Loading…
Loading…
23 results • Latest
Construction of RCC ESR, RCC UGR, Sunken Pump House, CC Road, Boundary Wall, Laying of CWRM, Distribution Pipeline, Pumping Arrangement, External and Internal Electrification, Automation Works
Construction of RCC ESR & RCC UGR Supplying all materials, labour, T&P and design, construction, testing & commisioning of R.C.C Reservoir/ R.C.C ESR and piping arrangement upto 5.0 Running meter from external face, Raft/Pile Foundation & Shaft/Column Staging including all work such as soil investigation, earth work in excavation, back filling & disposal of earth, RCC & PCC of required grade, centering and shuttering, brick work, painting, finishing, connection pipes valves fitting, expansion joint, mechanical level indicator etc with lead of all materials to site.
Construction of 1st Floor of F - type staff quarter in the premises of 2.25 MLD water treatment plant at Binika
Dismantling and removing RCC columns, beams slab staircase, landing, lintels including stacking the useful materials for reuse and removing the debreis within 50 M lead.
Procurement of DI pipe for the work Construction of ESR and other ancillary works in connection with work augmentation of water supply system along with ancillary works for Balangir town.
Supply of ISI Marked centrifugally Cast (Spun)Ductile Iron(K-7/ K-9) Socket & Spigot Pressure Pipes in standard length with inside cement mortar Lining and external bituminous coating conforming to IS 8329:2000 and its subsequent amendments & ISI Marked SB/EPDM Rubber Gasket (IS:5382) for Push-on type Flexible Joints of DI Pipes, with local delivery at consignees’ Stores at P.H. Section, Balangir. The rates shall be inclusive of cost of all materials, Inspection Charges, insurance Charges, packing & forwarding charges, cost of transportation-handing-loading-unloading-stacking at consignees’ store sites, but exclusive of GST all complete. The rates to be quoted shall remain firm and fixed till the date of completion of supply. (Cost of rubber gaskets shall be inclusive in the cost of pipes of different diameters.)
Laying of distribution pipe lines in different zones in connection with the work Augmentation of water supply system along with ancillary works for Balangir town .
Distribution pipe line Network Removing and re fixing of precast cement concrete interlocking paving blocks of all sizes over 200mm thick cource sand bedding (duly compacted) including filling of joints with sand complete in all respect including cast of all taxes, lead, royalty as per the direction of Engineer-in-charge.
Construction of control room with ancillary work at Intake well site, Budelmunda.
Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge.
Up gradation of transformer with DP structures at Palace Line Pump house, Balangir
11kV Line AAAC tapping on RSJ/PSC Pole :- Supplying all materials ,labour, T&P for Erection of POLE PSC 9 METER 300 KG including Tranportation,Stock ,storage and insurance all complete as per direction of EIC.