| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC First lowest rate quoted |
| 2 | L2₹6.8 LRejected-Finance | ₹6.8 L | L2 | Rejected-Finance Second lowest rate quoted |
| 3 | L3₹6.9 LRejected-Finance ALOOR THAYALTHOTTY HOUSE MULIYAR | ₹6.9 L | L3 | Rejected-Finance Third lowest rate quoted |
| 4 | L4₹7.0 LRejected-Finance | ₹7.0 L | L4 | Rejected-Finance Fourth lowest rate quoted |
| 5 | L5₹7.2 LRejected-Finance | ₹7.2 L | L5 | Rejected-Finance Fifth lowest rate quoted |
| Sl No | Description | Qty | Unit | SIRAJUDEEN K L1 | KUNHIMAHIN KUTTI HAJI CONSTRUCTION PRIVATE LIMITED L6 | M ABDUL KHADER L4 | ABDULLA A T L3 | ABDUL KHADER N A L5 | SAJEEV P L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SIDE PROTECTION WALL 1.50 Mtr HEIGHT-44.00Mtr | |||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 59.84 | cum | 187.46 ₹11,217.61 Lowest | 218.12 ₹13,052.3 | 204.77 ₹12,253.44 | 201.64 ₹12,066.14 | 220 ₹13,164.8 | 197.69 ₹11,829.77 |
| 1.00 | OD1105/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data) | 70.4 | cum | 4,587.86 ₹3,22,985.34 Lowest | 5,082.92 ₹3,57,837.57 | 4,771.73 ₹3,35,929.79 | 4,710 ₹3,31,584 | 4,900 ₹3,44,960 | 4,606.82 ₹3,24,320.13 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 110.24 | kilogram | 86.33 ₹9,517.11 | 95.18 ₹10,492.74 | 89.36 ₹9,851.14 | 87.99 ₹9,700.11 | 90 ₹9,921.69 | 86.27 ₹9,510.49 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.2 | cum | 7,987.64 ₹17,572.81 Lowest | 8,880.5 ₹19,537.1 | 8,336.81 ₹18,340.98 | 8,209.53 ₹18,060.97 | 8,580 ₹18,876 | 8,048.69 ₹17,707.12 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.9 | sqm | 294.35 ₹2,619.72 Lowest | 326.94 ₹2,909.77 | 306.93 ₹2,731.68 | 302.24 ₹2,689.94 | 315 ₹2,803.5 | 296.32 ₹2,637.25 |
| 2.00SIDE PROTECTION WALL 2.1 Mtr HEIGHT - 25.50 Mtr | |||||||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 50.49 | cum | 187.46 ₹9,464.86 Lowest | 218.12 ₹11,012.88 | 204.77 ₹10,338.84 | 201.64 ₹10,180.8 | 220 ₹11,107.8 | 197.69 ₹9,981.37 |
| 2.00 | OD1106/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data) | 61.71 | cum | 4,587.86 ₹2,83,116.84 Lowest | 5,082.92 ₹3,13,666.99 | 4,771.73 ₹2,94,463.46 | 4,710 ₹2,90,654.1 | 4,900 ₹3,02,379 | 4,606.82 ₹2,84,286.86 |
| 2.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 64.15 | kilogram | 86.33 ₹5,538.24 | 95.18 ₹6,105.99 | 89.36 ₹5,732.62 | 87.99 ₹5,644.73 | 90 ₹5,773.68 | 86.27 ₹5,534.39 Lowest |
Tender Value
₹8.3 L
EMD Value
₹20,768
Closing Date
21 Oct 2025, 6:00 pmClosed
District Soil Conservation Officer, Kasaragod
District Soil Conservation Office, Civil Station, F Block Kasaragod PIN 671123
Side protection wall44Rm 1.50m Ht and 25.50Rm 2.10m Ht.at Panarkulam Valiyamoola Ermalam thodu side protection work in Chengala Pt.
2025_DSSC_807754_1
SOIL/DSSSC/TR/280/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Chengala PanchayatMuttathody village
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,835
Yes
₹20,768
Yes
27 Jan 2026
9 Oct 2025
23 Oct 2025
9 Oct 2025
21 Oct 2025
9 Oct 2025
Amount
SIDE PROTECTION WALL 1.50 Mtr HEIGHT-44.00Mtr
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD1105/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
SIDE PROTECTION WALL 2.1 Mtr HEIGHT - 25.50 Mtr
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD1106/2025-2026:Dry masonry using laterite roughly dressed stone of size 30x20x20cm or nearest size foundation and basement including all cost of materials, labour charges etc. (Observed data)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
SAJEEV P (BID ID -2396832)
ABDULLA A T (BID ID -2401034)
M ABDUL KHADER (BID ID -2400936)
ABDUL KHADER N A (BID ID -2400505)
KUNHIMAHIN KUTTI HAJI CONSTRUCTION PRIVATE LIMITED (BID ID -2400778)
Bidder Name
SIRAJUDEEN K
M ABDUL KHADER
SAJEEV P
KUNHIMAHIN KUTTI HAJI CONSTRUCTION PRIVATE LIMITED
ABDUL KHADER N A
ABDULLA A T
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1346639.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
PanarkulamBiddocuments.pdf
Tender Documents • 2.18 MB
BOQ_1346639.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].