Loading…
Loading…
159 results • Latest
Procurement and installation of 125 KVA DG backup at Baghuabol Pump House at Talcher under DMF Funds for the year 2025-26
Procurement and installation of 250 KVA DG Set at Raw water Intake at Talcher under DMF Funds for the year 2025-26
Construction of water Kiosk at Bhuban NAC under State Plan 2025-26
Construction of water Kiosk at Dhenkanal Municipality (03 Nos) under State Plan 2025-26
Provision of solar lighting arrangements with use of solar panel Renewable Energy in different pump house at Khariar Road Municipality
Provision of solar lighting arrangements with use of solar panel Renewable Energy in different pump houses at Nuapada NAC
Installation and upgradation of zonal pump houses from 63 KVA Sub-Station to 100 KVA Sub-Station at PWD Campus, Nua Sahi pump house Kalimandira, Daulatabad and installation of 100 KVA Sub-Station inside Bodhi Campus, Choudwar.
Supply of ISI Marked Centrifugally Cast Spun Ductile Iron Socket Spigot Pipes confirming to IS83292000 required for the workSinking of 200 mm dia production well and commissioning with internal external electrification, construction of pump house
Supply of ISI Marked Centrifugally Cast Spun Ductile Iron K-7 Socket and Spigot Pressure Pipes conforming to IS8329 and its subsequent amendments and ISI Marked Rubber Gaskets IS5382 for Push-on Type Flexible Joints of DI Pipes of different diameters
Provision of solar lighting arrangements with use of solar panel Renewable Energy in different pump house at Junagada NAC
Provision of solar lighting arrangements with use of solar panel Renewable Energy in different pump house at Kesinga NAC
Provision of solar lighting arrangements with use of solar panel Renewable Energy in different pump house at Khadial NAC
Provision of solar lighting arrangements with use of solar panel Renewable Energy in different pump house at Dharmagada NAC
Supply of ISI Marked Centrifugally Cast (Spun) Ductile Iron Socket and Spigot Pipes in connection with the Work Provision of 24X7 water supply system for 1 no zone of Attabira NAC
Operation and maintenance of water supply system to Athagarh NAC.
Operation and maintenance work of Water Supply through production well under Kendrapara Municipality.
Operation and maintenance of water supply system to Jajpur Municipality.
Construction of Retaining wall with Compound wall near Staff Qtr, Barpali
Rearrangement of existing water supply to CHC Kabisuryanagar under deposit
Operation and Maintenance work of Water Supply System, Choudwar Municipality. (For Eight Months )
Operation and maintenance of water supply system to Banki NAC for six months.
Operation and maintenance of Head works, 8 MLD WTP, Raw water Clear water rising main for water supply to Pattamundai municipality for a period of 6 six months.
Renovation of Chlorination system at 27 MLD WTP in Kendrapara Municipality.
Supply of ISI Marked Centrifugally Cast Spun Ductile Iron Socket and Spigot Pipes in connection with the Work Improvement of water supply to Attabira NAC
Improvement of water supply by development of source and storage arrangements to Patnagarh NAC
Installation of different dia bulk flow meter at distribution system of Tusura town.
Up gradation of transformer with DP structures at Palace Line Pump house, Balangir
Replacement of 50HP VT pump sets at intake well Boudh.
External Electrification to intake well WTP and zonal reservoirs in connection to the work Augmentation of water supply system along with ancillary works for Patnagarh town.
Laying of distribution pipe lines in different zones in connection with the work Augmentation of water supply system along with ancillary works for Balangir town .
Supply of ISI Marked Centrifugally Cast (Spun) Ductile Iron K-7 Socket / Spigot Pressure Pipes required for the work of Procurement of 100mm dia. K7 pipe in connection with the wok-Drinking water supply 24x7 to Internal Zone of Odagaon NAC
Installation of DG sets at 8 MLD WTP and 2.25 MLD WTP including zonal pump houses at Kalimandira, Doulatabad at Nua Sahi at PWD pump house campus and Bodhi pump house in Choudwar Municipality.
Construction ESR and other ancillary work for zone 3 in Balimela NAC under State Plan, D.No.13-4215 SUJALA for the Year 2024-25
Sinking of 200 mm dia production well and commissioning with internal and external electrification, construction of pump house and laying of D.I pipe line at newly development area of Gayatribihar in Ward No. 5 of Paradeep Municipality.
Construction of ESRs for zoning of distribution network in Nabarangpur Municipality under State Plan, D.No.13-4215 SUJALA for the Year 2025-26
Construction of UGR and ancillary work at Govt. ITI Campus, Malkangiri in the district of Malkangiri
Replacement of old VT pumps and Centrifugal pumps at WTP , Intake well and other UGR site in Kendrapara Municipality
Procurement and commissioning of trolly mounted 62.5 KVA and 10 KVA DG set for Tusura NAC
Procurement and commissioning of trolley mounted 160 KVA, 100 KVA and 10 KVA DG set for Balangir Municipality.
Procurement of DI pipe for the work Construction of ESR and other ancillary works in connection with work augmentation of water supply system along with ancillary works for Balangir town.
Upgradation of existing transformers for various pump houses in Jajpur Municipality.
Engagement of agencies for GIS based Asset Survey for Water Supply System including Water Consumers and its mapping for HINDOL, KAMAKHYANAGAR, BHUBAN, DHENKANAL, TALCHER, ANGUL and ATHAMALLIK ULBS UNDER PH DIVISION, ANGUL
Construction of RCC ESR, UGR, Sunken Pump House, CC Road, Compound Wall, Laying of DI CWRM and Distribution Pipeline, External and Internal Electrification and Instrumentation Works with Pumping Arrangement, etc.
Procurement, Installation and Testing of DG set for Zone-4 and 5 for Improvement of water supply to Ranapur NAC
Procurement, Installation and Testing of DG sets at Mamubhanaja and K.K. Nuagaon Pump house under P.H. Section, Balugaon
Procurement, Installation and Testing of DG sets under P.H. Section, Khandapada
Provision of 58.5 KVA DG set including construction of foundation and shed with all accessories in connection with the work Construction of ESR including ancillary works in Zone No-6 on Rukhi Hill in ward No-9 at Nayagarh
Laying of 200mm dia D.I. K-9 / M.S. pipe for CWRM and RWRM pipe line and 100mm dia D.I. K-7 / M.S. pipe for distribution pipe line of Khandapada NAC for widening and strengthening of Khandapada-Fategarh PWD road from 0/00 to 18/030 Km
Improvement of Water supply to Ranapur NAC (Head works for surface source)Package-1, Balance Work
Replacement of old age 200mm dia pipe line from Gandhi Chhaka to Motor Boat Association at Balugaon NAC. ( Laying of pipe line and all Civil work)