Commissioning & testing of Flow Control Valve / Pressure reducing valve for inlet with flow measuring, flow controlling, pressure monitering & webbased with cable, PLC etc.complete. Hydraulically operated self-actuated Flow & Level Control Valve (either with float oraltitude pilot) with downstreamorifice having Ductile Iron valvebody, Y-Pattern, Doublechamber unitized actuator, Fusion bonded Epoxy coating, Copper control tubing, withLatching Solenoid & Pilot operated as per design, additional Speed control feature, drip tight sealing, Inֺ-line serviceable, Internals Stainlesssteel & protected diaphragm suitable for drinking water (AVK /DOROTS-300 /WRAS/NSF/DVGW approved. 200 mm dia
150mm Dia
Operatoion and maintenance charges on supply of required manpower of technical qualification and experience for the whole water supply scheme on SCADA and generationof daily report of water quality parameter and electrical parameters.The reports of filter bed washing, chemical dosing and others shall be mailed daily to headquarter for daily monitoring purposes. O/M cost for 5 Years (Manpower)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
DTCN.pdf
Tender Documents • 1.17 MB
BOQ_583328.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid