| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC First lowest rate quoted |
| 2 | L2₹6.8 LRejected-Finance | ₹6.8 L | L2 | Rejected-Finance Second lowest rate quoted |
| 3 | L3₹6.9 LRejected-Finance ALOOR THAYALTHOTTY HOUSE MULIYAR | ₹6.9 L | L3 | Rejected-Finance Third lowest rate quoted |
| 4 | L4₹7.0 LRejected-Finance | ₹7.0 L | L4 | Rejected-Finance Fourth lowest rate quoted |
| 5 | L5₹7.2 LRejected-Finance | ₹7.2 L | L5 | Rejected-Finance Fifth lowest rate quoted |
| Sl No | Description | Qty | Unit | SIRAJUDEEN K L1 | KUNHIMAHIN KUTTI HAJI CONSTRUCTION PRIVATE LIMITED L6 | M ABDUL KHADER L4 | ABDULLA A T L3 | ABDUL KHADER N A L5 | SAJEEV P L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SIDE PROTECTION WALL 1.50 Mtr HEIGHT-44.00Mtr | |||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 59.84 | cum | 187.46 ₹11,217.61 | 218.12 ₹13,052.30 | 204.77 ₹12,253.44 | 201.64 ₹12,066.14 | 220 ₹13,164.80 | 197.69 ₹11,829.77 |
| 1.00 | OD1105/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data) | 70.4 | cum | 4,587.86 ₹3.2 L | 5,082.92 ₹3.6 L | 4,771.73 ₹3.4 L | 4,710 ₹3.3 L | 4,900 ₹3.4 L | 4,606.82 ₹3.2 L |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 110.24 | kilogram | 86.33 ₹9,517.11 | 95.18 ₹10,492.74 | 89.36 ₹9,851.14 | 87.99 ₹9,700.11 | 90 ₹9,921.69 | 86.27 ₹9,510.49 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.2 | cum | 7,987.64 ₹17,572.81 | 8,880.5 ₹19,537.10 | 8,336.81 ₹18,340.98 | 8,209.53 ₹18,060.97 | 8,580 ₹18,876 | 8,048.69 ₹17,707.12 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.9 | sqm | 294.35 ₹2,619.72 | 326.94 ₹2,909.77 | 306.93 ₹2,731.68 | 302.24 ₹2,689.94 | 315 ₹2,803.50 | 296.32 ₹2,637.25 |
| 2.00SIDE PROTECTION WALL 2.1 Mtr HEIGHT - 25.50 Mtr | |||||||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 50.49 | cum | 187.46 ₹9,464.86 | 218.12 ₹11,012.88 | 204.77 ₹10,338.84 | 201.64 ₹10,180.80 | 220 ₹11,107.80 | 197.69 ₹9,981.37 |
| 2.00 | OD1106/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data) | 61.71 | cum | 4,587.86 ₹2.8 L | 5,082.92 ₹3.1 L | 4,771.73 ₹2.9 L | 4,710 ₹2.9 L | 4,900 ₹3.0 L | 4,606.82 ₹2.8 L |
| 2.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 64.15 | kilogram | 86.33 ₹5,538.24 | 95.18 ₹6,105.99 | 89.36 ₹5,732.62 | 87.99 ₹5,644.73 | 90 ₹5,773.68 | 86.27 ₹5,534.39 |
Tender Value
₹8.3 L
EMD Value
₹20,768
Closing Date
21 Oct 2025, 6:00 pmClosed
District Soil Conservation Officer, Kasaragod
District Soil Conservation Office, Civil Station, F Block Kasaragod PIN 671123
Side protection wall44Rm 1.50m Ht and 25.50Rm 2.10m Ht.at Panarkulam Valiyamoola Ermalam thodu side protection work in Chengala Pt.
2025_DSSC_807754_1
SOIL/DSSSC/TR/280/2025_5_1_1/1
Open Tender
Civil Works - Others
365 days
Chengala PanchayatMuttathody village
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,835
Yes
₹20,768
Yes
27 Jan 2026
9 Oct 2025
23 Oct 2025
9 Oct 2025
21 Oct 2025
9 Oct 2025
Amount
SIDE PROTECTION WALL 1.50 Mtr HEIGHT-44.00Mtr
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD1105/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
SIDE PROTECTION WALL 2.1 Mtr HEIGHT - 25.50 Mtr
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD1106/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
SAJEEV P (BID ID -2396832)
ABDULLA A T (BID ID -2401034)
M ABDUL KHADER (BID ID -2400936)
ABDUL KHADER N A (BID ID -2400505)
KUNHIMAHIN KUTTI HAJI CONSTRUCTION PRIVATE LIMITED (BID ID -2400778)
Bidder Name
SIRAJUDEEN K
M ABDUL KHADER
SAJEEV P
KUNHIMAHIN KUTTI HAJI CONSTRUCTION PRIVATE LIMITED
ABDUL KHADER N A
ABDULLA A T
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1346639.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
PanarkulamBiddocuments.pdf
Tender Documents • 2.18 MB
BOQ_1346639.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid