Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder | |
| 2 | L2₹6.7 L+₹39,555 (6.23%)Rejected-AOC | L2 | Rejected-AOC Competent committee rejected the file due to higher rates | |
| 3 | L3₹7.0 L+₹61,030 (9.61%)Rejected-AOC 1ST FLOOR SIDHARTH TOWER BALTI KHARKHANA BYELNE S J ROAD ATHGAON GUWAHATI KAMRUP ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
Tender Value
₹6.3 L
EMD Value
₹6,350
Closing Date
20 Apr 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
Work Of Increasing Capacity of Distribution Transformers and Installation of New Distribution Transformers at various places under EDC, Bareilly ( Summer Plan)
2022_MVVNL_684783_1
06/EDCB/2022-23
Open Tender
Electrical Works
Item Rate
15 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE,EDC
₹6,350
4 Nov 2022
5 Apr 2022
21 Apr 2022
5 Apr 2022
20 Apr 2022
5 Apr 2022
180 days
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDC, Bareilly. Approx. distance upto 100 Km. Including safe loading and unloading.
PCC Pole 8.5 meter long.
Line material i.e., cross arm/ conductor/ pin insulater/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 400 KVA T/F
Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr Long Single Pole
PCC Pole 8.5 Mtr Long Double Pole
Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5 Mtr Long Double Pole
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Dismentaling of Existing Distribution Transformer for inceasing capacity/Shifting complete in all respect
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
3 Phase Arial Bunched Conductor
Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect
Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Mounting of Following Capacity Transformers as per norms complete in all respect -
63 KVA T/F
100 KVA T/F
250 KVA T/F
400 KVA T/F
Back Carriage of Following Capacity Transformers from work site to Store Center, Bareilly approx distance up to 100 km as per norms complete in all respect -
63 KVA T/F
100 KVA T/F
250 KVA T/F
M/S HINA ELECTRICALS
Bharat Trading Corporation
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .