Tender Value
₹14.9 L
EMD Value
₹15,000
Closing Date
11 May 2026, 4:00 pmClosed
Executive Engineer, Panchayat Irrigation Division
Renovation and Strengthening Work of Toda P.T. (Gamna Padar Valu and Todi Nadi Valu) ( Forth Try)
300351
1 of 2026-27
Open
Civil Works - Water Works
Jamnagar
6 documents required · 6 mandatory
₹900
Executive Engineer, Panchayat Irrigation Division, Jamnagar
₹15,000
1 May 2026
1 May 2026
1 May 2026
11 May 2026
1 May 2026
"Bill Of Quantity"
Name of work: Renovation and Strengthening Work of Toda P.T. (Gamna Padar Valu and Todi
Bill Of Quantity
Memorandum showing Items of Woks to be carried out
Item No. Quantities Item of Works Tendered Rates. Unit Total Amount
Item No. Quantities Item of Works Tendered Rates. Unit Total Amount
Estimated But In In Words According to
may be More or Figures estimated
1 17700.00 Jungle clearance (Ganda Baval etc) 5.00 Rs. Five Only Cum
of Light/Heavy dence (work done by
mannualy or machinery) including
grabbing and removing the roots and
girth completely from the ground &
back fill with the earth & making
surface good as directed with
depositing & removing the material
away from the site of work at own
risk and cost as and where directed
etc completed as following (B)
2 14.00 Dismentaling stone/ Brick masonry & 616.00 Rs. Six Hundred Sqmt
stacking of useful and unusefull Sixteen Only
material from the dismentated
material as directed etc. complete.
(A) In cement mortar
3 37.00 Excavation in all sort of strata and 79.00 Rs. Seventy Nine Cum
formations incl. depositing the Only
unuseful excavated stuff as and
where directed incl sorting and
stacking useful materials in
measureable conditions as directed
upto 200 mt lead etc. complete incl.
dewatering. (A) IN OVERBURDEN
INCL. HARD MURRUM
4 147.00 Excavation in all sort of strata and 176.00 Rs. One Hundred Cum
formations incl. depositing the Seventy Six Only
unuseful excavated stuff as and
where directed incl sorting and
stacking useful materials in
measureable conditions as directed
upto 200 mt lead etc. complete incl.
dewatering. (A) IN SOFT ROCK
5 89.00 Drilling 25 mm dia holes at distance 252.00 Rs. Two Hundred Rmt
as specified and depth upto 3.0 mt Fifty Two Only
for check dam foundation & fixing
anchor bars of specified diameter
with cement grout incl cleaning
holes as directed etc. ( excluding
6 1.60 Providing, cutting, bending, binding, 76574.00 Rs. Seventy Six MT
and fixing in position as per drawing. Thousand five
TMT BAR, reinforcement for R.C.C. Hundred Seventy
works and anchor bars incl. cost of Four Only
black annealed 16 to 18 BWG M.S.
Wire etc. Complete with all lead and
lift. (b) Fe-500
7 220.00 Providing & Laying in position 3724.00 Rs. Three Cum
cement concrete using cement , Thousand Seven
sand and crushed metal coarse Hundred Twenty
aggregate by mass and machine mix Four Only
for PCC/RCC including necessary
formworks compaction by
vibrator,curing as directed with all
lead & lift etc complete. (Excluding
cost of steel )
FOR .BODY WALL, APRON,
TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF
"NOMINAL MIX" Conc. grade 1:2:4
8 5940.00 Excavation for deepening of 68.00 Rs. Sixty Eight Cum
pond/check dam including Only
depositing excavated material Lead
up to 1 Km. With all lift.etc complited
as per instruction of engineer in
Rs. Fourteen Lacs Ninety Four Thousand Sixty Five and Fourty Paisa Only
I/ We am /are willing to carry out the work at ………….....………% above/below percent
above /below percent ( should be written in figures and words) of the estimated rates mentioned above.
Amount of tender works out as under.
*Estimate amount *Estimate amount
Put to tender Rs. Put to tender Rs. …
Deduct : % below Rs Add :..: ……………..% above Rs………
Net. Total Rs………………..
In Words Rs. In Words………………………………………………
*( Please strike out whichever is not applicable)
Note-1:- All works shall be carried out as per Public Works Department, Hand Book & other specifications of Division or as directed.
Note-2:- All the columns in Schedule should be filled in digitally & the total of the entries in the last column should be struck by the contractor under his
Note-3:- Rates quoted include clearance of the site (Prior commencement of work & at its close) in all respects & hold good for work under all conditions,
Note-4 The payment shall be made after availability fund. The contractor has no any claim in this regard.
Note-5 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
Note-6 shall be made.
labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Note-7 GST and Income tax TDS will be deducted at a source while making payments of bills
Note-8 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/ C Date
Note-9 as stated
The rates to be in S.O.R.
quoted bytherefore in R.C.C.
the contractor mustitems where there
be inclusive of allisduties,
a change as and
taxes, per actual mix design
other levies the
Except costpayable
GST of difference
by theofcontractor
cement consumption
contract or for any other cause shall be included in the rates, prices and total Bid Price submitted by the Bidder
Excutive Engineer
Signature of Contractor. Panchayt Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Annexure 2 Technical Specification-toda.pdf
Annexure 2.1 ITEM WISE DETAILED SPECIFICATION Toda.pdf
BOQ TODA.pdf
jaher nivida 26.27.pdf
SBD-Toda.pdf
Download all tender documents and submit your bid