Loading…
Loading…
Tender Value
₹43.6 L
EMD Value
₹43,552
Closing Date
22 Jun 2026, 2:30 pm7d left
Municipal Corporation of Rajahmundry
Rajahmundry
Laying of internal CC Roads, Compound wall, Galvalume roof shed ( 3 Nos) at Larriage way, at Slaughter House (Large animals) in 16th division in RMC.
943531
89/MCR/General/2026-27
OPEN - NCB
Similar Work
EAST GODAVARI
9 documents required · 5 mandatory · 4 optional
₹1,542
₹43,552
6 Jun 2026
6 Jun 2026
6 Jun 2026
Earth work excavation in all kinds of Soils for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH VP No. 484. For Manual Means
Earth work for Ordinary Soil excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH for Mechanical Means
Providing Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH Including cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer.
Construction of granual surface course by providing well graded material like 2.36mm to 5mm size HBG Material,spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with rotavator at OMC,and compacting eith three wheel 80-100 KN static roller/vibrator roller 80-100 KN capacity to achieve the desired density,complete as per technical specification clause 402 MORD.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Carting away of excavated earth / debries to a lead of 2KM (the rate including conveyance charges, labour charges for loading, unloading charges) including ideal hire charges of truck etc. complete as directed by the Departmental Authorities of the work.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) Cement component not less than 400Kgs / cum, coarse and fine aggregates conforming to IS:383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Fixing channels for levelling the concrete with beam Vibrator Vaccume dewatering power trowelling to finish the surface including Hire Charges for all materials, labour charges, fuel charges etc., complete for finished item of work including overhead charges & contractor profit etc complete as per s s and directed by the site Engineer.
Auguring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.( upto 300mm Dia)
Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters. ( up to 300mm dia DOUBLE UNDER REAMING).
Providing Plain Cement concrete (1:4:8) (Cement: fine aggregate: coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, on all materials including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc. complete for finished item of work (APSS No. 402).
Providing Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12 mm thick in CM(1:3) excluding seigniorage charges, etc., complete for finished item of work including cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer.
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including centering, shuttering, cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer (Footings )
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including centering, shuttering, cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer (for COLUMNS)
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including centering, shuttering, cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer (For Tie BEAM / PLINTH BEAM)
Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) bars (Fe 415 / Fe500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidential, operational, labour charges such as cutting, bending, placing in position, tying etc. complete for finished item of work in all floors (APSS No. 126). etc., complete as per ss and as directed by the site engineer.
Providing Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive streangth not lessthan 75 kg/sqm for walls for Superstructure Walls including cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer.
Providing Plastering with CM (1:4), 12mm thick single coat in CM including cost and conveyance of all materials like cement, sand, water etc. to site excluding seigniorage charges on all materials, Including all operational, incidential charges on materials and cost of all labour charges for mixing motor, finishing, curing as directed by engineer-in-charge etc. complete for finished item of work (SS 901, 903 & 904)
Manufacturing, supply, delivery and fixing of M.S. Gate with different sizes of angulars and square rods including cost of all materials, conveyance to the work spot and all labour charges welding cutting, bending, painting with redoxide paint and all fabrication charges etc. complete as per S.S and as directed by the departmental authorities.
Exterior walls are painted with one coat of primer and 2 coats of exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidential, labour charges etc. complete for finished item of work as per SS 911 for external walls
Supply and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.47mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours including cost and conveyance of all materials and labour charges etc., complete as per ss and as directed by the site engineer.
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardent (FR) P.V.C. insulated flexible coper cable (ISI MARK) for Phase, Neutral and Earth in existing pipe with 6A switch, Ceiling rose and Modular box and front plate covering to switch control box including all labour charges etc. complete for light, bell, fan and exhaust fan points in Non-Residental Buildings (Primary Light Point)
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardent (FR) P.V.C. insulated flexible coper cable (ISI MARK) for Phase, Neutral and Earth in existing pipe with 6A switch, Ceiling rose and Modular box and front plate covering to switch control box including all labour charges etc. complete for light, bell, fan and exhaust fan points in Non-Residental Buildings (Fan Points)
Supply and fixing of 6A/10A 3/2 Pin 2 Module Modular Socket with shutter with 6A/ 10A 1 way 1 Modular Modular Switch control on a separate switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc. complete. Modular Switch, Socket, Metal box & Cover frame Make: GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.
Supply and fixing of 20-24W, not less than 1100mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with power LEDs, having System Efficacy of >=100 lumens/watt, PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, etc., complete with earth connection and not less than two years warranty Makes: as per list of recommended brands as category I.) LUMINAIRE MAKE : Phillips / GE- Venture / Crompton / Wipro / Bajaj/Havells/ Halonix/Jaquar/HPL/GM / GreenLites / Gold Medal/Eveready/ Rhino/Panasonic b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG/ Everlight including cost of material and conveyance to work spot and all labour charges etc., complete as directed by the departemental authorities.
Supply of 48" (1200 mm) Sweep star rated Ceiling Fan, with double ball bearings, air delivery more than 200 cubic meter / min, but without Regulator.
Painting with Synthetic Enamel paints having VOC (Volatile Organic compound) content less than 50 grams/ litre - Two Coats for New Iron Work of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidential, labour charges etc. complete for finished item of work as per SS 911
Earth work excavation in all kinds of Soils for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH VP No. 484. For Manual Means
Earth work for Ordinary Soil excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH for Mechanical Means
Providing Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH Including cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer.
Construction of granual surface course by providing well graded material like 2.36mm to 5mm size HBG Material,spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with rotavator at OMC,and compacting eith three wheel 80-100 KN static roller/vibrator roller 80-100 KN capacity to achieve the desired density,complete as per technical specification clause 402 MORD.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Carting away of excavated earth / debries to a lead of 2KM (the rate including conveyance charges, labour charges for loading, unloading charges) including ideal hire charges of truck etc. complete as directed by the Departmental Authorities of the work.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) Cement component not less than 400Kgs / cum, coarse and fine aggregates conforming to IS:383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Fixing channels for levelling the concrete with beam Vibrator Vaccume dewatering power trowelling to finish the surface including Hire Charges for all materials, labour charges, fuel charges etc., complete for finished item of work including overhead charges & contractor profit etc complete as per s s and directed by the site Engineer.
Auguring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.( upto 300mm Dia)
Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters. ( up to 300mm dia DOUBLE UNDER REAMING).
Providing Plain Cement concrete (1:4:8) (Cement: fine aggregate: coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, on all materials including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc. complete for finished item of work (APSS No. 402).
Providing Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12 mm thick in CM(1:3) excluding seigniorage charges, etc., complete for finished item of work including cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer.
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including centering, shuttering, cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer (Footings )
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including centering, shuttering, cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer (for COLUMNS)
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including centering, shuttering, cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer (For Tie BEAM / PLINTH BEAM)
Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) bars (Fe 415 / Fe500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidential, operational, labour charges such as cutting, bending, placing in position, tying etc. complete for finished item of work in all floors (APSS No. 126). etc., complete as per ss and as directed by the site engineer.
Providing Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive streangth not lessthan 75 kg/sqm for walls for Superstructure Walls including cost and conveyance of all materials and all labour charges etc., complete as per ss and as directed by the site engineer.
Providing Plastering with CM (1:4), 12mm thick single coat in CM including cost and conveyance of all materials like cement, sand, water etc. to site excluding seigniorage charges on all materials, Including all operational, incidential charges on materials and cost of all labour charges for mixing motor, finishing, curing as directed by engineer-in-charge etc. complete for finished item of work (SS 901, 903 & 904)
Manufacturing, supply, delivery and fixing of M.S. Gate with different sizes of angulars and square rods including cost of all materials, conveyance to the work spot and all labour charges welding cutting, bending, painting with redoxide paint and all fabrication charges etc. complete as per S.S and as directed by the departmental authorities.
Exterior walls are painted with one coat of primer and 2 coats of exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidential, labour charges etc. complete for finished item of work as per SS 911 for external walls
Supply and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.47mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours including cost and conveyance of all materials and labour charges etc., complete as per ss and as directed by the site engineer.
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardent (FR) P.V.C. insulated flexible coper cable (ISI MARK) for Phase, Neutral and Earth in existing pipe with 6A switch, Ceiling rose and Modular box and front plate covering to switch control box including all labour charges etc. complete for light, bell, fan and exhaust fan points in Non-Residental Buildings (Primary Light Point)
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardent (FR) P.V.C. insulated flexible coper cable (ISI MARK) for Phase, Neutral and Earth in existing pipe with 6A switch, Ceiling rose and Modular box and front plate covering to switch control box including all labour charges etc. complete for light, bell, fan and exhaust fan points in Non-Residental Buildings (Fan Points)
Supply and fixing of 6A/10A 3/2 Pin 2 Module Modular Socket with shutter with 6A/ 10A 1 way 1 Modular Modular Switch control on a separate switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc. complete. Modular Switch, Socket, Metal box & Cover frame Make: GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.
Supply and fixing of 20-24W, not less than 1100mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with power LEDs, having System Efficacy of >=100 lumens/watt, PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, etc., complete with earth connection and not less than two years warranty Makes: as per list of recommended brands as category I.) LUMINAIRE MAKE : Phillips / GE- Venture / Crompton / Wipro / Bajaj/Havells/ Halonix/Jaquar/HPL/GM / GreenLites / Gold Medal/Eveready/ Rhino/Panasonic b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG/ Everlight including cost of material and conveyance to work spot and all labour charges etc., complete as directed by the departemental authorities.
Supply of 48" (1200 mm) Sweep star rated Ceiling Fan, with double ball bearings, air delivery more than 200 cubic meter / min, but without Regulator.
Painting with Synthetic Enamel paints having VOC (Volatile Organic compound) content less than 50 grams/ litre - Two Coats for New Iron Work of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidential, labour charges etc. complete for finished item of work as per SS 911
Details of Maximum amount reimbursable to the Contractor.
1) Provision for GST @18%
2) Provision for NAC @ 0.10%
3) Provision for Seigniorage charges
4) DMF @30% on Seigniorage charges
5) MERIT @2% on Seigniorage charges
6) Consideration 100% on Seigniorage charges
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Doc.doc
TENDER_DOCUMENT • 0.65 MB
BOQ TS 4 Nit 89.xlsx
TENDER_DOCUMENT • 0.09 MB
Print TS 4 Nit 89.xls
TENDER_DOCUMENT • 0.07 MB
Notice 2026.doc
TENDER_DOCUMENT • 0.10 MB
Contractor Information.pdf
TENDER_DOCUMENT • 0.09 MB
Download all tender documents and submit your bid