Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹37.9 L+₹41,953 (1.12%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹38.8 L+₹1.3 L (3.43%)Rejected-Finance D NO 9 947 66 DOCTORS COLONY SHIVAJI PLEM VISAKHAPATNAM 530017 | VISAKHAPATANAM | ANDHRA PRADESH | 530017 | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹43.4 L+₹5.9 L (15.7%)Rejected-Finance D NO 71 31 96 6 ASRR COLONY MALKAPURAM POST VISAKHAPATNAM 530 011 | VISAKHAPATANAM | ANDHRA PRADESH | 530011 | L4 | Rejected-Finance Not Lowest |
Tender Value
₹42.6 L
EMD Value
₹85,200
Closing Date
24 Oct 2022, 6:00 pmClosed
Garrison Engineer P Navy Kalinga Visakhapatnam
Garrison Engineer P Navy Kalinga Military Engineer Services INS Kalinga PO Visakhapatnam 531 163
ADDN ALTN TO BLDG. NO P-179 P-102 (STP) AND PROVN OF NON CLOGGING PUMPS, DOZING PUMPS AND FLOAT SYSTEM ARRANGEMENT ALONG WITH CONNECTED ITEMS AT EXISTING STP UNDER LBW AT NAVAL STATION BHEEMUNIPATNAM UNDER GE(P) NAVY KALINGA
2022_MES_553447_1
GE (P)/N/K/8958 OF 2022-23
Open Tender
Civil Works
Item Rate
545 days
Garrison Engineer P Navy Kalinga Visakhapatnam
Class D, Category a(ii)
6 documents required · 6 mandatory
₹500
Garrison Engineer P Navy Kalinga Visakhapatnam
₹85,200
Yes
5 Jan 2023
21 Sept 2022
26 Oct 2022
21 Sept 2022
24 Oct 2022
10 Oct 2022
Amount
PHASE-I (Sch 'A', Part-I)
Supplying, installing, testing and commissioning of Electrically Driven Non-Clog Horizontal Openwell Submersible Pump Set Pump Set of 6 KW / 7.5 HP Capacity, Non-clog to pass 35mm size particles including supply, installation , testing complete, suitable for a discharge capacity of 1395 LPM at 10 metres head in wet well, 2900RPM, IP 68 Protection with minimum operating temperature 40°C, suitable for operation 440 Volts, 3 Phase, 50 Hz, AC Supply, Delivery Casing, Impeller and Motor body made of Cast iron including provision of float switch for automatic cutoff and connecting up with suitable size of copper conductor cable from Panel to Pump complete all as specified and as directed by Engineer-in-charge.
Supplying, installing, testing and commissioning of Electrically Driven Non-Clog Sludge Pump Set of 1.5 KW / 2.0 HP Capacity, Non-clog to pass 35mm size particles including supply, installation , testing complete, suitable for a discharge capacity of 327 LPM at 10 metres head in wet well, 2900 RPM, IP 68 Protection with minimum operating temperature 40°C, suitable for operation 440 Volts, 3 Phase, 50 Hz, AC Supply, Delivery Casing, Impeller and Motor body made of Cast iron including provision of float switch for automatic cutoff and connecting up with suitable size of copper conductor cable from Panel to Pump complete all as specified and as directed by Engineer-in-charge.
Supplying, installing, testing and commissioning of Electrically Driven Chlorine dosing Pump Set of cables, earthing, testing complete, suitable for a output capacity of 0-20 LPH including all accessories like lead tubing, connecting ferrule, check valve all as per OEM specification etc along with tank of net capacity 170 Litres, dia of FRP dosing tank 650, net height 375mm and conical 300mm, IP 68 Protection with minimum operating temperature 40°C, suitable for operation 230 Volts, 3 Phase, 50 Hz, AC Supply, and the system will also be consisting of water inlet line, outlet line with Y strainer and agitator of 120 watt 900 RPM single phase flange mounted motor with plastic shaft and impeller and service tank of net capacity 100 Liters, connecting up with suitable size of copper conductor cable from Panel to Pump complete all as specified and as directed by Engineer-in-charge.
Supplying, installing, testing and commissioning of Electrically Driven Non-Clog Horizontal Sludge Water Pump Set of 1.5 KW / 2 HP Capacity, 2900 RPM , Non-clog to pass 40mm size particles including supply, installation , testing complete, suitable for a discharge capacity of 590 LPM at 12 metres head in wet well, IP 68 Protection with minimum operating temperature 40°C, suitable for operation 440 Volts, 3 Phase, 50 Hz, AC Supply, Delivery Casing, Impeller and Motor body made of Cast iron including provision of float switch for automatic cutoff and connecting up with suitable size of copper conductor cable from Panel to Pump complete all as specified and as directed.
Supplying, installing, testing and commissioning of Electrically Driven Non-Clog Horizontal Sludge Water Pump Set of 0.7 KW / 1 HP Capacity, 2900 RPM , Non-clog to pass 40mm size particles including supply, installation , testing complete, suitable for a discharge capacity of 590 LPM at 12 metres head in wet well, IP 68 Protection with minimum operating temperature 40°C, suitable for operation 440 Volts, 3 Phase, 50 Hz, AC Supply, Delivery Casing, Impeller and Motor body made of Cast iron including provision of float switch for automatic cutoff and connecting up with suitable size of copper conductor cable from Panel to Pump complete all as specified and as directed.
M&L for Servicing of 440 Volts, 3 Phase, 50 Hz, AC Supply 300 Cum Air Blower , including Necessary accessories Like Lubricant oil, Casing, Discharge Connection Pipe, shaft, Oil Seal, Bearings, Rotor Timer, Labyrinth Seal, Wall Plate with replacing the Spares and making it in Good Running Condition all as specified and directed by Engr-in-charge.
Supplying of approved Culture & Catalyst in form suitable for Sewage Treatment Plant with MBBR Technology including filling and supervision as per the directions of Specialist technology provider all as specified and as directed by Engineer-in-charge. Note : Testing of culture and catalyst shall be done from any Govt approved Lab
S & F Butterfly Valve, 50mm Bore, Class PN-1.6, Flanged and Drilled, Cast Iron Body, SGI [Nylon Coating] Disc with hand lever operated for manual operation including all Joints with Rubber Gasket and Jointing Materials, Bolts, Nuts, Washer complete all as specified and as directed.
Dismantling of Butterfly Valve, 50mm Bore, Class PN-1.6, Flanged and Drilled, Cast Iron Body, SGI [Nylon Coating] Disc with hand lever operated for manual operation including all Joints with Rubber Gasket and Jointing Materials, Bolts, Nuts, Washer complete all as specified and as directed.
Dismantling of Partition walls in existing aeration tank and providing necessary plastering and water proofing ,concrete work to convert into diffused aeration tank all as specified and directed by Engr-in-charge.
M&L for Providing necessary diffused system in the aeration tank with fine and coarse bubble diffusers with necessary pipe line arrangement in the aerated tank of diffusers 63 dia x 300 mm all as specified and directed by Engr-in-charge.
S & F of Float system arrangements for all the existing and newly provided pumps by providing the necessary arrangements of relays and timer system required for the control panel including wiring as directed all as specified and directed by Engr-in-charge.
Supplying and installing manual bar screen, installed in the sewage water channel with necessary supports including provision of hand rake for manual removal of debris and lifting lugs complete all as specified and as directed by Engineer-in-charge. Note: The bar screen chamber consist of two screens a coarse screen followed by a fine screen having required angle of elevation and as per latest design norms laid by NGT/State Pollution Control board/ Central Pollution Control Board to match Existing Capacity of STP
M & L Cleaning of Sewage treatment plant coagulation tank with necessary supports including provision of manual removal of debris and lifting lugs complete all as specified and as directed
M & L Cleaning of Sewage treatment plant Aeration tank with necessary supports including provision of manual removal of debris and lifting lugs complete all as specified and as directed
M & L Cleaning of Sewage treatment plant Treated tank with necessary supports including provision of manual removal of debris and lifting lugs complete all as specified and as directed
M & L Cleaning of Sewage treatment plant collection round tank with necessary supports including provision of manual removal of debris and lifting lugs complete all as specified and as directed
Construction of RCC tank For Sludge settling process before pumped to the treated water tank new tank sizes 2.0 M X 2.0 M X 2.5 M with necessary brick work and plastering including painting all as directed and specified by Engr-in-charge. Note : Drawing for the same to be submitted to Engr-in-Charge for approval duly vetted by Andhra University or any Govt Institute.
Construction of RCC Pit For Sludge handling before pumped to the bar screen chamber. Sludge pit will hold heavy particles settled at Newly constructed sludge settling tank (1mtr x 1mtr x 1mtr) with necessary brick work and plastering including painting all as directed and specified by Engr-in-charge. Note : Drawing for the same to be submitted to Engr-in-Charge for approval duly vetted by Andhra University or any Govt Institute.
S & F of UPVC Pipe for Sludge bed pit of 50 mm bore, of pressure rating 10 KGf / Sq.cm including all fittings such as bends, tees, short pieces, connectors, elbows, reducers, sockets etc and fixed to walls, ceiling, and laid on floors including testing complete all as specified and as directed.by Engr-in-charge
S & F of UPVC Pipe for Aeration tank and Air blower of 50 mm bore, of pressure rating 10 KGf / Sq.cm including all fittings such as bends, tees, short pieces, connectors, elbows, reducers, sockets etc and fixed to walls, ceiling, and laid on floors including testing complete all as specified and as directed.by Engr-in-charge
M & L for tube settler media in the settling tank with supports at ends and laying of media in the tank as directed the aperture diameter of each tube 25 mm dia all as specified and directed. Note : The bidder should provide warranty on the item for at least 05 yrs and the shape and size of the tube settler Media should be as per latest design norms laid by NGT/State Pollution Control Board/ Central Pollution Control Board to match the existing Capacity of STP
Earthwork excavation for foundations of building and depositing the earth on bank with an initial lead of 10m and initial lift of 2m in ordinary gravelly soils including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T&P, labour charges etc complete for finished items of work all as directed and specified by Engr-in-charge
Filling with Sand in trenches, sides of foundations & basement by watering and ramming including all operational, incidental, labour charges, hire charges of T&P etc complete including cost and conveyance of material and labour charges etc complete for finished item of the work all as directed and specified by Engr-in-charge
Supply only surface water test kit easy to use test for ammonia ( 0-2.4 mg/l), chlorine (0-3.4 mg/l), PH- (0-14) , nitrate (0-40 mg/l), dissolved oxygen (0.2-20 mg/l), Phosphorous (0-40 mg/l) for monitoring the source water and waste water Treatment. Note- The kit includes PH Pocket Pro tester and all necessary reagents and apparatus for testing. Make- HACH INDIA Product id- 255893 or Equivalent
Note for Sch 'A', Part-I : (i) Necessary arrangement should be made by the contractor for disposal of raw sewage during execution of work. Any cost incurred on this account is deemed to be included in the quoted rate. No claim whatsoever shall be entertained in this reagrd. (ii) From BOQ item No 1.01 to 1.05 all unit rate quoted by the contractor includes dismantling of pumps if required, submitting to MES store and making PCC Foundation as per IS Norms or by Manufacturer instruction. No extra Charges will be paid to the contractor. (iii) Any modification required in the existing pipeline is deemed to be included in BOQ item quoted rate. (iv) Dismantling of Unserviceable Tube settler media is deemed to be included in the BOQ item quoted rate. (v) The contractor is required to submit a schematic layout of the plant on wood /PVC sheet after the completion of Phase I
PHASE-II (Sch 'A', Part-II)
M&L for testing of inlet and outlet sewage samples fortnightly for all parameters as per Environmental Protection Act / NGT/ State Pollution Board norms for effluent discharge into inlet surface water form NABL recognised or approved institute/test labs and submit the test report complete all as directed by Engr-in- Charge. Note : (i) Testing of one sample each for inlet and outlet shall be considered as one job all as specified and directed by Engineer-in- Charge for a period of one year after the completion of the work. (ii) The rate also includes the cost of running and operation of STP with adequate resources for a period of one year from the certified date of completion.
BSA INFRA
SRIVALLI ENGINEERS
SRI RAJA RAJESWARI ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .